Uponor soil drainage system Ultra Rib 2 and surface water magazines in Borås Kärra
For those who will not leave the nearness to the town and will be closer to the nature, the future living is now built in Kärra, Borås.
For those who will not leave the nearness to the town and will be closer to the nature, the future living is now built in Kärra, Borås.
Weholite ensures safe and reliable transportation of stormwater and waste water - and safety is of utmost importance because the newly installed pipelines will run through a water protection area.
The Weholite infratunnel in Linköping is almost 2 km in length and 2,200 mm in diameter. Water, sewage, district heating and cooling pipes as well as electricity and data cables are installed in the tunnel.
Uponor Infra secure future sewer transport with Weholite. Uponor´s contribution to this complex and prestigious project is not just about supplying Weholite. It also includes project management and technical support such as design and calculations, customized products and field service with onsite installation - all coherently coordinated by Uponor Infra Project Services.
Saving of buildable space
Skaraborgsvatten in the south of Sweden has replaced its old intake pipeline made of wood with a new one made of Polyethylene. The new system was not only easy and fast to install - it is also impact resistant and capable of withstanding high levels of mechanial stress.
Infra culvert in Skånes University Hospital in Malmoe
Il nuovo quartier generale dello Spiegel Group si trova a Ericusspitze. Il sistema di attivazione termica delle masse di Uponor assicura un livello termico ottimale dell’edificio.
La casa dei sogni di Sami Kapanen , costruita nel 2012 sulle rive del lago Kallavesi, è una delle più grandi ville monofamiliari realizzate in Finlandia.