Hotel Lone, Rovinj
Hotel Lone je spektakularan, jedinstveno dizajniran hotel smje拧ten uz more i Park 拧umu Zlatni rt. 沤ivahno sredi拧te Rovinja i marina udaljeni su samo 15-ak minuta hoda. Hotel Lone je cjelogodi拧nja destinacija za slobodno vrijeme i posao te predstavlja srce Maistrine konferencijske ponude. Zajedno s ostalim luksuznim hotelima koji ga okru啪uju, idealan je doma膰in velikih doga膽anja s vi拧e od 3000 sudionika ili sastanaka.
KULMER's castle
A replica of Kulmer’s castle was constructed based on a project designed by a renowned Zagreb architect Branko Kincl.
Vuglec Breg - Vinarija, pansion & restoran
Twin Cities home
Learn why a Twin Cities homebuilder chooses Uponor plumbing, fire safety and radiant floor heating systems for his own home...
Panorama 2962 Zugspitze
At nearly 3,000 meters above sea level, Uponor ensures cosy temperatures and clean drinking water in Germany's highest mountaintop restaurant.
A gray water filter provides operational reliability and ecology for Lake Ruuhij盲rvi聽
At the end of autumn 2013, Uponor's new product, Uponor Gray Water Filter Home, was installed in Ruuhij盲rvi, Nastola.
Ultra Double replace concrete pipe line in Raahe
The old concrete pipe line in Raahe came to its end. The replacing pipe line was made of Uponor's newest sewer system, Ultra Double.
Retention tanks in mountain areas
Construction of the S1 expressway on the Przyb臋dza-Mil贸wka section, known as the bypass of W臋gierska G贸rka. Uponor Infra polyethylene tanks were selected for drainage of the road system.
Construction of an alternative sewage transmission system
A backup sewage collector has been built in Warsaw to service 7 of the city’s 18 boroughs.
Pu拧懦 Terasos (Pine Terraces)
Pu拧懦 Terasos (Pine terraces) is a multi-family residential building complex near the Baltic Sea in Klaip臈da, Lithuania
Applewood Pointe
Developed by Uponor, this new solution takes the guesswork and freelancing out of piping installations. Each kit, which includes all the needed ProPEX® fittings, adapters, valves, and rings, is delivered to the job site — one kit per room or apartment — along with a material list and an isometric layout for the installer to follow, helping to minimize mistakes and maximize efficiency.