Fill the BIM cart from the product catalogue

References

77 Results found
Office building

Progenergia Thermotechnical Engineering Office

As part of the extension work on the premises in Caronno Pertusella (Varese), Studio Termotecnico Progenergia opted for the Uponor Tecto radiant heating system to heat and cool the events hall.

Office building

Austro Tower

Sustainable heating and cooling with Uponor TABS
 
Office building

The Leon-Service Plus Office

Uponor systems were selected to provide water supply, heating, and cooling for the office, making it possible to eliminate radiator heating in the building.

Office building

Ericusspitze Spiegelhaus

New company HQ of the Spiegel Group is located at the Ericusspitze. The concrete core activation from Uponor ensures pleasant temperature levels in the building.

Office building

Edificio de oficias en calle Tutor

The building located at Calle Tutor 16 (Madrid), owned by Arquia Inmuebles, has undergone a complete renovation and modernization, being partially demolished with the façade stabilized. A project designed by Tuñón y Albornoz Arquitectos and executed by SANJOSE Constructora, where the integration of Uponor's Invisible Air Conditioning in the Matrics raised technical floor developed by company Subway Systems.

Office building

Uponor System Protects First Responders

Customer Challenge
Deliver an efficient, sustainable snow and ice melting solution that keeps pace with a demanding construction schedule.
 
Office building

Immeuble Delta Green

La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.

Office building

Nathan, Zevenaar

The technical heart of Nathan Zevenaar

Office building

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.

Top
Uponor Reference magazine

Uponor Reference magazine

European innovative references with built-in Uponor solutions

PDF 6 MB