Les références

Gaylord Pacific Resort & Convention Center,
Chula Vista,
USA

Prefabricated PEX Drives Efficient Hotel Riser Install

An 18-story resort and convention center in Chula Vista, CA, needed a streamlined HVAC piping solution that promoted timely installation. Control Air Enterprises selected a prefabricated Uponor PEX piping solution for the chilled water and hot-water risers to the guest room fan coils. Uponor Prefabrication Services added simplicity for additional labor savings on the project.
 
Customer Challenge
An 18-story resort and convention center in Chula Vista, CA, needed a streamlined HVAC piping solution that promoted timely installation.

Solution
Control Air Enterprises was responsible for installing the wet and dry side of the HVAC system for the Gaylord project. They needed a durable, reliable piping solution for the chilled water and hot-water risers that was lightweight and decreased installation times to help promote labor savings. Control Air was specifically concerned about the amount of time it would take to install the riser piping on the project. On past projects, the number of riser connections slowed their installation timelines and increased labor costs. A streamlined, lightweight solution would allow fewer installers to transport the pipe while a simple connection method would save time and further labor savings.

Results
Control Air Enterprises selected a prefabricated Uponor PEX piping solution for the chilled water and hot-water risers to the guest room fan coils. Leveraging Uponor Prefabrication Services, the risers were assembled offsite at the manufacturing facility and then transported to the resort for installation upon arrival. “Our installers were able to immediately slide everything into place. We’re only making four joints in the field and then moving to the next floor,” said Randy Ayers, division manager at Control Air Enterprises. Control Air partnered with Uponor Engineering Services to develop a support system for the risers consisting of just two supports per floor. This added simplicity for additional labor savings on the project. Ayers also noted that PEX is dramatically lighter than copper, so fewer crew members were needed to install the riser piping on each floor.



 

Location
US - West, California
Completion
2025
Vertical market
Hospitality
Application
Plomberie
Number of floors
18
Address
1000 H St, Chula Vista, CA 91910
Project Type
New building

View the Case Study Video Here

“Our installers were able to immediately slide everything into place. We’re only making four joints in the field and then moving to the next floor,” said Randy Ayers, division manager at Control Air Enterprises

Similar projects

Royalmount

Lorsque le promoteur Carbonleo a conçu Royalmount à Mont-Royal, au Québec, il a créé un espace axé sur les piétons qui privilégie le paysage durable, l’accès au transport en commun et la mobilité active. Royalmount est devenu une éco-communauté qui intègre parfaitement la nature dans sa conception intérieure-extérieure, offrant un mélange unique d’attractions expérientielles, de magasins de détail, d’espaces de bureau et d’hébergement ancrés dans la restauration et la conscience environnementale. Parce que le Québec connaît des hivers intenses avec des quantités imprévisibles de neige et de glace, Carbonleo avait besoin d’une solution pour chauffer les trottoirs extérieurs, permettant aux invités de profiter de l’installation en toute sécurité pendant l’hiver tout en protégeant la verdure extérieure.  

Cavalier Hotel

See how a century-old luxury hotel receives a major renovation that includes an Uponor PEX plumbing system...

Wilshire Grand

An Uponor radiant cooling system keeps the integrity of the world’s largest concrete pour for the tallest building west of the...

Radisson Blu

See why the the first hotel to be connected to the Mall of America brought in Uponor PEX as the plumbing solution for this...