Kościół w Hajnówce
Katolicki kościół parafialny pod wezwaniem św. Cyryla i Metodego w Hajnówce
Katolicki kościół parafialny pod wezwaniem św. Cyryla i Metodego w Hajnówce
Pušų Terasos (Pine terraces) is a multi-family residential building complex near the Baltic Sea in Klaipėda, Lithuania
The building located at Calle Tutor 16 (Madrid), owned by Arquia Inmuebles, has undergone a complete renovation and modernization, being partially demolished with the façade stabilized. A project designed by Tuñón y Albornoz Arquitectos and executed by SANJOSE Constructora, where the integration of Uponor's Invisible Air Conditioning in the Matrics raised technical floor developed by company Subway Systems.
The challenge began in 2021 when the building was completely redesigned to cut energy waste. Uponor Ecomate was installed to gain actionable insights into heating, cooling and power usage and improve the Town Hall's energy consumption and carbon footprint.
Justin Johnson and his wife, Jessica, had been planning their “forever home” for five years when they decided in late 2019 that they were finally ready to begin construction...
The indoor air of Uponor's two-storey head office in Vantaa is produced by an energy-efficient heating and cooling system.
The wavelike house presented at Mikkeli Housing Fair is an exclusive log house on the shores of Lake Saimaa designed by architect Seppo Mäntylä. The floor area of the laminated log house is 268.5 m2.
Postitalo, the former post office building in downtown Tampere, got a new look in 2017 when it was renovated into new commercial premises and a block of flats was built on top. The heat distribution system of choice was Uponor's underfloor heating and cooling system, which was installed in all flats.
Two seven-storey blocks of flats were completed in the Mukkula district in Lahti in late autumn 2015. Service flues were installed in a total of 108 flats at Asunto Oy Lahden Timonkadun Helmi on Timonkatu.
Tage and Marjo Mattson decided to renovate their water and radiator plumbing in the fall of 2014. The house was 38 years old then, as were the pipes. In total, the renovation only took a couple of weeks.
The 30 years old copper plumbing of the house were replaced with a Uponor composite system. The renovation was over in one day. The contractor for the job was LVI-Dalton Ltd from Klaukkala, Finland.
In the Maunula district of Helsinki, an exquisite joint renovation project is under way. The project, begun in 2012, involves six housing companies. The modernisation of the building technology is being implemented with elements from the Uponor Cefo line, for renovation of water, sewer, and ventilation systems, coming to 1,350 elements in total.