Uponor North America
5925 148th Street West
Apple Valley, MN 55124
Caso de estudio

Shanghai sheshan yard developed by Lujin company is a high-grade hardcover residential area with a total area of 42000 square meters, 540 apartments., Shanghai, China

Shanghai sheshan yard developed by Lujin company is a high-grade hardcover residential area with a total area of 42000 square meters, 540 apartments.

Shanghai sheshan yard developed by Lujin company is a high-grade hardcover residential area, which is located in Shanghai,songjiang district, with a total area of 42000 square meters, 540 apartments.

With the high-end positioning of the project, the property developers appointed Uponor as their radiant heating system supplier. In order to meet their requirements of high comfort, convenient maintenance, energy saving and environmental protection, Uponor chose 16*2.0 PE-RT and brass manifold.

Uponor PE-RT made from pure imported raw material with Claus Maffei extrusion equipment. The whole process is also equipped with INNOX ultrasonic size monitoring system, entirely control quality. Compared to ordinary PE-RT, Uponor PER-T has better thermal stability, long-term pressure resistance and chemical resistance, so it’s not easy for Uponor PE-RT to rust or fouling. It fully meet the GB/T28799 standard. Uponor PE-RT is flexible and easy to coil. Its thermal conductivity is 0.4W/m.k, which is the fastest heat transfer plastic pipe in ground radiant heating system.

Uponor UBC brass manifold is modular designed, the two segment uses internal and external thread connections to make the connection stronger. Each loop is equipped with a balance valve and the valve can be preset with an inner six angle spanner. Each type of the house can be matched with different number of interface and loop in order to minimize the energy consumption and save the later maintenance cost for the owner.

Compared with traditional heating system, Uponor system can save 12% energy and operating cost. Uponor PE-RT also have 50 years of service life and provide a reliable international quality guarantee for the project.

During the whole construction process, Uponor engineers and sales communicate with designers and installers actively, which avoid many mistakes of installation. Also they contact taicang factory actively to ensure the project go smoothly ,safety and comfort. Finally, Uponor won compliment from all concerned team.

Datos del proyecto

Shanghai, China
Multifamily homes
Climatización Invisible, Sistema PEX-a
Completion: 2018

Participación de Uponor

42,000sqm

Shanghai sheshan yard developed by Lujin company is a high-grade hardcover residential area with a total area of 42000 square meters, 540 apartments.

sheshan case 001

Información del proyecto

Información del proyecto

Country
China
Completion
2018
Project Type
New building
Building Type
Multifamily homes
Product lines
Classic

Similar projects

Avalon Bay

Avalon Bay

Seis nuevos edificios de apartamentos, originalmente diseñados para CPVC, se convierten en proyectos con tuberías PEX e incluyen un sistema de plomería con diseño Uponor Logic...
Tellico Village

Tellico Village

Un problema recurrente de las tuberías de cobre eran las fugas de orificios pequeños que necesitaban reparación de plomería y reemplazo de tuberías. Descubra por qué...
SkyHouse

SkyHouse

Viva una excelente experiencia del cliente durante este proyecto con asistencia práctica cuando el complejo de apartamentos de Austin, Texas, reemplazó...
Episcopal Homes

Episcopal Homes

Las tuberías PEX de Uponor permitieron ahorrar tiempo y mano de obra en este proyecto de múltiples viviendas para personas mayores del Medio Oeste en Burnsville, Minnesota...
Summerland Apartments

Summerland Apartments

Un complejo multifamiliar de 16 pisos reemplaza las tuberías del sistema de tuberías galvanizadas con fallas por un sistema de plomería con tuberías AquaPEX® de Uponor...
Aurora Micro Apartments

Aurora Micro Apartments

Descubra por qué los contratistas decidieron instalar un sistema de plomería con tuberías AquaPEX® de Uponor para estos apartamentos en función de la confiabilidad del producto y la facilidad de instalación...
Fairway Village

