Gazoil Plaza, Moscow, Russian Federation
Gazoil Plaza
Project facts
Uponor Involvement
The business centre's favourable location provides for an easy access to transportation. The Gazoil Plaza building can be freely reached through several traffic arteries, i.e. Leninskij prospekt, Profsoyuznaya ulitsa, Varshavskoe shosse and Sevastopolskij prospekt. Two underground stations, i.e. Kaluzhskaya and Novye Cheryomushki, are next to it.
All architectural and technical characteristics of Gazoil Plaza comply with the international standards required for A+ class business complex. The Gazoil Plaza's facade has a high-tech style where ceramic granite and tinted glass were used.
The offices of Gazoil Plaza take up the range from the third to the twenty second storeys, and the 23rd and 24th floors are occupied by an exclusive penthouse. The offices area varies from 250 to 21,000 square metres, and they are offered Shell&Core and the tenants may decorate them.
The decoration of one of the buildings had been finished by 2007, all fit-out works are planned to have been finished by the end of 2012. Gazoil Plaza has a developed infrastructure, i.e. a café, restaurant, bar and branch of a bank. The business centre is equipped with the three-level underground garage to place 135 cars.
Heating and potable water systems by Uponor
Having made a commercial offer to Tashir Uponor managed to outperform its competitors by quality-to-price ratio for its products. It took two years to install Uponor systems (2010-2011). The eval PE-Xa heating systems and plumbing systems made of cross-linked polyethylene PE-Xa with diameters of 20 and 25 mm were installed in one of the buildings, all 24 storeys through.
Swiss Realty Group bears responsibility for the project implementation.
Project information
Project information
Partners
specifier
Akropol Development Company
contractor
Tashir Construction company
developer
Gazoil Trade managing company
Similar projects
Alibaba headquarters
Uponor Shanghai office, China
Concrete core activation ČSOB Prague
Concrete core activation České Budějovice Research Library
S Group’s logistics centre for utility items
The installation of Uponor storm water cassettes in Shopping Center Karisma, Lahti
Remotely controlled security and convenience in temporary school building
Stable heating and draftless cooling from the ceiling
Varicool heating and cooling panels were installed to the meeting room's ceiling. The new hydronic system replaced the old fan coil unit system. Varicool system is a radiant heating and cooling system. The panels do not heat or cool the indoor air directly but the surfaces what radiant covers.
Kiviniityn Auto- ja Maatalouskonehuolto acquired a new underfloor heating and cooling solution
HAMK's zero-energy hall uses energy piles
Technopolis Innova 2 in Jyväskylä, Finland is heated by energy piles
The Kastelli community utilises smart building services
Uponor's head office is a model example of energy efficiency
Day-care centre to be built with energy piles
Institut les Mines Telecoms Saclay
Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.
Klimahaus Bremerhaven 8°
Auron
Berliner Bogen
Energy Efficiency Center
Ericusspitze Spiegelhaus
Kranhaeuser
Brain Box Berlin
Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.
Leitradlofts, Cologne
A hygienically optimal drinking water installation was integrated into the new office complex – thanks to Uni Pipe PLUS within a very short time.
Villeroy & Boch
First Uponor Comfort Panel project in Hungary
Standard Bank
First radiant ceiling cooling renovation project in tropical climate – Singapore
First radiant ceiling cooling renovation project in tropical climate – Singapore
Palazzo Ferrazzi - Brescia
Posco Green building
LH Headquarter in Jinju
Passive building with high energy efficiency
National Library of Latvia
Immeuble Delta Green
La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.
Swedbank Head Office
Tap water system in new Swedbank head office.
Lithuanian National Art Gallery
"Sostena" Business Centre
Nathan, Zevenaar
Agder fengsel in Norway
Uponor in Sluppenveien 17
The New Deichmanske Library - Bjørvika, Oslo
Gorod Stolits (Capital City)
Samaraneftegaz - Rosneft Office Building
Skylight Business Centre
Tushino Business Center
Concrete Core Heating and Cooling Systems, Piešťany
Car dealership in El Escorial, Madrid
Ecobox Building
Zero emissions, maximum comfort
Uponor Iberia headquarters and logistics hub - Móstoles, Madrid
BESEL Head offices in Madrid
Länsförsäkringar Office building complex
BAE Systems Rochester
Sunesis school scheme: Sacred Heart Primary School, West Midlands
Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.