Uponor Romania
Uponor Romania
Birou Bucuresti: Splaiul Unirii 76, parter, Sector 4, Bucureşti
Birou Cluj: B-dul Brâncuși, Nr. 174, Et. 3, 400462, Cluj Napoca
Studiu de caz

Zero emissions, maximum comfort, Gijón, Asturias, Spain

Zero emissions, maximum comfort

Greenspace PCTG in Asturias, Spain, is the first net-zero energy office building in the region and one of the few of its kind in the whole country. An impressive achievement made possible by a combination of highly efficient active energy and passive systems. Spanish architects EMASE Arquitectura worked with engineering firm SvR Ingenieros to create a sustainable, environmentally friendly design. It uses solar panels for keeping solar loads out of the building on one hand and to generate more energy than the building consumes on the other hand. In order to minimise the building’s energy use, the project partners turned to Uponor and its thermally active building systems (TABS) for heating and cooling.

Date despre proiect

Gijón, Asturias, Spain
Office buildings
Etaj: 1,500 square metres
Încălzire & răcire radiantă
Completare: 2020
Număr de etaje: 3

Implicarea Uponor

Thermally active building systems (TABS) with 7,500 metres of Uponor Comfort Pipe PLUS pipes
Support with HEAT2 simulation software from Uponor to find out best way to use TABS within the building

Between the basement, the three above-ground floors and the roof, Greenspace covers a total area of 1,500 square metres. Since it was opened in Gijón Technology Park in July 2020, it has hosted a range of start-ups and other companies with a focus on innovation and digital technology.

 

Minimising energy consumption

Greenspace has a positive energy balance: this means the building generates more power than it uses thanks to extremely efficient active and passive energy systems. The passive systems include, for example, insulation or natural lighting. The active systems involve the solar panels, the indoor climate solutions through the TABS and the radiant floor heating, as well as the monitoring and control of the building services.

Uponor provided the thermally active building system (TABS) which makes use of the thermal inertia of the building’s concrete structures. A network of 7,500 metres of Uponor Comfort Pipe PLUS was built into the structure of the building, using concrete core activation to store and release both heat and cold. The pipes carry water for the building’s heating and cooling systems and provide comfortable temperatures all year round. With the HEAT2 simulation software from Uponor, the project partners in Gijón were able to analyse the building’s static and dynamic thermal behaviour over time. This was the key to finding out the best way to use TABS.
 

Internationally certified

The energy concept includes much more, for example 134 solar panels, a lift that uses the energy of this panels or low-energy LED bulbs, controlled by intelligent sensors. The result of all these measures: a very pleasant working environment fostering creative thinking and high productivity. The range of energy efficiency and bioclimatic design measures employed, together with the use of renewable energy, healthy architecture, and low-emission materials, has seen Greenspace earn gold certification from LEED. This certification places Greenspace among the most sustainable buildings in the world.

“We needed a heating and cooling system that was tailored to the building structure while also being energy-efficient enough to fit in with our energy calculations and hydraulic design requirements,” says Ramón van Riet from SvR Ingenieros.

Zero emissions, maximum comfort

Greenspace PCTG net-zero energy building

Informații despre proiect

Informații despre proiect

Adresa
Parque Cientifico Tecnologico de Gijón
Țara
Spain
Completare
2020
Tipul proiectului
Clădire nouă
Tip de clădiri
Office buildings
Gama de produse
Contec

Parteneri

"With the support of Uponor's technology, EMASE Arquitectura and SvR Ingenieros were able to determine the ideal size for the solar panels and enery distributions systems." Ramón van Riet, SvR Ingenieros.

 

Parteneri

Architects: Emase Arquitectura, Madrid
https://www.emase.info/

Consultancy and LEED certification: Arup, Madrid
https://www.arup.com/

Project management and LEED commissioning: SvR ingenieros, Asturias
http://www.svringenieros.es/

Promoter: GesyGes Innovación en la Edificación

Proiecte similare

Bayer Qingdao ECB Lighthouse

Bayer Qingdao ECB Lighthouse

ECB Lighthouse, which serves as the administration building of a Bayer MaterialScience plant in Qingdao, is the first building in China of the Bayer Eco Commercial Building (ECB) Program.
The installation of Uponor storm water cassettes in Shopping Center Karisma, Lahti

The installation of Uponor storm water cassettes in Shopping Center Karisma, Lahti

In November 2011 one of the largest shopping centers of Finland was opened in Lahti. The Karisma shopping centre is one of Finland´s largest shopping centers measured by sales area and number of stores. Developer of Karisma is Kesko. Construction of Karisma has been one of the biggest investments ever in retail trade of Kesko. The main contractor of Karisma was SRV Rakennus ltd.
Day-care centre to be built with energy piles

Day-care centre to be built with energy piles

As requested by the City of Vantaa, the Vaaralanpuisto day-care centre has been planned based on the "nearly 0 energy days" concept. Construction work for the day-care centre began in late summer 2016, and the project will be completed in July 2017. Project costs are estimated at EUR 5.4 million, and the day-care centre will accommodate about 130 children. Among the various energy production options available for the site, the City of Vantaa chose the energy pile and solar thermal collector system jointly developed by Uponor and Ruukki.
Auron

Auron

The Uponor Contec ON concrete surface activation heats and cools the AURON office building complex in Munich.
Energy Efficiency Center

Energy Efficiency Center

The foyer, information centre and conference room at the Energy Efficiency Centre in Würzburg uses the Uponor Klett line for energy-efficient radiant heating and cooling.
Ericusspitze Spiegelhaus

Ericusspitze Spiegelhaus

New company HQ of the Spiegel Group is located at the Ericusspitze. The concrete core activation from Uponor ensures pleasant temperature levels in the building.
Brain Box Berlin

Brain Box Berlin

Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.

