Radisson Blu, Bloomington, MN, USA
Miles of pipe, weeks of labor savings
Since its groundbreaking in May 2011, the structure has accumulated more than 1.2 million pounds of structural steel and 24,000 cubic yards of concrete in addition to 23,000 feet (nearly 4½ miles) of Uponor AquaPEX® crosslinked polyethylene (PEX-a) pipe for the plumbing system.
Fakten zum Projekt
Beteiligung von Uponor
Project highlights
- LEED® Certified
- 570,000 square feet
- 13 stories
- Uponor PEX in 11 occupied floors (3rd-13th floors)
- 50 units per floor
Products Used
- 23,637 ft. of ½"-2" Uponor AquaPEX®
- ½"-2" ProPEX® fittings
- Engineered polymer (EP) fittings, multi-port tees
- Lead-free brass drop ear elbows and copper adapters
Using large-dimension Uponor PEX to prefab risers leads to greater installation efficiencies
“Joe put me in touch with the project manager and I pitched Uponor PEX for both the risers and the distribution piping,” says Corrigan.
Corrigan and his counterpart at FourMation, Kevin Barta, started working on the details of the project immediately and found that the project required having the product files in the Building-Data/TSI database.
“I immediately brought in Mike Rivers and Chris Bertsch of Uponor and literally within two weeks, Uponor had their product into the Building-Data/TSI database,” he says.
When the product landed at the contractor’s shop, Corrigan was there to help show the contractors how to make 2" ProPEX connections to pre-fab the risers.
Bob Wolf, project manager on the Radisson Blu Mall of America project with Metropolitan Mechanical Contractors (MMC) of Eden Prairie, Minn., was on the project from the beginning and found the plumbing installation with Uponor’s PEX to be very efficient with labor savings.
“I started installing PEX in small retail applications several years ago and I really like how the flexible tubing makes it faster to install because we don’t need as many fittings,” he says. “The Radisson Blu Mall of America project has been my first experience using large-dimension PEX in riser applications and I really like the additional labor savings it provides.”
According to Wolf, the time savings using PEX for the risers and the unit piping saved his crews about two to three days per floor. On a 13-story project with 50 units per floor, that adds up to almost a month of installation time savings!
“We started out with a three-man crew which took three days to complete each floor,” he says. “Installing copper would have been double that time.”
MMC prefabbed the risers and installed them during the cast iron installation. Then, the crew went in each floor and hooked up the unit piping for all 50 units on each of the 11 occupied floors (3rd-13th floors).
“When you’re talking about 50 units on one floor, you can whip through it pretty fast with PEX and the multi-port tees,” says Chris Dent, assistant project manager with MMC. “The multi-port tees also help save time by reducing the number of fittings required.”
Angie Shingledecker, a journeyman plumber with MMC, says she prefers the ProPEX expansion system for fittings compared to others she has used in the past. “I’ve been installing PEX for about eight years and I don’t like crimp fittings,” she says. “I like the ProPEX expansion fittings much better.”
The Radisson Blu Mall of America project has been my first experience using large-dimension PEX in riser applications and I really like the additional labor savings it provides.
Informationen zum Projekt
Informationen zum Projekt
Ähnliche Projekte
Umweltfreundliche Behaglichkeit
Heizung und Kühlung fahren jetzt auf Ideallinie
Heizung und Kühlung fahren jetzt auf Ideallinie
aquaTurm Radolfzell
Der ehemalige Radolfzeller Wasserturm wurde zum Nullenergie-Designhotel aquaTurm umgebaut - mit den Uponor Lösungen Klett und Smatrix Base zum Heizen und Kühlen.
Panorama 2962 Zugspitze
Zugspitz Resort, Ehrwald
Zugspitz Resort, Ehrenwald
Cavalier Hotel
Hotel Bellevue
Uponor has delivered a solution for underfloor heating and cooling to Superior City Hotel Bellevue ****. The hotel provides spacious and modern rooms and suites which meet all of the guests needs. One of them is a comfortable room temperature throughout the year.
Al-Kalaa Hotel
Villa Ersilia Hotel & Wellness Center
Hotel Mediterraneo - Sauna
Grand Poet Hotel by Samarah
Lielupe Hotel by Semarah, Jurmala
Park Inn by Radisson Riga Valdemara
SPA Vilnius Anykščiai wellness and relaxation center
The Anykščiai wellness and relaxation center is a modern SPA situated on 4 ha of land near the Forest of Anykščiai known for its beauty and unspoiled nature.
Wilshire Grand
Aqua Dome - A Combination of Nature and Thermal Springs
Hospice Sport & Spa
H-Tower in Kiev
Villages Nature (R) Paris
Villages Nature (R) Paris is a new european vacation destination and a major innovation in family-friendly sustainable tourisme, designed entirely around the quest for harmony between Man and Nature.
Hospital Østfold Kalnes
Uponor is proud to deliver flexible tapwatersystem, underfloor heating and snow and ice melting system to the new hospital Kalnes.
Frank Myhrer, Sales Manager Østfold
Read more about the project on this site Byggeindustrien.no
Leonardo Hotel, Bristol, UK
The Jurys Inn Group has utilised a variety of high-end heating and plumbing solutions from Uponor, the total solutions provider of systems for the safe transportation of water around a building, for a new 200-bed, Leonardo Hotels branded facility in the heart of Bristol
Located in Temple Way at the gateway to Bristol’s Temple Quarter business district, close to the main train station and within walking distance of the city centre, the new hotel will become a popular destination for tourists and business travellers alike when it opens in early 2021.
To ensure that the hotel’s users would be provided with a hygienic water supply and a highly reliable heating system, the project’s M&E contractor Totus Engineering worked closely with Uponor on the building’s plumbing and water network.