Fairway Village

Conozca cómo el desafío de reemplazar el sistema subterráneo de plomería, calefacción y refrigeración de 45 años de antigüedad en un...
Quail Hollow

Quail Hollow

Descubra cómo un condominio reemplaza su sistema de energía del distrito de tuberías de acero con fugas por el sistema de tuberías Ecoflex de Uponor...
Loring Park Tower

Loring Park Tower

Vea cómo este contratista mecánico de Minneapolis advirtió una disminución significativa de la mano de obra en el lugar de trabajo durante Uponor PEX...
De Chantal Apartments

De Chantal Apartments

Descubra cómo las antiguas tuberías de cobre con fugas de un complejo de apartamentos para personas mayores se reemplazaron por completo por un sistema de plomería de Uponor...
Applewood Pointe

Applewood Pointe

Esta nueva solución, desarrollada por Uponor, elimina las imprecisiones y el trabajo por su cuenta en las instalaciones de tuberías. Cada kit, que incluye todos los accesorios, adaptadores, válvulas y anillos ProPEX® que se necesitan, se entrega en la obra, un kit por habitación o apartamento, junto con una lista de materiales y un diseño isométrico a fin de que el instalador pueda seguirlo, y así minimizar los errores y maximizar la eficiencia.
Uponor participates in construction of Maarjamõisa Medical Campus

Uponor participates in construction of Maarjamõisa Medical Campus

2022 sees the completion of Maarjamõisa Medical Campus managed by Tartu University Hospital. The largest centre of its kind in Estonia, the Campus concentrates active medical care in one compact system. Uponor Estonia is participating as advisor, and as supplier of potable and heating water systems in the second construction phase currently under way.
The joint renovation project in Maunula – cost savings through co-operation

The joint renovation project in Maunula – cost savings through co-operation

In the Maunula district of Helsinki, an exquisite joint renovation project is under way. The project, begun in 2012, involves six housing companies. The modernisation of the building technology is being implemented with elements from the Uponor Cefo line, for renovation of water, sewer, and ventilation systems, coming to 1,350 elements in total.
Underfloor cooling adds value to new construction

Underfloor cooling adds value to new construction

Postitalo, the former post office building in downtown Tampere, got a new look in 2017 when it was renovated into new commercial premises and a block of flats was built on top. The heat distribution system of choice was Uponor's underfloor heating and cooling system, which was installed in all flats.
Stylish rock home was renovated with practical viewpoint

Stylish rock home was renovated with practical viewpoint

Sipe Santapukki's appartment in the small multi story building that was built in 1930's was renovated thoroughly. Practicality, intimacy and energy efficient were the starting point for the renovation. Uponor's underfloor heating system and Drain gully system was chosen for the renovation.
A housing company Petreliuksenrinne

A housing company Petreliuksenrinne

The Petreliuksenrinne housing company controls a group of residential buildings that were constructed in 1969. The company manages 124 flats, which were subject to an overhaul of their water supply and sewerage systems. The floor drains, bathrooms, electricity distribution and antenna systems were also overhauled.
New apartment building

New apartment building

Two blocks of rental flats were completed at Sokeritehtaantie 15 in Kirkonummi in summer 2015. The new sites were realised with Uponor's R2i elements.
Apartment building Varsta Oy

Apartment building Varsta Oy

Line renovations in blocks of flats can be conducted significantly faster and more easily. The Uponor R2I cassette makes for a problem-free renovation. Thanks to advanced prefabrication, the project period is shorter and the risks are lower. The As Oy Varsta company in Turku is the first R2I pilot site. The site will be completed to an expedited schedule.
Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

An 8-storey apartment is rising in a former bank district in Lahti. The target will contain 265 apartments and is designed by A1 Arkkitehdit Oy and will be built by Nuorisosäätiö. There are 256 rental apartments reserved for students on floors 2-7. Uponor R2I blocks will be installed in all of the student-apartments in connection with bathroom and kitchen elements. Aleksi 5 is the first new destination in which R2I blocks are being delivered and in which sound-absorbing Decibel drains are used.
LEO 250