 

Leitradlofts, Cologne

Leitradlofts, Cologne

A hygienically optimal drinking water installation was integrated into the new office complex – thanks to Uni Pipe PLUS within a very short time.

First Uponor Comfort Panel project in Hungary

First Uponor Comfort Panel project in Hungary

An office building, where proper comfort is provided for doing your job The commercial buildings provide more or less limited space as the workplace for people. Therefore cooling the air is an important factor in maintaining their comfort during their stay. In order to keep the daily work undisturbed, the system used should be installed easily, should be efficient economically, and should be hygienic.
Immeuble Delta Green

Immeuble Delta Green

La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.

Standard Bank

Standard Bank

Uponor PE-Xa pipe used for refurbishment of chilled water pipelines in the head office of South Africa's Standard Bank located in Johannesburg.
Palazzo Ferrazzi - Brescia

Palazzo Ferrazzi - Brescia

Uponor brings the comfort of its Underfloor Heating & Cooling to a prestigious renovation project to transform a Norther Italy 1700s Palace into comfortable offices
Posco Green building

Posco Green building

POSCO Green Building located on the Yonsei University International Campus in Songdo,  has been equipped with radiant underfloor heating and cooling and Comfort panels from Uponor.
National Library of Latvia

National Library of Latvia

National Library of Latvia is the most impressive industrial project in Latvia of the last decade. Uponor provided the building with Uponor underfloor heating and MLCP pipes.
Agder fengsel in Norway

Agder fengsel in Norway

Statsbygg har fått i oppdrag av Justisdepartementet å bygge nytt fengsel i Agder, med avdelinger i Mandal og på Froland. Uponor fikk i oppdrag med å levere gulvvarme til begge fengslene, ca 100 000 meter med rør. Det er lagt gulvvarme i alle  rom på begge prosjektene. Uponor har også levert tappevann; Mandal fengsel med nye PPM fordelere, Froland fengsel messingfordelere. Uponor har også levert noe Ecoflex rør til prosjektene.
The New Deichmanske Library - Bjørvika, Oslo

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.
Rivergate

Rivergate

The RIVERGATE office building in Vienna, Austria, was certified as a Green Building by the EU andrelies on the efficient Contec ON concrete surface activation.
Berger Logistik

Berger Logistik

Berger Logistik transports goods by land, sea and air around the globe. The company was founded in 1961 by Johann Berger and is based in Wörgl, in the Tyrol region of Austria. 
Sunesis school scheme: Sacred Heart Primary School, West Midlands

Sunesis school scheme: Sacred Heart Primary School, West Midlands

Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.

HAMK's zero-energy hall uses energy piles

HAMK's zero-energy hall uses energy piles

Construction of Finland's first virtually zero-energy hall was completed in May 2015. The hall was built for the Thin Sheet Centre research unit of the Häme University of Applied Sciences (HAMK) and it draws its energy primarily from energy piles and solar panels.
Institut les Mines Telecoms Saclay

Institut les Mines Telecoms Saclay

Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.

Villeroy & Boch

Villeroy & Boch

Part of the historic abbey complex on the premises of Villeroy & Boch's headquarters in Mettlach has been completely renovated.
Poslovni centar Adris grupe

Poslovni centar Adris grupe

Arhitektonski projekt poslovnog centra Adris u Jagićevoj ulici 33. u Zagrebu, spoj je klasičnog i modernog. Gradnja poslovnog centra započeta je 2011., a završena 2015. kada se u nju smještaju zaposlenici Adris grupe i Croatia osiguranja. 
City Hall

City Hall

The challenge began in 2021 when the building was completely redesigned to cut energy waste. Uponor Ecomate was installed to gain actionable insights into heating, cooling and power usage and improve the Town Hall's energy consumption and carbon footprint.
Magnum Business center

Magnum Business center

MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.

MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.

Edificio de oficias en calle Tutor

Edificio de oficias en calle Tutor

The building located at Calle Tutor 16 (Madrid), owned by Arquia Inmuebles, has undergone a complete renovation and modernization, being partially demolished with the façade stabilized. A project designed by Tuñón y Albornoz Arquitectos and executed by SANJOSE Constructora, where the integration of Uponor's Invisible Air Conditioning in the Matrics raised technical floor developed by company Subway Systems.
Ilmalanlinna, Helsinki

Ilmalanlinna, Helsinki

Due to the interest rates of the floor structures, underfloor heating at Uponor's new head office required a solution that would raise the floor surface as little as possible. A functional result was achieved with an unusual implementation, low-structure underfloor heating plates, which are mainly used in renovations of detached houses, and which increase the floor height by only 15 millimetres.