Casestudier

3500mm Weholite Ramsund, Norway

Prosjektfakta

Norway
Vei og Jernbane
Overvann
Ferdigstilt: 2014

Prosjektinformasjon

Prosjektinformasjon

Land
Norway
Ferdigstilt
2014
Prosjektype
Renovering
Bygningstype
Vei og Jernbane

Lignende prosjekt

Faroe Island tunnel with Uponor pipe system

Faroe Island tunnel with Uponor pipe system

In December 2020, the Faroe Islands opened the country’s longest undersea tunnel, which considerably reduces travel time between the most populated islands. The 11.2-kilometre tunnel represents a significant infrastructure investment, which also boasts the world’s first undersea roundabout. Beneath the road, a sophisticated system of pumps and kilometres of plastic pipework ensure that the road is kept free of water and safe for motorists.
Ice-free pavement throughout the year in Lahti

Ice-free pavement throughout the year in Lahti

The alterations to Aleksanterinkatu – the main street in the City of Lahti – will be completed by the end of 2016. The aim of the City's development projects is to make the centre more suitable for pedestrians and public transport. Uponor's role in the project is to build a snow melting system and the related frame lines for Aleksanterinkatu's pavements and zebra crossings. What is special about this project is that it marks the first time that Uponor's new Ecoflex Thermo Single 125/250 pipes have been used in Finland.
Retention systems for the S3 expressway

Retention systems for the S3 expressway

As part of the project “Construction of the second roadway of the S3 expressway along the Sulechów – Nowa Sól section – the second and third section” Uponor Infra provided pipes, sewer manholes and detention tanks.  
 
Storm water of the railway station

Storm water of the railway station

The specificity of constructing a storm water system as part of railway projects is that it must be resistant to, among other things, dynamic loads from the passing trains. In the case of the station in Konin, an important element of the storm water system is the retention tanks
Retention tanks in mountain areas

Retention tanks in mountain areas

Construction of the S1 expressway on the Przybędza-Milówka section, known as the bypass of Węgierska Górka. Uponor Infra polyethylene tanks were selected for drainage of the road system.