Caso de estudio

Würth Logistics Centre, Lithuania, Ukmergė district municipality, Vilnius county, Lithuania

Würth Logistics Centre, Lithuania

 

 

Würth Logistics Centre: an exclusive build-to-suit project incorporating renewable energy sources

 

Datos del proyecto

Ukmergė district municipality, Vilnius county, Lithuania
Industrial buildings
Climatización Invisible, Ecoflex
Completion: 2014

Participación de Uponor

18 km PE-Xa d20 | 23 Q&E manifolds | 2,4 km Ecoflex Thermo Twin

The low-parameter, surface heating/cooling solutions deployed in this project are much more efficient than conventional heating systems. As a result, the desired temperature can be maintained in designated parts of the buildinginstead of overheating zones at the top, as is the case with convection heating. System integration with efficient geothermal sources ensures very low operating costs, and creates maximum comfort for people working in the building.

High demand and market potential for logistics buildings was recorded in Lithuania in the years 2011–2014. Therefore, a number of construction projects were implemented in that period, including build-to-rent logistics centres and build-to-suit buildings catering to highly specific client requirements.

The construction of the Würth Logistics Centre began in spring 2013 and combines two different zones: industrial warehousing and administration. The warehousing zone is an open 13-metre high space. The first floor of the centre’s administrative section contains a lobby, a shop, a café-canteen with a kitchen, a meeting room and technical premises. Administrative rooms and a meeting hall are located on the second floor.

The combination of different purposes in one building dictated the need for exclusive engineering solutions. Moreover, the client requested an energy-efficient solution.

The plot of land on which the logistics building is situated has 18 geothermal wells and Stiebel Eltron heating pumps with a total heating capacity of 138 kW. The pumps take heating from vertical geothermal probes.

The entire centre has Uponor radiant heating/cooling solutions installed. The administrative zone has a fitted PE-Xa d20 underfloor heating system with wired room controls (the parameterof the heat-transfer medium is 45 / 40 °C). The industrial and warehousing zone has an industrial underfloor heating system whose temperature is controlled via heat-transfer medium. The system maintains heating in the range of 25–35 °C.

The object has about 5,000 m2 of heated surface in total, with approx. 18 km of pipes and 23 Q&E modular collectors fitted under the floor. These collectors stand out from other similar products due toconnectors that are free of rubber sealants and sturdier than a pipe, and due to theheat-transfer medium which is fed via pre-insulated Uponor Thermo Twin pipe systems. 

In industrial buildings, large heating systems are usually mounted next to the ceiling. However, solutions such as these affect construction elements of the building and the reliability of connecting points. In order to avoid such issues, Uponor developed the Thermo Twin pipe systems. These systems are mounted in the ground: they are more reliable, fewer pipes are needed and they are faster to install and implement.

Due to selection of the right heating system, the logistics centre buildingcan also be cooled to 16-19 °C in summer.

The centre is built next to Vilnius-Panevėžys motorway. Its functional zones are clearly distinguished by bright colours on the outside of the building: the warehousing zone is grey and the administrative zone is red, with extensive use of tinted glass. This colouring mirrors that of the Würth logo.

 

Watch a video of the building process: https://www.youtube.com/watch?v=2PvsxIEmUmI

Würth Logistics Centre, Lithuania

wlc_1

Información del proyecto

Información del proyecto

Address
Jačionys village, Pivonija Neighbourhood, Ukmergė District Municipality,
Country
Lithuania
Website
http://www.wurth.lt/
Completion
2014
Project Type
New building
Building Type
Industrial buildings
Product lines
Ecoflex Thermo, Classic

Similar projects

Manitoba Hydro Place

Manitoba Hydro Place

Descubra cómo las tuberías hePEX de Uponor se usan para calefaccionar un edificio de 18 pisos en un lugar donde las temperaturas pueden descender por debajo de los 0 °F...
Northstar Railway

Northstar Railway

Descubra de qué manera el andén del tren de cercanías Northstar se hizo más seguro con el sistema de derretir nieve de Uponor. Para combatir el hielo del invierno es necesario...
Edificio anexo de Uponor

Edificio anexo de Uponor

Descubra cómo nuestro compromiso con la fabricación optimizada, la eficiencia energética y un entorno laboral superior se ve reflejado en nuestra nueva...
Plastic pipe withstands mill’s process water

Plastic pipe withstands mill’s process water

Stora Enso’s Imatra mill, located in southeast Finland, annually produces one million tonnes of packaging paper and board. The Imatra mill’s two production units produce raw materials for cartons, in which juice and milk are packaged. Board is also used to produce paper cups, as well as cigarette and candy packages. Board for the graphics industry is used to produce cards, covers and luxury packages.
Leica Camera AG Headquarters

Leica Camera AG Headquarters

The company headquarters of Leica Camera AG features a unique architectural design – controls temperatures with solutions from Uponor and Zent-Frenger.

 
Bangkok Airport

Bangkok Airport

An Uponor panel cooling system will cool Bangkok's new international airport in combination with a displacement ventilation system.
Chatterley Valley

Chatterley Valley

The world's first BREEAM outstanding rated logistics building has been equipped with industrial floor heating from Velta UK.
Regional Perinatal Center

Regional Perinatal Center

National Project "New Life - New Quality of Maternity and Childhood " implements the State Agency for Investment and National Projects . The project is implemented on the initiative of the President of Ukraine Viktor Yanukovych and implemented by the Ministry of Health of Ukraine , National Academy of Sciences of Ukraine , local government and the All-Ukrainian Charitable Organization " Victor Pinchuk Foundation - a social initiative ." He planned to create a national network of perinatal centers of medical institutions III level . Advanced equipment , high level of medical training doctors Obstetricians and neonatologists can significantly reduce maternal , infant mortality and disability.
eMAG Warehouse

eMAG Warehouse

The largest online retailer in Romania has built two logistics warehouses totaling 250,000 m² in Joita commune, Giurgiu county. Each of them came with its own architecture, specific needs and constant activity in the interior space.