Llenar la cesta de la compra BIM desde el cat谩logo de productosLlenar la cesta de la compra BIM desde el cat谩logo de productos

574 Resultados encontrados
Uponor pressure pipe system Profuse in Bor氓s town
Edificio p煤blico

Uponor pressure pipe system Profuse in Bor氓s town

Better water flow in Fruf盲llan

Fish farming with the smallest possible footprint
Edificio industrial

Fish farming with the smallest possible footprint

Andfjord Salmon AS, a Norwegian fish farming company, has the ambition to create a sustainable, environmentally and fish-friendly onshore facility – with the smallest possible footprint. This patented facility combines the best from both traditional ocean net-pens and land-based salmon farming. The intake and outfall lines are built with highly durable Weholite PE pipes and panels with a 100-year life span.

Renovation of the sewage collector
Edificio p煤blico

Renovation of the sewage collector

In 2021, a renovation of a corroded sewage collector was carried out in Swarzewo using a tight-fitting method.

Renovation of the railway culvert
Plataformas log铆sticas

Renovation of the railway culvert

Uponor Infra Sp. z o.o. supplied Weholite PEHD DN3000 SN8 with pipes for the renovation of a railway culvert.

Retention tanks for the railway station
Plataformas log铆sticas

Retention tanks for the railway station

The modernisation of the Warsaw West railway station is the largest construction project currently underway in the Polish capital.

Renovation of a water supply system in an area with mining damage
Edificio p煤blico

Renovation of a water supply system in an area with mining damage

In 2020, the water main between the reservoirs and the Paprocany pumping station in Tychy was upgraded with PE-HD pressure pipes by Uponor Infra.

Battery of retention tanks
Edificio p煤blico

Battery of retention tanks

In Mielec, modern storm water and snowmelt retention systems have been built, which will solve the problems with periodical flooding of streets and buildings in the city centre.

Emergency pipeline on a pontoon bridge
Edificio p煤blico

Emergency pipeline on a pontoon bridge

In 2020, Uponor did an outstanding job of installing an emergency pipeline on a pontoon bridge after an underground GRP sewage collector failed in Warsaw, the capital of Poland. 

Storm water of the railway station
Plataformas log铆sticas

Storm water of the railway station

The specificity of constructing a storm water system as part of railway projects is that it must be resistant to, among other things, dynamic loads from the passing trains. In the case of the station in Konin, an important element of the storm water system is the retention tanks

Quick installation in the Konotopa channel
Edificio p煤blico

Quick installation in the Konotopa channel

The renovation of the Konotopa channel is one of the most interesting hydro projects recently completed in Warsaw, Poland. 

Drainage system for heat and power station
Edificio industrial

Drainage system for heat and power station

Slotted drainage VipLiner module made by Uponor Infra has been chosen to build a drainage system for heat and power station of Gdynia.

Lightening structure of the General Road viaducts
Plataformas log铆sticas

Lightening structure of the General Road viaducts

Use of polyethylene pipes in the construction of viaducts of the Generals’ Route not only helped to lighten their structures but also lowered project cost.