Six housing companies located in the Hurttivuori district in Turku have a joint heating plant – Nokikana Oy. The terraced houses, which were built between 1975 and 1977, contain a total of 104 flats. Heating and water are supplied to all flats by a joint heating plant. Renovating the piping system became a necessity due to leaks. The plant's insulated elements were renovated in such a way that all residents were able to live in their homes for the entire duration of the renovation.

Projekt adatok

Turku, Finland
Családi ház
Flexibilis előszigetelt távvezetéki rendszer
Kész: 2016

Uponor feladat

120 flats in terraced houses: Uponor Thermo and Aqua single/twin pipes 110mm–18mm 5km, Q&E joints 18–63

Quick & Easy joint technology

Uponor's Quick & Easy joint technology was used at the site. The particularity is that, thanks to the joint technology, there was no need to assemble T-shaped pieces separately from parts. T-shaped joints made of PPSU plastic were used instead. This significantly reduces the number of joints remaining underground. The mains run all over the plot, and several branches were built.  One of the advantages of Q&E joints is that they are quick to install. Easy-to-use tools can always be installed without problems. The joints have also proved to be reliable in pressure tests.

- Pipes run underground for a total of 5 kilometres. This is an interesting site as it uses all of the products within the product group – from the large 110 mm pipe in the heat distribution room all the way to the 18 mm flat-specific pipes, says Uponor's regional sales manager Jani Piiroinen.
 

Faster project thanks to new joints

Master-Putki Oy is responsible for HVAC installations at the site. According to Managing Director Jouko Rantanen, the scale of the project becomes apparent when one sees the amount of material at the site. All installations have progressed extremely well and on schedule. The site will be completed within two months.

- Based of the fitters' feedback, the connection method is reliable and speeds up work. Work has been organised in such a way that all residents have been able to live normally in their homes throughout the renovation, emphasises Jouko Rantanen.

The renovation will provide the six housing companies, namely As Oy Hemppo, Isokoskelo, Uivelo, Metsäviklo, Merisirri and Vesipääsky, with a reliable and high-quality solution made to last.


 

Renovation of the district heating piping system of six housing companies

nokikana 700x450 kuva 0

Projekt információk

Projekt információk

Ország
Finland
Kész
2016
Projekt típusa
Felújítása
Épület típusa
Családi ház

Partnerek

Partnerek
Contractors: Maanrakennusliike Vähätalo Oy and Masterputki Oy

Hasonló projektek

D'or Apartmanok

D'or Apartmanok

Budapest egyik legszebb részén, a Sas-hegy aljában található ez a 88 lakásos "D'or Apartmanok" nevű társasház, mely 3 háztömbből áll. Az 1,23 hektáros ingatlanon három 5 szintes, 32, 31 és 25 lakásos háztömb található. A lakások kialakításánál a legfontosabb szempont az ideális élettér kialakítása volt, így az épületekben 46-105 m2 közötti otthonok kaphatnak helyet.
Single-family house's radon renovation

Single-family house's radon renovation

Päijät-Häme is one of the most radon-bearing areas of Finland. Teemu Saarinen from Hollola recognizes the problem. Saarinen measured the radon concentrations in his house and because the values were high he decided to install Uponor radon renovation package.
Getting rid of indoor radon

Getting rid of indoor radon

Uponor's radon system was installed in a detached house in Ilomantsi, completed in 1987. Previously, the radon values in the house were 1,188 becquerels. After installing the system, the radon values dropped to 83.
Luxury family log house

Luxury family log house

Sami Kapanen's dream home was built in 2012 on the shore of Lake Kallavesi near Kuopio. The log house is one of the largest private detached houses in Finland. The house required almost four times as much building services material as a normal detached houses.
A pilot project that still works like a dream

A pilot project that still works like a dream

Ervi and Liisa Helanto were among the first to own a Uponor biological treatment plant in Finland. The plant was installed in 1999. The user feedback that has been obtained since then has played an important role in the development of the device.

The biological treatment plant is worth its price

The Murto family, from Savonlinna, Finland, live in a sturdy log cabin built in 1845. The waste water system of the house had last been overhauled in the 1970s and the old concrete wells and absorption field had reached the end of their lifecycle. The choice was between renovating the old wells and getting an Uponor biological treatment plant, and the decision was not difficult to make.
Hausboot-Marina

Hausboot-Marina

450 metres of Uponor Ecoflex Supra PLUS pipes are used to transport drinking water and waste water in a new houseboat marina.
Villa Neureuther

Villa Neureuther

At Villa Neureuther in Garmisch-Partenkirchen, everything is geared towards comfort, and the quality is right down to the last detail.
Feng Shui home

Feng Shui home

An eco-friendly constructor and a bio-architect teamed up with Uponor Italy to create a balanced combination of new and old, for the perfect indoor climate.
Cottage in Tuscany

Cottage in Tuscany

Near Montevarchi, in the heart of Tuscany, installer Sandro Menga decided to renovate a rural house for his family to live in, using different Uponor solutions.
Wood housing

Wood housing

This "Class A" house is the maximum expression of the words "energy efficiency. This is first "Class A" project outside the Trentino-Alto Adige Region.
Single-family home

Single-family home

The TABS PE-DIR 40 concrete core activation system from Uponor provides efficient, draught-free cooling for a single-family home in Stettfurt.
Branksome Care Home

Branksome Care Home

Catering for an aging population is without question having an impact on the way companies across the UK market their product to the 'Grey' market.
Cromford Mill

Cromford Mill

Cromford Mill is a 3 bedroom holiday home plus static exhibition. Which has been installed with Uponor PEX Plumbing.
Cythia House

Cythia House

Popping up all over the country in the 60s the somewhat practical ‘boxes’ of the social housing market are iconic fixtures on the British landscape.
Elgin Road

Elgin Road

Due to the flexibility of not needing to be regulated; self builders are discovering that it is possible to install underfloor heating system with relative ease.
Momentai House

Momentai House

Momentai House is a magnificent luxury home, 5 bedrooms, 4 bathrooms, office, swimming pool area has MLCP UFH, Plumbing and UP36 Weather Compensation.
@SIXTY2

@SIXTY2

23 High Spec Apartments inc. cinema, gymnasium & spa. MLCP Plumbing System is used throughout the project.
Southwest Homes

Southwest Homes

After Saskatchewan passed the requirement for fire sprinklers in all assisted-living housing, this home needed a solution that would be fast and minimize...
Edelweiss

Edelweiss

See how our radiant heating system contributed to remarkable heating and cooling cost savings, and the first...
Thunderbird, Poole

Thunderbird, Poole

Uponor is proud to be the primary supplier of pipe work and underfloor heating to one of Britain´s most breathtaking buildings: the Thunderbird.
Waters Edge

Waters Edge

The Watersedge development in Weymouth offers all the mod conveniences such as contemporary kitchens and granite work surfaces.
West Bay

West Bay

West Bay in Bridport is a primary example of modern living. It utilises the sustainable technology of underfloor heating and flexible installation plastic pipework.
The plumbing in order in one go

The plumbing in order in one go

Tage and Marjo Mattson decided to renovate their water and radiator plumbing in the fall of 2014. The house was 38 years old then, as were the pipes. In total, the renovation only took a couple of weeks.
Johnson Residence

Johnson Residence

Justin Johnson and his wife, Jessica, had been planning their “forever home” for five years when they decided in late 2019 that they were finally ready to begin construction...