Aizpildiet BIM iepirkumu grozu no produktu kataloga
Mūsu e-pasta adrese ir mainījusies jautajums.lv@georgfischer.com

Realizētie projekti

540 Atrastie rezultāti
Daudzdzīvokļu ēka

Sampo Ltd multistorey building renovation

Sampo plc has chosen the Uponor technical wall as the solution for the renovation of the damp areas in several blocks of rental flats. The project is expected to run from March 2015 to February 2017. There are a total of 150 flats at the sites.

Rūpnieciskais īpašums

A durable and reliable solution for wastewater

The Weholite tanks, with an inner diameter of three metres, delivered to the Riihimäki wastewater treatment in Southern Finland will ensure that the plant keeps running, even during emergencies.

Daudzdzīvokļu ēka

Stylish rock home was renovated with practical viewpoint

Sipe Santapukki's appartment in the small multi story building that was built in 1930's was renovated thoroughly. Practicality, intimacy and energy efficient were the starting point for the renovation. Uponor's underfloor heating system and Drain gully system was chosen for the renovation.

Biroja ēka

Technopolis Innova 2 in Jyväskylä, Finland is heated by energy piles

In spring 2012, the six-storey Technopolis Innova 2 building was constructed on the shore of Lake Jyväsjärvi. The building makes use of geothermal energy, which is collected using energy piles. The solution has surpassed all expectations.

Privātmāja

A pilot project that still works like a dream

Ervi and Liisa Helanto were among the first to own a Uponor biological treatment plant in Finland. The plant was installed in 1999. The user feedback that has been obtained since then has played an important role in the development of the device.

Daudzdzīvokļu ēka

Small group home gets its own Clean II -wastewater treatment plant

The biochemical batch treatment plant Clean I has been serving residents of detached houses for more than 15 years. Clean II, which was launched in spring 2023, uses the same technology to purify twice as much water. It can therefore be used by, for instance, two detached houses. Clean II has been installed at a small group home in Hollola.
Transports un loģistika

Modernization of the lock on the barrage

At the Krapkowice barrage, the lock and control room are being modernized and the outports are being reconstructed. Uponor Infra delivered Weholite DN2000 SN8 polyethylene pipes as well as manholes, segmented bends and special fittings for this construction.
 
Transports un loģistika

Retention tanks for the multimodal terminal

In Zduńska Wola - Karsznice, one of the largest multimodal terminals in Poland is being built. The most important elements of the stormwater management system of this terminal will be a battery of two Uponor Infra retention tanks.

Viesnīca

Aqua Dome - A Combination of Nature and Thermal Springs

Since 2004 a transparent building in the shape of a crystal and swimming pools shaped like satellites have been drawing a daily total of up to 900 visitors, all seeking well-being, to Längenfeld.

Viesnīca

Hospice Sport & Spa

The Arlberg-Hospice Hotel in St. Christoph/Tyrol (Austria) and its chapel were built in 1386.