Wypełnij koszyk BIM z katalogu produktów

67 Znaleziono wyniki
Budynek jednorodzinny

Johnson Residence

Justin Johnson and his wife, Jessica, had been planning their “forever home” for five years when they decided in late 2019 that they were finally ready to begin construction...

Budynek jednorodzinny

Uponor's brand-new technology for a wavelike log house

The wavelike house presented at Mikkeli Housing Fair is an exclusive log house on the shores of Lake Saimaa designed by architect Seppo Mäntylä. The floor area of the laminated log house is 268.5 m2.

Budynek jednorodzinny

Upgrade of underfloor heating control system in a single-family house in Heinola

A single-family house in Heinola was suffering from uneven heat distribution. The problem was solved by upgrading the underfloor heating control system to Uponor's wireless Radio 24 V control system, which allows to regulate the temperature of each room separately.

Budynek jednorodzinny

The plumbing in order in one go

Tage and Marjo Mattson decided to renovate their water and radiator plumbing in the fall of 2014. The house was 38 years old then, as were the pipes. In total, the renovation only took a couple of weeks.

Budynek jednorodzinny

The plumbing in order in a single day

The 30 years old copper plumbing of the house were replaced with a Uponor composite system. The renovation was over in one day. The contractor for the job was LVI-Dalton Ltd from Klaukkala, Finland.

Budynek jednorodzinny

Getting rid of indoor radon

Uponor's radon system was installed in a detached house in Ilomantsi, completed in 1987. Previously, the radon values in the house were 1,188 becquerels. After installing the system, the radon values dropped to 83.

Budynek jednorodzinny

The biological treatment plant is worth its price

The Murto family, from Savonlinna, Finland, live in a sturdy log cabin built in 1845. The waste water system of the house had last been overhauled in the 1970s and the old concrete wells and absorption field had reached the end of their lifecycle. The choice was between renovating the old wells and getting an Uponor biological treatment plant, and the decision was not difficult to make.