Skylight Business Centre, Moscow, Russian Federation
Skylight Business Centre
Project facts
Uponor Involvement
The construction of the Business Centre began in 2003 when Sistema-Hals and Siemens entered the agreement on the project co-investment. When the building was in the process of construction it had been designed in the capacity of the Siemens Headquarters and had an alternative name Siemens Towers.
During the economic crisis the construction was suspended. In 2008, as a result of project cost increase Siemens refused its further participation, and in 2009 the agreement between the companies was terminated.
In 2010 Sistema-Hals renewed construction of the complex and announced its reconception. GK Modul was an on-site assembling contractor, and Hals Development was an ordering party.
The building is planned to be commissioned in the II quarter of 2012.
The peculiarity of the project is to release to the market the premium class object located in the area of the Third Ring Road. The favourable location of SkyLight complies with the requirements to withdraw business activities out of the city's historic centre.
Favoring Uponor systems
In the course of lengthy negotiations and meticulous consideration of the Uponor products' benefits the original decision to use the rival's products was changed in favour of Uponor. As the project implied using the pipes made of polyethylene the decision was taken to use the ones made by Uponor.
“The original project implied the usage of polyethylene pipes and it was the customer company's Director General who had taken the decision whether to use one system or another. I was struck favourably having to do with Uponor systems based on cross-linked polyethylene. They are quick and easy to install, feature both a high level of flexibility and functionality and affordable material cost. And I, as the general foreman, and based on my proven experience, will continue to offer Uponor systems to the customers,” says Evgenij Esaulov, the general foreman of the GK Modul's site.
The Uponor solutions based on cross-linked polyethylene were chosen for both 27-storey SkyLight buildings: heating system (the cross-linked polyethylene pipes eval PE-Xa with diameters of 16, 20 and 25 mm), plumbing system (the cross-linked polyethylene pipes PE-Xa with diameters of 20, 25 and 32 mm), underfloor heating system (the cross-linked polyethylene pipes PE-Xa with a diameter of 25 mm).
The installation of Uponor systems began in July 2011 and was completed by November 2011.
Project information
Project information
Similar projects
Alibaba headquarters
Uponor Shanghai office, China
Concrete core activation ČSOB Prague
Concrete core activation České Budějovice Research Library
S Group’s logistics centre for utility items
The installation of Uponor storm water cassettes in Shopping Center Karisma, Lahti
Remotely controlled security and convenience in temporary school building
Stable heating and draftless cooling from the ceiling
Varicool heating and cooling panels were installed to the meeting room's ceiling. The new hydronic system replaced the old fan coil unit system. Varicool system is a radiant heating and cooling system. The panels do not heat or cool the indoor air directly but the surfaces what radiant covers.
Kiviniityn Auto- ja Maatalouskonehuolto acquired a new underfloor heating and cooling solution
HAMK's zero-energy hall uses energy piles
Technopolis Innova 2 in Jyväskylä, Finland is heated by energy piles
The Kastelli community utilises smart building services
Uponor's head office is a model example of energy efficiency
Day-care centre to be built with energy piles
Klimahaus Bremerhaven 8°
Auron
Berliner Bogen
Energy Efficiency Center
Ericusspitze Spiegelhaus
Kranhaeuser
Brain Box Berlin
Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.
Leitradlofts, Cologne
A hygienically optimal drinking water installation was integrated into the new office complex – thanks to Uni Pipe PLUS within a very short time.
Villeroy & Boch
First Uponor Comfort Panel project in Hungary
Standard Bank
First radiant ceiling cooling renovation project in tropical climate – Singapore
First radiant ceiling cooling renovation project in tropical climate – Singapore
Palazzo Ferrazzi - Brescia
Posco Green building
LH Headquarter in Jinju
Passive building with high energy efficiency
Immeuble Delta Green
La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.
National Library of Latvia
Swedbank Head Office
Tap water system in new Swedbank head office.
Lithuanian National Art Gallery
"Sostena" Business Centre
Nathan, Zevenaar
Agder fengsel in Norway
Uponor in Sluppenveien 17
The New Deichmanske Library - Bjørvika, Oslo
Gazoil Plaza
Gorod Stolits (Capital City)
Samaraneftegaz - Rosneft Office Building
Tushino Business Center
Concrete Core Heating and Cooling Systems, Piešťany
Car dealership in El Escorial, Madrid
Ecobox Building
Zero emissions, maximum comfort
Uponor Iberia headquarters and logistics hub - Móstoles, Madrid
BESEL Head offices in Madrid
Länsförsäkringar Office building complex
BAE Systems Rochester
Sunesis school scheme: Sacred Heart Primary School, West Midlands
Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.
Business center
Reconstruction of the office building of the Pharmaceutical Company "Darnitsa"
Demo smart house «IC Smart HOUSE live»
Shopping and office center
Rivergate
Berger Logistik
Vestas headquarters
The extension of Veljekset Keskinen is heated with Uponor's underfloor heating system
Institut les Mines Telecoms Saclay
Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.
Bahnhofpark, Sargans
Austro Tower
Poslovni centar Adris grupe
City Hall
Magnum Business center
MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.
MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.