Elverum Helsehus installed intake and outlet ventilation from Uponor Infra
The largest building project during 2017
The largest building project during 2017
The City of Espoo is the first in Finland to introduce the Vortex stormwater separation chamber. It can be used to efficiently separate floating and descending solids from stormwater. The aim is to reduce the maintenance costs of the retention system built from stormwater tunnels and prevent solids from ending up in waterbodies.
The modernisation of the wastewater treatment plant is a key task of the project "Comprehensive modernization of wastewater treatment plant in Opole along with improvement of water and wastewater management".
The Bävern block, located in the center of Karlstad, is a residential building that was completed in early 2023. Skanska, who built the homes, chose Uponor underfloor heating instead of radiators and also a variant that is completely new on the Swedish market and is adapted for multi-family buildings.
In Deutschlands Gipfelrestaurant auf knapp 3.000 Metern sorgt Uponor für angenehme Temperaturen und hygienisches Trinkwasser.
The new concert hall is an outstanding building and a new benchmark. Uponor has been involved for the underfloor heating and plumbing system as well as snow melting system for outdoor areas.
The RIVERGATE office building in Vienna, Austria, was certified as a Green Building by the EU andrelies on the efficient Contec ON concrete surface activation.
A biological chemical treatment plant became the solution
The modern Uponor Thermatop M heating system ensures perfect comfort in the new gastropub of Kantyna u Konicku.
Reconstruction of the historic building into 46 apartments and 4 studios using Uponor products.
Connect the buildings to the district heating system that supplied the two site’s 300 apartments with hot water.
The plumbing company Mälardalens Rör in Västerås moved from their premises that they had been in since the end of the 80s. In November 2021, the first test trench was taken and at the turn of the year 2022/2023 they moved into the new office on a plot of land they have owned for a long time. We visited and spoke with the owners Robert Lind and Veronica Lange to hear more about the project.