Uponor in Sluppenveien 17, Trondheim, Norway
Uponor in Sluppenveien 17
This is the first TABS project that Uponor has delivered in Norway:
- 8 floors in total
- Area: 10,000 m2
- Basement level with car park
- Central atrium in the building covering 7 floors
- Kjeldsberg Eiendom
- Energy class A
Uponor in Sluppenveien 17
Uponor has delivered several plumbing systems for the project in Sluppenveien:
- 66,000 metres of Uponor pePEX piping for cooling
- Uponor floor heating system in changing rooms
- Uponor Uni-Pipe composite pipe for supply pipelines
- Uponor Tap Water Systems PEX Pipe in Pipe
Datos del proyecto
Participación de Uponor
TABS – Thermally Active Building Systems; Thermally active slabs
TABS – Thermally Active Building System is a principle for thermal activation of concrete slabs with embedded water loop pipes. The excess heat in the room rises upwards where it is stored in the slabs above. PePex pipes are embedded in the concrete slabs and circulating water draws the heat out from the thermal slabs and out of the building. The system is primarily a cooling system but can also be used to meet the heating needs in the building. The temperature in the room will vary throughout the day from a minimum value up to a maximum value. At night, the room temperature is usually lowered back to the selected minimum value. - and the cycle starts again. TABS is suitable for most building types.
TABS in brief
- Cooling using the slab structure
- The entire floor area is covered with pipes
- Can be used for ground heat during winter
- Waterborne system integrated in the slabs
- Used in industrial buildings, schools, theatres, hospitals, libraries and museums
- Energy supply at night only
- Zone portioning of the building
- Easy to adjust
- Optimal use together with heat pumps and ground source heat exchangers
- Saves energy Operating costs are reduced by 30-50%
- Large, clean roof surfaces
- Large spans
- Cooling capacity: 40-60 W/m2
- Heating capacity: 30 W/m2
Greater freedom for the architect
The solution provides optimal use and distribution of energy. The architect and building advisor gain new and exciting possibilities for the building design. Smooth roofs without ceilings is one such possibility. There is no energy supply to the building during the day. The circulation pump for the water is not in operation during daytime hours!
System description
The temperature starts at a selected level in the morning, e.g. 20°C, and we allow the temperature to rise up to max.
26°C, which is achieved at the end of the school day. (Other temperatures can be chosen), or at a predefined time. Alternatively, both factors can be combined.
The heat generated in the room during the day rises upwards and into the slab structure where the energy is stored. When the peak temperature in the room has been reached, the pump will start to circulate coolant through the pipes. The water will draw the heat from the slabs and out of the building. The room temperature will then decrease again and will, over time, return to the starting point of 20°C (or the temperature selected)
The temperature drop will take place at night when the building is empty.
Cooling or heating
A TABS system is first and foremost a cooling system but can also be used as a heating system. Manual changeover takes place when the season changes. A date for the system changeover is chosen. This is easy, reliable and affordable. The building is split into zones.
A thermally active slab can be implemented in several ways and is just as suitable in a slab cast on-site as in a
BubbleDeck. With a BubbleDeck, long spans (up to 16 metres) and large cantilevers can be achieved
A TABS system will be fully dimensioned before the building is erected!
1. Formwork is established.
2. Mark the position of the pipe distribution unit so that the pipelines between the modules and the distribution unit are adapted and visualised in the formwork and reinforcements.
3. The first phase of reinforcements are laid on the formwork.
4. Modules with pipes are prefabricated and pressurised (2.5 Bar) – and kept under constant pressure during the installation phase until they are connected to the distribution unit.
5. Modules with pipes are placed in the proper places and attached on top of the first phase of reinforcements.
6. Flow and return pipes are laid on the distribution unit
point and at least 1 metre above the top of the fully cast slabs. Distribution units are connected to the pipes
using Quick & Easy (Q&E).
The contractor K. Lund has been in close contact with
Uponor's technical division in Germany. It is important to ensure that all loops are of the same length, as the system does not require initial adjustment. This also means that any changes during the process need to be correctly designed.
Contacts Viggo Hagen is the Regional Manager for Central Norway and has worked at Uponor since 2001. He has worked closely with K. Lund on the Sluppen project, and in particular with Project Manager Gøran Søbye and Arild Sjøtrø as the Plumbing Foreman. Viggo Hagen, Uponor AS
Email: viggo.hagen@uponor.com
Mobile: +47 906 71 795
Erland Dilling is the High-rise Manager at Uponor. He is a graduate engineer and only works on major projects. Erland has played a very central part in the TABS project at Sluppenveien. Uponor's expertise in TABS is from Germany, and the engineering takes place in close collaboration with that department.
Erland Dilling, Uponor AS
Email: erland.dilling@uponor.com
Mobile: 474 67 071
Información del proyecto
Información del proyecto
Partners
Similar projects
Alibaba headquarters
Uponor Shanghai office, China
Concrete core activation ČSOB Prague
Concrete core activation České Budějovice Research Library
S Group’s logistics centre for utility items
The installation of Uponor storm water cassettes in Shopping Center Karisma, Lahti
Remotely controlled security and convenience in temporary school building
Stable heating and draftless cooling from the ceiling
Varicool heating and cooling panels were installed to the meeting room's ceiling. The new hydronic system replaced the old fan coil unit system. Varicool system is a radiant heating and cooling system. The panels do not heat or cool the indoor air directly but the surfaces what radiant covers.
Kiviniityn Auto- ja Maatalouskonehuolto acquired a new underfloor heating and cooling solution
Technopolis Innova 2 in Jyväskylä, Finland is heated by energy piles
The Kastelli community utilises smart building services
Day-care centre to be built with energy piles
Klimahaus Bremerhaven 8°
Auron
Berliner Bogen
Energy Efficiency Center
Ericusspitze Spiegelhaus
Kranhaeuser
Brain Box Berlin
Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.
Leitradlofts, Cologne
A hygienically optimal drinking water installation was integrated into the new office complex – thanks to Uni Pipe PLUS within a very short time.
Uponor's head office is a model example of energy efficiency
Immeuble Delta Green
La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.
First Uponor Comfort Panel project in Hungary
Standard Bank
First radiant ceiling cooling renovation project in tropical climate
First radiant ceiling cooling renovation project in tropical climate – Singapore
Palazzo Ferrazzi - Brescia
Posco Green building
LH Headquarter in Jinju
Passive building with high energy efficiency
National Library of Latvia
Swedbank Head Office
Tap water system in new Swedbank head office.
Lithuanian National Art Gallery
"Sostena" Business Centre
Nathan, Zevenaar
Agder fengsel in Norway
The New Deichmanske Library - Bjørvika, Oslo
Concrete Core Heating and Cooling Systems, Piešťany
Car dealership in El Escorial, Madrid
Ecobox Building
Zero emissions, maximum comfort
Uponor Iberia headquarters and logistics hub - Móstoles, Madrid
BESEL Head offices in Madrid
Länsförsäkringar Office building complex
The extension of Veljekset Keskinen is heated with Uponor's underfloor heating system
BAE Systems Rochester
Sunesis school scheme: Sacred Heart Primary School, West Midlands
Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.
Business center
Reconstruction of the office building of the Pharmaceutical Company "Darnitsa"
Demo smart house «IC Smart HOUSE live»
Shopping and office center
Rivergate
Berger Logistik
Vestas headquarters
HAMK's zero-energy hall uses energy piles
Institut les Mines Telecoms Saclay
Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.
Villeroy & Boch
Bahnhofpark, Sargans
Austro Tower
Poslovni centar Adris grupe
City Hall
Magnum Business center
MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.
MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.