Power boost for Stockholm’s district heating network, Stockholm, Sweden

Power boost for Stockholm’s district heating network

Fakty o projekcie:

Stockholm, Sweden
Infrastruktura przemysłowa
Konstrukcje na zamówienie
Realizacja: 2019

Zaangażowanie Uponor

Wehotherm DN 800 7000 m

Previously known as Fortum Värme, the company adopted its current name a short while ago. “The company was renamed because the City of Stockholm bought half of it from Fortum about a year ago. In this respect, the city wants to be an active owner of its large stake in the energy company. It also meant much more cooperation with the city than before, both on practical and environmental matters. For example, we are working together to decommission our coal-fired heating plant in Värtan by 2020,” says Hans Jakobsson of Stockholm Exergi. Stockholm Exergi’s goal is to use 100% renewable fuels by 2022. This is of major im-portance for Stockholm’s climate strategy, since the city aims to be fossil-fuel-free by 2040. Stockholm is already considered one of the world’s cleanest capitals, having been rated the third most sustainable city in a comparison of 100 cities in the world.

A new culvert with better insulation
Stockholm Exergi manages 2,900 kilometres of district heating network in Stockholm area. The company invests some 300–350 Million Swedish kronor per year in the renewal of its network.  “A future challenge lies in the need to largely replace old culverts. We have replaced several special square culverts, and that is what we still have to prioritise,” Hans Jakobsson says.  Major ongoing renewal projects include the replacement of an old main pipeline between the Hässelby and Akalla districts in western Stockholm. “This will need to be replaced due to aging. In addition, we need to increase the size of  the pipe, from DN600 to DN800, so that it can transfer more heat energy between production facilities,” says Jakobsson, responsible for the project in Stockholm Exergi.

Uponor Infra will supply 7,000m of pre-insulated Wehotherm district heating pipes for the project. Wehotherm district heating elements are designed for the underground installation of district heating pipeline systems. Their polyurethane rigid foam preinsulation and rigid connection structure provide the system with excellent insulation properties, mechanical strength and a long life. “We have worked on several projects with Uponor, which was clearly the best choice of supplier for this project.” “With Uponor Infra´s district heating system, we will obtain a new culvert with better insulation,” says Hans Jakobsson.

Challenging work in the middle of a city
Construction of the new pipeline began in December 2017 and the work will be completed in September 2019.  The installation work has been fairly challenging, due to the pipeline´s location in a busy city environment with heavy traffic. “Laying large pipes in the middle of a city always involves challenges. The route crosses Mälarbanan, one of the busiest railway lines in Stockholm, and the management shaft is next to a major road in the city. Traffic works are also ongoing in the same area,” says Project Manager Rikard Söderström of Fjärrvärmeprojekt Sverige AB.  “The route also extends through an in-dustrial area with heavy traffic. There is little space for storing the pipes, which sets high demands on transport,” he adds. 

Rikard Söderström praises Uponor Infra’s deliveries, service and flexibility during the project. “Everything works just fine. Based on close dialogue with Uponor, we are able to plan the work as efficiently as possible. Their service has been excellent – we have no cause for dis-satisfaction! It’s very easy to work with Uponor,” Söderström sums up.

 

Power boost for Stockholm’s district heating network

stockholms_energi_1442x1000

Informacje o projekcie

Informacje o projekcie

Kraj
Sweden
Realizacja
2019
Rodzaj projektu
Renowacje
Rodzaj budynku
Infrastruktura przemysłowa

Podobne projekty

Transport wód nadosadowych, KGHM

Transport wód nadosadowych, KGHM

Pozytywne doświadczenia KGHM Polska Miedź S.A. z transportu odpadów poflotacyjnych zadecydowały o podjęciu decyzji o zastosowaniu systemów PEHD do transportu wód nadosadowych ze zbiornika odpadów poflotacyjnych.

FishGLOBE ferma rybna w Norwegii

FishGLOBE ferma rybna w Norwegii

As tall as an apartment building. A diameter of 22 metres. A volume of 3,500 cubic metres. FishGLOBE V5, a fish farming facility built and delivered to FishGLOBE AS in Stavanger in southwestern Norway, is the world’s largest PE plastic structure designed for marine conditions.
Record-breaking intake cooling system in the Philippines

Record-breaking intake cooling system in the Philippines

New challenges are where the Project Services Department at Uponor Infra feels most comfortable and can demonstrate its
continuously developing expertise. The aim on this occasion was to provide a seawater intake cooling system – a pipeline, intake structure and chlorination line – for the 420MW extension of the Pagbilao Coal Fired Power Plant on Luzon Island in the Philippines.
Sustainable  solution for  a pulp & paper mill

Sustainable solution for a pulp & paper mill

Weholite’s ability to withstand external wear, such as friction against the seabed, was an important criterion when the outfall pipe of Stora Enso’s pulp and paper mill in Nymölla, southern Sweden, had to be replaced.

 

 

Stora Enso Nymölla mill biogas facility

Stora Enso Nymölla mill biogas facility

Stora Enso Nymölla Mill in southern Sweden produces pulp- and wood-free uncoated paper and is the second largest paper manufacturing company in Europe. Nymölla Mill belongs to the "Paper" division and has an annual capacity of 340,000 tonnes of pulp and 485,000 tonnes of paper. The mill started in 1962 and has 540 employees. The paper manufactured by Nymölla Mill is recyclable, renewable and biodegradable. Approximately 90% of Nymölla Bruk's paper brands have eco-label certification that certifies the products' reduced environmental impact during the product's life cycle. Paper products from Stora Enso are available all over the world.
 
Record-breaking pipes in Keljonlahti

Record-breaking pipes in Keljonlahti

Construction of the pipe network for cooling water at the Keljonlahti power plant began in December 2008. 3,000/3,300 mm Weholite pipes were selected for the network. The combined length of the entire intake and discharge pipe network for cooling water is 1,714 metres.
Extension of the district cooling station seawater intake in Helsingborg, Sweden

Extension of the district cooling station seawater intake in Helsingborg, Sweden

 The district cooling system in Helsingborg involves the streamlining of current production. By means of seawater and using heat from the district heating network to power an absorption cooling unit, district cooling provides much better environmental values than electric cooling units. The district cooling station is an efficient source of cooling for buildings, industrial facilities and shopping centres.

 

Fish farming with the smallest possible footprint

Fish farming with the smallest possible footprint

Andfjord Salmon AS, a Norwegian fish farming company, has the ambition to create a sustainable, environmentally and fish-friendly onshore facility – with the smallest possible footprint. This patented facility combines the best from both traditional ocean net-pens and land-based salmon farming. The intake and outfall lines are built with highly durable Weholite PE pipes and panels with a 100-year life span.