Uponor North America
5925 148th Street West
Apple Valley, MN 55124
Caso de estudio

Production hall Eurom, Brno, Brno, Czech Republic

Production hall Eurom, Brno

Datos del proyecto

Brno, Czech Republic
Industrial buildings
Climatización Invisible
Completion: 2010

Participación de Uponor

2800

An industrial underfloor heating system in fact

Headquarters of the company Eurom located in Brno Slatina includes administrative, storage and production facilities. It is a standalone building hall type, which is divided into two parts. The first part consists of administration and facilities. The second part consists of single-storey building with two-aisle production hall (the building footprint 78 x 36 m). Throw the center of each vessel leads communication area, around which individual manufacturing cells are concentrated. Both vessels are heated by an industrial underfloor heating system.
Underfloor heating: Uponor PE-Xa pipes 25 x 2.3 mm in clamp track
Floor Construction: Double Layer, steel fibre concrete.

Production hall Eurom, Brno

0002764

Información del proyecto

Información del proyecto

Address
Slatina
Country
Czech Republic
Completion
2010
Project Type
New building
Building Type
Industrial buildings

Similar projects

Manitoba Hydro Place

Manitoba Hydro Place

Descubra cómo las tuberías hePEX de Uponor se usan para calefaccionar un edificio de 18 pisos en un lugar donde las temperaturas pueden descender por debajo de los 0 °F...
Northstar Railway

Northstar Railway

Descubra de qué manera el andén del tren de cercanías Northstar se hizo más seguro con el sistema de derretir nieve de Uponor. Para combatir el hielo del invierno es necesario...
Edificio anexo de Uponor

Edificio anexo de Uponor

Descubra cómo nuestro compromiso con la fabricación optimizada, la eficiencia energética y un entorno laboral superior se ve reflejado en nuestra nueva...
Plastic pipe withstands mill’s process water

Plastic pipe withstands mill’s process water

Stora Enso’s Imatra mill, located in southeast Finland, annually produces one million tonnes of packaging paper and board. The Imatra mill’s two production units produce raw materials for cartons, in which juice and milk are packaged. Board is also used to produce paper cups, as well as cigarette and candy packages. Board for the graphics industry is used to produce cards, covers and luxury packages.
Leica Camera AG Headquarters

Leica Camera AG Headquarters

The company headquarters of Leica Camera AG features a unique architectural design – controls temperatures with solutions from Uponor and Zent-Frenger.

 
Bangkok Airport

Bangkok Airport

An Uponor panel cooling system will cool Bangkok's new international airport in combination with a displacement ventilation system.
Chatterley Valley

Chatterley Valley

The world's first BREEAM outstanding rated logistics building has been equipped with industrial floor heating from Velta UK.
Regional Perinatal Center

Regional Perinatal Center

National Project "New Life - New Quality of Maternity and Childhood " implements the State Agency for Investment and National Projects . The project is implemented on the initiative of the President of Ukraine Viktor Yanukovych and implemented by the Ministry of Health of Ukraine , National Academy of Sciences of Ukraine , local government and the All-Ukrainian Charitable Organization " Victor Pinchuk Foundation - a social initiative ." He planned to create a national network of perinatal centers of medical institutions III level . Advanced equipment , high level of medical training doctors Obstetricians and neonatologists can significantly reduce maternal , infant mortality and disability.
eMAG Warehouse

eMAG Warehouse

The largest online retailer in Romania has built two logistics warehouses totaling 250,000 m² in Joita commune, Giurgiu county. Each of them came with its own architecture, specific needs and constant activity in the interior space.