Secure tunnel trunk lines, Helsinki, Finland
Secure tunnel trunk lines
The fifth and final pipeline contract for the three-kilometer Kamppi-Erottaja-Kruununhaka tunnel, which is being contracted by Destia, is now under construction. In the autumn, the Plumbing work on the six-kilometer-long Meilahti-Pasila-Käpylä tunnel will begin. Destia's contract also includes plumbing in the downtown service tunnel and the Viikinmäki tunnel.
Project facts
Uponor Involvement
Assurance for users
By connecting all our plants to the same network, we can increase the security of district heating and district cooling distribution and optimize the operation of different production plants. The work has more precise quality and safety requirements than usual, mainly due to the important large trunk lines running in the tunnels, Nevalainen says.The elements are installed in the tunnel on brackets at 18 meter intervals. This brings its own additional requirements to the work and its design. The thermal movements of free-moving elements are different from those of friction-fixed elements in the trench. For this reason, network stress tests are performed at the site. - It is important that the stresses do not exceed the permissible design values of the materials. The design pressure used in the tunnel is 25 bar, while the reading on the ground is 16 bar. An ST 52.0 flow pipe is installed in the tunnel, which is about 50 percent stronger than the pipe material of the surface network.
An electrical sleeve was required for the insulation work
As such, there is not much difference between installing in a trench or a tunnel. However, due to the importance of the network, among other things, welds and branches are inspected even more carefully in tunnels than in the surface network.
The work has certain quality requirements. For example, the insulation work of the element joints has the required electrical sleeve. The contractor has been able to choose how he does the work, Nevalainen states. Destia's contract includes the transport of district heating and cooling pipes from the warehouse to the tunnel, as well as their installation and insulation. The transport of 16-meter pipes in the center of Helsinki and into the tunnel has brought challenges to the work.
- We chose a TSC welding sleeve for insulation work. The split sleeve can be installed in a finished line. We rented the equipment from a supplier and received guidance on its use, says Erkki Virtanen, Destia's work manager.
The TSC method is suitable for special conditions
-The system is well suited for tunnel joints. It is a good solution, especially in special conditions, for example when the pipe is exposed to seawater, Virtanen thanks. The sequel has traditionally been the weakest point of the district heating line. When using a TSC welding sleeve, the joint of the steel flow pipe is protected by a similar insulation and surface material as the pipe element itself.The split polyethylene sleeve is as well suited for a trench as a pipe bridge. The sleeve weighs 2 to 13 pounds and requires approximately the same amount of space for welding as for welding a flow pipe by hand. The size of the welding machine is only 35 x 35 x 20 centimeters.
- The installation of the sleeve therefore does not require large machines on the construction site, sums up project manager Jan-Erik Svarvén. Once the flow pipes have been welded and the leak detection wire connections have been made, the TSC sleeve is tightened in place at the pipe joints. A stainless steel mesh is placed between the sleeve and the shell. Power is supplied from the tool to the steel mesh. When the required connection temperature is reached, the welding is OK. The longitudinal seam is finally passed through a hand extruder. The joint is usually 300 to 340 mils, the welding head 150 to 170 mils and the sleeve 500 mils long.
- After installation, the joint is test-tensioned from the drilled hole and foamed with the same insulation as the element itself. Finally, the borehole is welded with a 25 mm polyethylene rod. The end result is a line where the insulation and surface material are uniform. One of the advantages of the method is that it also allows angular deviations, Svarvén states.
Six different sizes of TSC couplings have been delivered to the connections of the service tunnels of Helsingin Energia's Johanneksenpuisto, Viikinmäki and the city center.
Project information
Project information
Similar projects
Pump structure secures stormwater system’s long life
Drinking water passing through contaminated area in Thisted
Intake pipeline for seawater in Copenhagen Harbour
Butt welding by night of 900 mm pipes ensures stable operation of a district cooling solution in Copenhagen Harbour.
TV-Tower, Estonia
PE pressure sewer system from Harjavalta to the city of Pori
New Uponor IQ –Storm water system - Sustainability and Quality in Road Infrastructure
Ultra Double replace concrete pipe line in Raahe
ProFuse pressure pipe line provides drinking water to cottage owners in islands near by Uusikaupunki
Environmental friendly heating and storm water systems in new Launonen day-care centre
New water pipeline
Now that’s truly FAST
Life is grand for graylings in the pure waters of Ounasjoki River
Europe’s largest ever plastic culvert goes to Norway
Don’t count on luck to protect you from flooding
Clean drinking water for 17,000 scouts
Iisalmen Vesi renovated a trunk line by relining
To rebuild an office building located in the heart of Amsterdam into 150 appartments in a relatively short time is definitely a big challenge.
Weholite limits overflows and pollution in London
Handling storm water in a smart way
Urban runoff under control – quickly and easily
Relining to the rescue in Kajaani
Fighting against an ecological disaster in a world-record time
Rapid action was critical when a sewage collector broke in Warsaw, Poland, causing a massive waste spill into the Vistula River. Uponor Infra’s crew worked 24 hours a day in order to stop the pollution of the river. A temporary pipeline was produced, delivered and connected in just eight days.
Sewage pipelines to sewage treatment plant - HDD method
Collectors for sewage treatment plant
Renovation of reinforced concrete sewer - relining method
Sewage retention chanel
Renovation of cast iron water supply pipeline - swagelining
Thanks to swagelining technology, it was possible to carry out most of the water line modernisation works in the centre of the city of Łódź, in a built-up area, along traffic lanes with heavy traffic of motor vehicles and trams.
Sea outlet - discharge of stream water into the Gdańsk Bay part 2
Renovation of damaged stoneware collector – cracking/short relining
Sewage separation system
Construction of storm water collectors in Nowe Polkowice is one of the stages of a big investment concerning the drainage of the district.
Sea outlet of treated wastewater
A sea outlet of treated wastewater was initiated in Swarzewo. It is yet another of the many environmentally friendly projects that have recently been carried out in Poland where PE pipes were used.
Uponor pressure pipe system Profuse in Borås town
Uponor Infra culverts in major investment at Skåne University Hospital in Malmö
A test installation of an infra culvert with great potential
Strong, Safe and Flexible
Innovative, reliable - and installed in 11 days
Uponor soil drainage system Ultra Rib 2 in Kungälv
Infratunnel protects pipes and cables in new residential area
Focus on sustainability
Weholite installed in Valdemarsvik Sweden
Uponor Vault cleans the storm water
Hybrid solutions for storm water management
City of Lahti is building new neighborhood called Ranta-Kartano. While they were constructing basic infrastucture the city saw the possibilty to reserve some ground space for storm water management. Now there is a test running for different kind of storm water management. Uponor is involved with new type of storm water filter.
An easy and reliable storm water solution
Flow measurement reveals leaks in the water supply network
Fire wastewater safely recovered
Water treatment plant
A smart retention system for an anti-flooding solution
September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.