Al-Kalaa Hotel, Mecca, Saudi Arabia
Al-Kalaa Hotel
Faits sur le projet
Participation d’Uponor
In 2004 deliveries for 5,000 bathrooms were made. The overall project covers a total of 9,500 bathrooms, which will provide exquisite accomodation to the pilgrims. Uponor MLC pipe systems includes sanitary manifolds, pipes in dimensions from 16 mm up to 25 mm and the new press fittings with reliable test safety for easier installation for the plumbers. The bathrooms are pre-fabricated and transported to the construction site by truck.The current project consists of five towers, but plans to double its size are on their way.
Uponor multilayer composite pipe system has been selected due to its long lifetime according to DVGW (German association on gas and water) of 50 years. The operating company for the hotel complex has to give it back to the government after 15 years.
Therefore they invested once a higher quality but later on they do not need any maintenance or repair costs. So on the long run the operating costs are minimized. In the end everybody benefits. Especially the guests of the hotel can rely on permanent flow of hot and cold water. This is important as the pilgrims will pray 5 times a day according to the Islamic rules and thus need to wash their hands and feed before.
Renseignements sur le projet
Renseignements sur le projet
Similar projects
Radisson Blu
Cavalier Hotel
Zugspitz Resort, Ehrenwald
Hotel Bellevue
Uponor has delivered a solution for underfloor heating and cooling to Superior City Hotel Bellevue ****. The hotel provides spacious and modern rooms and suites which meet all of the guests needs. One of them is a comfortable room temperature throughout the year.
Heiligenhafen Pier 2
Bavaria Motel
Novum Hotel Bruy
Hotel modernisation resulting in energy efficiency and comfort
aquaTurm Radolfzell
The former water tower in Radolfzell was converted into the zero-energy design hotel aquaTurm, with the Klett and Smatrix Base solutions from Upanor being used for heating and cooling.
Panorama 2962 Zugspitze
Villa Ersilia Hotel & Wellness Center
Hotel Mediterraneo - Sauna
Grand Poet Hotel by Samarah
Lielupe Hotel by Semarah, Jurmala
Park Inn by Radisson Riga Valdemara
SPA Vilnius Anykščiai wellness and relaxation center
The Anykščiai wellness and relaxation center is a modern SPA situated on 4 ha of land near the Forest of Anykščiai known for its beauty and unspoiled nature.
H-Tower in Kiev
Aqua Dome - A Combination of Nature and Thermal Springs
Hospice Sport & Spa
Hotel Lone, Rovinj
Hotel Parentium
Vuglec Breg - Vinarija, pansion & restoran
Villages Nature (R) Paris
Villages Nature (R) Paris is a new european vacation destination and a major innovation in family-friendly sustainable tourisme, designed entirely around the quest for harmony between Man and Nature.
Zugspitz Resort, Ehrwald
Hospital Østfold Kalnes
Uponor is proud to deliver flexible tapwatersystem, underfloor heating and snow and ice melting system to the new hospital Kalnes.
Frank Myhrer, Sales Manager Østfold
Read more about the project on this site Byggeindustrien.no
Leonardo Hotel, Bristol, UK
The Jurys Inn Group has utilised a variety of high-end heating and plumbing solutions from Uponor, the total solutions provider of systems for the safe transportation of water around a building, for a new 200-bed, Leonardo Hotels branded facility in the heart of Bristol
Located in Temple Way at the gateway to Bristol’s Temple Quarter business district, close to the main train station and within walking distance of the city centre, the new hotel will become a popular destination for tourists and business travellers alike when it opens in early 2021.
To ensure that the hotel’s users would be provided with a hygienic water supply and a highly reliable heating system, the project’s M&E contractor Totus Engineering worked closely with Uponor on the building’s plumbing and water network.