Töltse meg a BIM kosarat a termékkatalógusból

548 Megtalált eredmények
Allo Alcantara Lisbon Offices
Irodaépület

Allo Alcantara Lisbon Offices

The new business center in the Portuguese capital for sustainability, technology, and people's well-being. 

Gaylord Pacific Resort & Convention Center
Hotelek

Gaylord Pacific Resort & Convention Center

An 18-story resort and convention center in Chula Vista, CA, needed a streamlined HVAC piping solution that promoted timely installation. Control Air Enterprises selected a prefabricated Uponor PEX piping solution for the chilled water and hot-water risers to the guest room fan coils. Uponor Prefabrication Services added simplicity for additional labor savings on the project.
 
Trident Park Malta TABS installation for sustainable cooling
Irodaépület

Trident Park Malta TABS installation for sustainable cooling

TABS installation in the maritime Mediterranean climate of Malta at Trident Park provides energy-efficient comfort indoor climate. 

Uponor filter chamber part of the stormwater study
Nyilvános épület

Uponor filter chamber part of the stormwater study

In recent years, stormwater quality management has become an increasingly important part of urban stormwater strategies. A pilot project was launched in Heinola to clean stormwater with innovative filter chambers developed by Uponor. At the same time, valuable research data will be collected on stormwater quality from two different types of areas and on the treatment results achieved with filter chambers.

Zaurak Residencial by Grupo Ibosa avant-garde and sustainability in the transformation of the banks of the Manzanares River
Többszintes társasház

Zaurak Residencial by Grupo Ibosa avant-garde and sustainability in the transformation of the banks of the Manzanares River

New Uponor collaboration with Grupo Ibosa and Morph Estudio

Uponor Iberia headquarters and logistics hub - Móstoles Madrid
Irodaépület

Uponor Iberia headquarters and logistics hub - Móstoles Madrid

This building complex is an exceptional reference on how sustainability and energy efficiency can be included into modern commercial and industrial building project

The Ágora Building Valencia
Sportlétesítmények

The Ágora Building Valencia

Designed by the local architect Santiago Calatrava, the Ágora building marks the conclusion of Valencia's City of Arts and Sciences complex in Spain.

EMT: Bus depot Madrid
Nyilvános épület

EMT: Bus depot Madrid

The Empresa Municipal de Transportes de Madrid, SA (EMT) installs Uponor´s Invisible Air- Conditioning system in the newly renovated bus parking facility.

Málaga Towers a high-rise complex that raises the standard of the fashionable city
Többszintes társasház

Málaga Towers a high-rise complex that raises the standard of the fashionable city

A sincere conversation based on harmony and sustainability between housing and the sea. This is how Lamela Architects Studio defines the complex of three residential towers designed by this studio and located on La Misericordia beach, next to the seafront promenade and near the historic center of Malaga.

Saddle restaurant first LEED® Gold certified restaurant in Spain
Hotelek

Saddle restaurant first LEED® Gold certified restaurant in Spain

The Saddle restaurant opened up in 2019 and is already considered one of the most authentic dining experiences in Madrid, Spain.

AquaDjurs takes the next step in efficient stormwater management
Nyilvános épület

AquaDjurs takes the next step in efficient stormwater management

The water and wastewater utility AquaDjurs is introducing a new solution to ensure effective treatment of stormwater. The solution is expected to significantly reduce installation and operational costs while improving the treatment performance of runoff.
 
 
321 West Sixth Street, Austin, TX
Többszintes társasház

321 West Sixth Street, Austin, TX

The second-largest high rise in Austin's central business district required a plumbing solution that delivered installation speed and unmatched quality. Austin-based The Porter Company chose Uponor PEX-a and Kitting Services to decrease overall installation time, speed up the planning process, and facilitate quicker construction start times.