LEO 250

"LEO 250" brings together sophisticated architecture and superb energy efficiency. Construction time was speed up due to the use of an Uponor systems.
Next stop: comfort

Next stop: comfort

For the conversion of the historic building, the planners relied on decentralized apartment stations from KaMo and floor heating and cooling from Uponor.
Grand Tower

Grand Tower

More than 400 heat interface units and over 300 km of underfloor heating and cooling pipes for Germany’s highest residential complex.
Sampo Ltd multistorey building renovation

Sampo Ltd multistorey building renovation

Sampo plc has chosen the Uponor technical wall as the solution for the renovation of the damp areas in several blocks of rental flats. The project is expected to run from March 2015 to February 2017. There are a total of 150 flats at the sites.
Ewha Campus Complex

Ewha Campus Complex

Ewha Womans University had planned the underground campus, which is a global trend for space creation, in order to solve the problem that the available space on the ground was insufficient despite the increase in the space demand in the campus, in accordance with the Ewha Womans University Development Plan in the 21st century.

Riverstone Residence

Riverstone Residence

Multi-storey building in Kipsala in the historic centre of Riga and UNESCO World Cultural and Natural Heritage Protection Zone.
Multi-family homes

Multi-family homes

Heat interface units provide a high level of warmth and comfort as well as optimum drinking water hygiene in three multi-family homes.
Norman House Residential Development, Derby

Norman House Residential Development, Derby

To help address the housing shortage in Derby, an office block (Norman House) has been converted into 134apartments. As part of the conversion, electric heating, mains cold water distribution systems and hot water cylinders were installed in each room.

Omniturm Frankfurt

Omniturm Frankfurt

Premium technology for premium apartments with nearly 150 heat interface units for an individual room climate.
 
George Street

George Street

Uponor products set the standard for off-site construction projects by providing a quick to install, cost-effective and high performance plumbing system for the safe delivery of domestic water services for the world’s tallest modular apartment building.
Sluseholmen

Sluseholmen

The Uponor project ’Sluseholmen’ has served as inspiration for developing a brand new and advantageous plumbing solution.
As a result, Uponor now offers a new, optimized and well structured, compact and easy to use prefab basic unit with flexible connectivity options for managing water and heating in varying types of housing.
From now on, Uponor provides the construction market with these prefab shaft units, primarily intended for modern floor building and terraced houses.
 
Brusaporto apartments

Brusaporto apartments

Two apartment buildings in Brusaporto, Italy, offer a high level of living comfort after renovation – also thanks to the Uponor Minitec underfloor heating system. With its low installation height, it is ideally suited for retrofitting.
Refurbishment of a prefabricated building

Refurbishment of a prefabricated building

During the renovation of a prefabricated building in Zwickau, Robinienweg, a low installation height stood in contrast to the desire for more energy efficiency and comfort through underfloor heating. The solution: a slimline combination of Minitec underfloor heating from Uponor and N 440 leveling screed from Knauf.
hi! Cañaveral

hi! Cañaveral

hi! Cañaveral es una promoción VPPB excepcional con Climatización Invisible por suelo radiante Uponor.

Residential project with underfloor heating adapted for apartments

Residential project with underfloor heating adapted for apartments

The Bävern block, located in the center of Karlstad, is a residential building that was completed in early 2023. Skanska, who built the homes, chose Uponor underfloor heating instead of radiators and also a variant that is completely new on the Swedish market and is adapted for multi-family buildings.
Infinity Forest Residence

Infinity Forest Residence

Accessible and surrounded by nature, the site is surrounded by fresh mountain air, generous sun, surrounded by rich forest and park vegetation.
 The key words are the basis of the philosophy for the construction of Infinity Forest Residence: practicality, efficiency, spaciousness, freedom and healthy living.