Remplir le panier BIM à partir du catalogue de produits

561 Résultats trouvés
321 West Sixth Street, Austin, TX
Immeuble résidentiel

321 West Sixth Street, Austin, TX

The second-largest high rise in Austin's central business district required a plumbing solution that delivered installation speed and unmatched quality. Austin-based The Porter Company chose Uponor PEX-a and Kitting Services to decrease overall installation time, speed up the planning process, and facilitate quicker construction start times.

Uponor System Protects First Responders
Bâtiment tertiaire

Uponor System Protects First Responders

Customer Challenge
Deliver an efficient, sustainable snow and ice melting solution that keeps pace with a demanding construction schedule.
 
Cartuja Qanat
Institutions culturelles

Cartuja Qanat

Disruptive urban transformation through water and Uponor's Thermatop M solution. 

Leica Camera AG Headquarters
Bâtiment industriel

Leica Camera AG Headquarters

The company headquarters of Leica Camera AG features a unique architectural design – controls temperatures with solutions from Uponor and Zent-Frenger.

 
NK Zagreb's Training camp ZAGREBello
Installations sportives

NK Zagreb's Training camp ZAGREBello

NK Zagreb's Training camp ZAGREBello is the most up-to-date sports centre in Croatia.

Dudley College, Dudley
Installations sportives

Dudley College, Dudley

 The Advance II project is part of a transformation programme at Dudley College and the fifth new teaching facility to be constructed as part of the ‘Dudley Learning Quarter’ campus development.
Maksimir stadium, Zagreb
Installations sportives

Maksimir stadium, Zagreb

After the renovation, the field at Maksimir stadium in Zagreb, Croatia is now equipped with Uponor Meltaway, a snow and ice melting system.

Next stop: comfort
Immeuble résidentiel

Next stop: comfort

For the conversion of the historic building, the planners relied on decentralized apartment stations from KaMo and floor heating and cooling from Uponor.

South Kilburn residential site
Immeuble résidentiel

South Kilburn residential site

Connect the buildings to the district heating system that supplied the two site’s 300 apartments with hot water.

Nathan, Zevenaar
Bâtiment tertiaire

Nathan, Zevenaar

The technical heart of Nathan Zevenaar

The New Deichmanske Library - Bjørvika, Oslo
Bâtiment tertiaire

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.

The extension of Veljekset Keskinen is heated with Uponor's underfloor heating system
Bâtiment tertiaire

The extension of Veljekset Keskinen is heated with Uponor's underfloor heating system

The phenomenal Village Shop Keskinen in Finland, located in a tiny community called Tuuri with 500 people in South Ostrobothnia relies on Uponor underfloor heating system and snow-melt system.