Samaraneftegaz - Rosneft Office Building, Samara, Russian Federation

Samaraneftegaz - Rosneft Office Building

Факти за проекта:

Samara, Russian Federation
Офис сграда
Многослойни тръбни системи
Завършване: 2004

Участие на Uponor

13500
Samaraneftegaz OJSC is the largest oil and gas company of Rosneft OJSC in the Samara region and the second according to the volume of production, after Yuganskneftegaz in Russia. Samaraneftegaz OJSC was established in May 1994. Rosneft acquired Samaraneftegaz in May, 2007 at the auction. Rosneft OJSC is the leader of the Russian oil industry and one of the largest public oil and gas companies worldwide. The main activities of Rosneft are exploration and production of oil and gas, production of petroleum products and petrochemicals, and marketing of these products. Company is included in the list of strategic enterprises of Russia. Its main shareholder (75.16% of shares) is Rosneftegaz OJSC 100% owned by the state.

The construction project of the central office of Samaraneftegaz was one of the first realized construction projects of the development of new business areas of Samara and areas adjacent to the Volga River.

The 17-storey office building 75 meters height accommodates offices of "Class A" supposed for 630 working places at the total area of 13,500 square meters.

Samaraneftegaz central oddice building is a part of a planned large business complex which will be erected on the banks of the Volga River. This mostly explains the architecture and design of the project. Tower of irregular shape in the form of sails with facades of glass and green marble was built in the area of the former industrial zone on the quay of Samara in the shortest terms. Construction of the facility was led by the Turkish Koray Group of Companies. Construction works began in September 2003 and ended within 14 months only.

This is a high comparing with the traditional buildings of Samara construction consists of two towers, which are connected with each other in the last two floors. It is considered one of places of attractions of Samara. Apart the office premises the building has several conference rooms, cafeteria, recreation rooms, open office space and underground parking.

Информация за проекта

Информация за проекта

Адрес
Сrossjunction of Volzhsky pr. and Pervomayskaya str.
Държава
Russian Federation
Завършване
2004
Тип на проекта
Нова сграда
Тип сграда
Офис сграда

Партньори

Партньори

Подобни проекти

HAMK's zero-energy hall uses energy piles

HAMK's zero-energy hall uses energy piles

Construction of Finland's first virtually zero-energy hall was completed in May 2015. The hall was built for the Thin Sheet Centre research unit of the Häme University of Applied Sciences (HAMK) and it draws its energy primarily from energy piles and solar panels.
Day-care centre to be built with energy piles

Day-care centre to be built with energy piles

As requested by the City of Vantaa, the Vaaralanpuisto day-care centre has been planned based on the "nearly 0 energy days" concept. Construction work for the day-care centre began in late summer 2016, and the project will be completed in July 2017. Project costs are estimated at EUR 5.4 million, and the day-care centre will accommodate about 130 children. Among the various energy production options available for the site, the City of Vantaa chose the energy pile and solar thermal collector system jointly developed by Uponor and Ruukki.
Institut les Mines Telecoms Saclay

Institut les Mines Telecoms Saclay

Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.

Auron

Auron

The Uponor Contec ON concrete surface activation heats and cools the AURON office building complex in Munich.
Brain Box Berlin

Brain Box Berlin

Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.

 

First Uponor Comfort Panel project in Hungary

First Uponor Comfort Panel project in Hungary

An office building, where proper comfort is provided for doing your job The commercial buildings provide more or less limited space as the workplace for people. Therefore cooling the air is an important factor in maintaining their comfort during their stay. In order to keep the daily work undisturbed, the system used should be installed easily, should be efficient economically, and should be hygienic.
Standard Bank

Standard Bank

Uponor PE-Xa pipe used for refurbishment of chilled water pipelines in the head office of South Africa's Standard Bank located in Johannesburg.
Immeuble Delta Green

Immeuble Delta Green

La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.

Posco Green building

Posco Green building

POSCO Green Building located on the Yonsei University International Campus in Songdo,  has been equipped with radiant underfloor heating and cooling and Comfort panels from Uponor.
Agder fengsel in Norway

Agder fengsel in Norway

Statsbygg har fått i oppdrag av Justisdepartementet å bygge nytt fengsel i Agder, med avdelinger i Mandal og på Froland. Uponor fikk i oppdrag med å levere gulvvarme til begge fengslene, ca 100 000 meter med rør. Det er lagt gulvvarme i alle  rom på begge prosjektene. Uponor har også levert tappevann; Mandal fengsel med nye PPM fordelere, Froland fengsel messingfordelere. Uponor har også levert noe Ecoflex rør til prosjektene.
The New Deichmanske Library - Bjørvika, Oslo

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.
Sunesis school scheme: Sacred Heart Primary School, West Midlands

Sunesis school scheme: Sacred Heart Primary School, West Midlands

Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.

Rivergate

Rivergate

The RIVERGATE office building in Vienna, Austria, was certified as a Green Building by the EU andrelies on the efficient Contec ON concrete surface activation.
Berger Logistik

Berger Logistik

Berger Logistik transports goods by land, sea and air around the globe. The company was founded in 1961 by Johann Berger and is based in Wörgl, in the Tyrol region of Austria.