Uponor North America
5925 148th Street West
Apple Valley, MN 55124
Caso de estudio

Stades de Bienne, Biel/Bienne, Switzerland

Stades de Bienne

Datos del proyecto

Biel/Bienne, Switzerland
Sports facilities
Climatización Invisible
Completion: 2015

Participación de Uponor

8,987 m²

On one of the largest building sites in Switzerland, the country's first ever multifunctional sport arena has been constructed in Biel, bringing together ice hockey/ice skating, curling and football under one roof. The surrounding area is home to a wide range of shopping, entertainment and leisure options.

This trendsetting building provides local ice hockey and football clubs, EHC Biel and FC Biel, plus the Biel skating club and curlers with a highly modernised home equipped with brand-new facilities. In addition, it also serves as a large arena for sport, culture, events, conferences, trade fairs, catering, specialist markets and entertainment. For more information, visit www.stades-de-bienne.com.

Uponor AG Schweiz has supplied thermoactive building component systems (TABS) for this project. The TABS system provides concrete core thermal regulation with a capacity for storage, and is primarily used in commercial buildings. This modern and high-quality system uses the storage capacity of concrete slabs to provide effective heating and cooling. The system is highly regarded by users and only incurs minimal investment and operating costs, while providing optimal use of regenerative energy sources. The components in this system are largely maintenance-free and offer complete freedom for flexible room design. For more info, visit www.uponor.ch/tabs

Stades de Bienne

tissot arena (1)

Información del proyecto

Información del proyecto

Address
Tissot Arena
Country
Switzerland
Website
http://www.tissotarena.ch/
Completion
2015
Project Type
New building
Building Type
Sports facilities
Product lines
Contec

Partners

Partners

Planners:
tp, AG für technische Planungen
Zentralstrasse 115
Postfach 1229
2501 Biel, Switzerland
T +41 (0)32 321 59 00
F +41 (0)32 321 59 01
office@tpag-biel.ch

Installers:
ARGE Neuenschander Wagner Biel

Main contractor:
Implenia Martin Meyer (matrin.meyer@implenia.com)

Similar projects

Toyota Park

Toyota Park

Descubra de qué manera nuestra aplicación de acondicionamiento de césped usando tuberías hePEX™ de Wirsbo permitió que un frío estadio de fútbol del medio oeste...
Maksimir stadium, Zagreb

Maksimir stadium, Zagreb

After the renovation, the field at Maksimir stadium in Zagreb, Croatia is now equipped with Uponor Meltaway, a snow and ice melting system.
Boost to energy efficiency

Boost to energy efficiency

PowerPark's indoor karting hall became a functional and comfortable multipurpose hall when concrete replaced the asphalt floor and an energy-efficient and cost-effective Uponor Quattro floor heating system was installed underneath.
Icerink in "Városliget"

Icerink in "Városliget"

The history of the skating-rink The skating-rink of the Városliget, which was opened in 1926, was the second skating-rink (after Vienna) in Europe. In WWII it suffered a bomb hit, and in the 1950's it was only repaired temporarily. The latest large-scale renovation was carried out in 1986, when the modified power-house and condenser plant were installed, and the new, third layer of pipes was laid on the rink. After some small and large engineering modifications (1999 to 2001) – since the engineering system was outdated and spoiled – Municipality of Budapest called for a tender for comprehensive architectural and engineering reconstruction of the Skating-rink of Városliget.
Thermal Bath in Egerszalók

Thermal Bath in Egerszalók

The real sight of Egerszalók is the thermal well springing in the Southern part of the village, and the travertine hill created by the running water, which became known as the "salt-hill" over the years.
Refrigeration technology at the city icerink of Pápa

Refrigeration technology at the city icerink of Pápa

History of Pápa Pápa is a city of township rink, with a historic redolent cityscape, sights and cultural show-places. The city is located on the border of Bakony hills and the Kisalföld plains, and is the economic and cultural centre of the Bakony area.
Ice-rink in Pesterzsébet

Ice-rink in Pesterzsébet

The facility is located in district XX. of Budapest, at Zodony street 1., in the area near the Gubacsi bridge and the Helsinki road, in the vicinity of the Gubacsi residential block and the Mediterrán subdivision.
"Žalgirio" Arena

"Žalgirio" Arena

Žalgirio Arena has been given a BREEAM In-Use certificate – the first for an existing sports venue in the world.

Stavanger Concert Hall

Stavanger Concert Hall

The new concert hall is an outstanding building and a new benchmark. Uponor has been involved for the underfloor heating and plumbing system as well as snow melting system for outdoor areas.
Addenbrookes Hospital

Addenbrookes Hospital

Addenbrook hospital was one of the first provincial voluntary hospitals in UK and is currently undergoing a renovation program to replace all the service pipework.
Ashville Sports Centre, Harrogate

Ashville Sports Centre, Harrogate

As part of a £3million project, Ashville Sports Centre will be redeveloped by September 2017.
Once completed, the sports centre will boast a significantly enlarged gymnasium, a studio, 9 changing facilities, a reception/café area and new staff offi ces. The swimming
pool will also be redecorated and receive much needed maintenance.
CEF headquarters, Durham

CEF headquarters, Durham

When national electrical wholesaler company, City Electrical Factors (CEF), decided to invest in construction of a new 3,500m2 headquarters to provide a more contemporary, fit for purpose and environmentally efficient office environment, the resulting design from architect Faulkner Brown was a very conceptual, fair faced concrete building.
Dudley College, Dudley

Dudley College, Dudley

 The Advance II project is part of a transformation programme at Dudley College and the fifth new teaching facility to be constructed as part of the ‘Dudley Learning Quarter’ campus development.
LTA Performance Training Centre

LTA Performance Training Centre

Lawn Tennis Association Performance Training Centre covers 4000m², with Uponor PEX Underfloor Heating to keep the courts at the facility at an ambient temperature.
Manchester Metropolitan University, Manchester

Manchester Metropolitan University, Manchester

The innovative building, incorporates three individual towers and two atria and  boasts not only world-class teaching and learning facilities for students, staff and businesses, but also catering and leisure areas for all students, and conference venues which will draw companies and industry associations from across Europe and beyond.
Mooreland Care Home

Mooreland Care Home

Uponor Ltd provided the complete solution to Mooreland Care Home's heating and plumbing needs, offering complete flexibility and also a quality installation.
Sieben Welten

Sieben Welten

Experience Asia, Africa, Andalusia, Mexico, Arabia, India and Japan – Uponor supports the energy use concept of the ‘Sieben Welten Therme & Spa Resort’.