Technopolis Innova, an office building located in the centre of Jyväskylä, Finland, underwent an expansion in 2011 when a second building was constructed with a gross floor area of 10,000 square metres. The six-storey Technopolis Innova 2 building was constructed on the shore of Lake Jyväsjärvi in spring 2012.
Datos del proyecto
Participación de Uponor
Innova 2 is the first site in Finland to use energy piles, which exploit geothermal energy and were developed in collaboration between Uponor and Ruukki. The steel energy piles are driven or drilled into the ground and they provide the building with both a steady foundation and a large amount of useable energy.
Challenging ground conditions put to good use
Nowadays, it is increasingly common that buildings need to be constructed on ground that provides poor support, so piles are required in any event. This was the case for Innova 2, as the ground in Lutakko, in the centre of Jyväskylä, is relatively soft and the groundwater is at a depth of only 1.5m.
The steel piles that are used for the foundations act as both a supporting structure and an energy solution. The energy piles exploit free geothermal energy from beneath the building. They are particularly suited for use in commercial and office buildings such as Innova 2 where there is a significant need for heating and cooling.
The heating system uses the energy that is stored in the earth, while the low temperature of the ground is used for cooling. In the summer, the cooling system outputs excess heat, which is directed back into the ground, ensuring that the temperature level of the ground remains sufficient for energy generation.
Good results from the pilot site
Ruukki supplied the site with a total of 181 piles, of which 38 were energy piles. The piles were approximately 30 metres in length and they were sunk into Uponor's PE-Xa U collection circuits using ground weights. The collection circuits were then connected to manifolds that were installed into the floor.
The pile and the manifold are connected by an insulated pipe, which minimises heat loss. The trunk lines from the manifolds are led into the heat distribution room via insulated pipes.
"Considering that this was the first site on which energy piles from Ruukki and Uponor were installed, everything went very well. The installation sequence was optimised. It was possible to install the heat collection pipes on top of the base slabs in the final phase. This facilitated circulation on the construction site," says Jyrki Kesti, Technology Director from Ruukki.
A lifecycle-efficient solution
Using energy piles improves the energy efficiency of the building and reduces the carbon footprint. Environmental efficiency has also been proven to increase occupancy rates. Innova 2 was 100% let before it was finished.
The amount of energy that Technopolis Innova 2 can obtain from energy piles has fulfilled expectations. In some respects, it has surpassed expectations.
"We have obtained very good results on this site. The output of the energy piles has been better than forecast," Kesti says.The six-storey Technopolis Innova 2 building was constructed on the shore of the lake.
Información del proyecto
Información del proyecto
Partners
Similar projects
Alibaba headquarters
Uponor Shanghai office, China
Concrete core activation ČSOB Prague
Concrete core activation České Budějovice Research Library
S Group’s logistics centre for utility items
The installation of Uponor storm water cassettes in Shopping Center Karisma, Lahti
Remotely controlled security and convenience in temporary school building
Stable heating and draftless cooling from the ceiling
Varicool heating and cooling panels were installed to the meeting room's ceiling. The new hydronic system replaced the old fan coil unit system. Varicool system is a radiant heating and cooling system. The panels do not heat or cool the indoor air directly but the surfaces what radiant covers.
Kiviniityn Auto- ja Maatalouskonehuolto acquired a new underfloor heating and cooling solution
The Kastelli community utilises smart building services
Day-care centre to be built with energy piles
Klimahaus Bremerhaven 8°
Auron
Berliner Bogen
Energy Efficiency Center
Ericusspitze Spiegelhaus
Kranhaeuser
Brain Box Berlin
Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.
Leitradlofts, Cologne
A hygienically optimal drinking water installation was integrated into the new office complex – thanks to Uni Pipe PLUS within a very short time.
Uponor's head office is a model example of energy efficiency
Immeuble Delta Green
La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.
First Uponor Comfort Panel project in Hungary
Standard Bank
First radiant ceiling cooling renovation project in tropical climate
First radiant ceiling cooling renovation project in tropical climate – Singapore
Palazzo Ferrazzi - Brescia
Posco Green building
LH Headquarter in Jinju
Passive building with high energy efficiency
National Library of Latvia
Swedbank Head Office
Tap water system in new Swedbank head office.
Lithuanian National Art Gallery
"Sostena" Business Centre
Nathan, Zevenaar
Agder fengsel in Norway
Uponor in Sluppenveien 17
The New Deichmanske Library - Bjørvika, Oslo
Concrete Core Heating and Cooling Systems, Piešťany
Car dealership in El Escorial, Madrid
Ecobox Building
Zero emissions, maximum comfort
Uponor Iberia headquarters and logistics hub - Móstoles, Madrid
BESEL Head offices in Madrid
Länsförsäkringar Office building complex
The extension of Veljekset Keskinen is heated with Uponor's underfloor heating system
BAE Systems Rochester
Sunesis school scheme: Sacred Heart Primary School, West Midlands
Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.
Business center
Reconstruction of the office building of the Pharmaceutical Company "Darnitsa"
Demo smart house «IC Smart HOUSE live»
Shopping and office center
Rivergate
Berger Logistik
Vestas headquarters
HAMK's zero-energy hall uses energy piles
Institut les Mines Telecoms Saclay
Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.
Villeroy & Boch
Bahnhofpark, Sargans
Austro Tower
Poslovni centar Adris grupe
City Hall
Magnum Business center
MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.
MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.