Täytä BIM-ostoskori tuoteluettelosta

580 Löydetyt tulokset
Sewage pipelines to sewage treatment plant - HDD method
Verkostorakentaminen

Sewage pipelines to sewage treatment plant - HDD method

In 2007 in Szczecin, a series of record-breaking in the European scale number of crossings of a high dimension PEHD pipeline under a water obstacle made with a horizontal drilling method was completed in Szczecin.

Retention systems for the S3 expressway
Tie- ja liikennerakentaminen

Retention systems for the S3 expressway

As part of the project “Construction of the second roadway of the S3 expressway along the Sulechów – Nowa Sól section – the second and third section” Uponor Infra provided pipes, sewer manholes and detention tanks.  
 
A smart retention system for an anti-flooding solution
Verkostorakentaminen

A smart retention system for an anti-flooding solution

September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.

 

A raw water system for the new power unit
Teollisuus

A raw water system for the new power unit

To ensure failure-free operation of a raw water system, a polyethylene-made pipeline (PEHD) with a length of approximately 9 km was installed (in mining damage conditions), of which 3 km uses the trenchless technique – relining.

An optimal solution for a Polish power plant
Teollisuus

An optimal solution for a Polish power plant

WehoSlurry polyethylene pipes with an additional, internal slurry layer, provided an optimum solution for hydrotransporting ash to the Bełchatów Power Plant’s disposal site.

Unique design ensures controlled stormwater drainage
Verkostorakentaminen

Unique design ensures controlled stormwater drainage

In Slagelse Municipality, there are requirements for the drainage of rainwater and wastewater to be separated, and therefore it was important that the wastewater solution on the street, Nordre Ringgade, was also updated in accordance with current legislation. The client has received an approved solution where the wastewater from the commercial property in no. 59 has been separated from the rainwater. The rainwater is now diverted directly from the 2,500 m2 car park.

Johnson Residence
Pientalo

Johnson Residence

Justin Johnson and his wife, Jessica, had been planning their “forever home” for five years when they decided in late 2019 that they were finally ready to begin construction...

FishGLOBE revolutionises the future of plastic structures for marine conditions
Teollisuus

FishGLOBE revolutionises the future of plastic structures for marine conditions

As tall as an apartment building. A diameter of 22 metres. A volume of 3,500 cubic metres. FishGLOBE V5, a fish farming facility built and delivered to FishGLOBE AS in Stavanger in southwestern Norway, is the world’s largest PE plastic structure designed for marine conditions.

Flagship Homes project
Pientalo

Flagship Homes project

Uponor products help ensure landmark district heating scheme cuts carbon emissions and reduces energy bills for residents.

West Bay
Pientalo

West Bay

West Bay in Bridport is a primary example of modern living. It utilises the sustainable technology of underfloor heating and flexible installation plastic pipework.

Waters Edge
Pientalo

Waters Edge

The Watersedge development in Weymouth offers all the mod conveniences such as contemporary kitchens and granite work surfaces.

Thunderbird, Poole
Pientalo

Thunderbird, Poole

Uponor is proud to be the primary supplier of pipe work and underfloor heating to one of Britain´s most breathtaking buildings: the Thunderbird.