Uponor soil drainage system Ultra Rib 2 in Kungälv
The coast zone will have municipally water and sewer
The coast zone will have municipally water and sewer
Important surface water project with demand for flexibility and length of life At last the problem with floods at Västra Vägen on Hönö became too big.
For those who will not leave the nearness to the town and will be closer to the nature, the future living is now built in Kärra, Borås.
The Weholite infratunnel in Linköping is almost 2 km in length and 2,200 mm in diameter. Water, sewage, district heating and cooling pipes as well as electricity and data cables are installed in the tunnel.
Uponor Infra secure future sewer transport with Weholite. Uponor´s contribution to this complex and prestigious project is not just about supplying Weholite. It also includes project management and technical support such as design and calculations, customized products and field service with onsite installation - all coherently coordinated by Uponor Infra Project Services.
Saving of buildable space
Skaraborgsvatten in the south of Sweden has replaced its old intake pipeline made of wood with a new one made of Polyethylene. The new system was not only easy and fast to install - it is also impact resistant and capable of withstanding high levels of mechanial stress.
Infra culvert in Skånes University Hospital in Malmoe
Le Chalet du célèbre joueur de Hockey sur glace finlandais, Sami Kapanen, a été construit en 2012 sur les bords du lac Kallavesi à côté de Kuopio. Le chalet est l'une des plus grandes demeures privées de Finlande. Le chalet a nécessité presque quatre fois plus de matériel que pour une maison individuelle standard.