Тематическое исследование

Bahnhofpark, Sargans, Sargans, Switzerland

Bahnhofpark, Sargans

Факты:

Sargans, Switzerland
Офисные здания
Энергия и земля
завершение: 2012

Участие Uponor

8.000 sqm
The town of Sargans has attracted a great deal of attention with the "Bahnhofpark Areal Ost" project. Located directly at the point where Central, Eastern and Southern Switzerland meet, the complex accommodates a variety of uses, from education and shopping, to work and residential developments. The park is located right next to the train station in Sargans, so that it is also easily accessible from Zurich, Chur and St. Gallen.

A sustainable quality of life in Sargans
The new development is also intended to offer a sustainable quality of life. Some of the buildings opposite the train and bus station in the Bahnhofpark development are designed to screen the residential blocks that face onto the square. There is a green recreation area in the nearby nature park. The plans include around 8,000 m² of office and retail space in three buildings, while seven further buildings will include 40 rental apartments and 40 exclusive owner-occupier homes.

Close to surface ground energy technology
The Bahnhofpark development is currently the largest project in Switzerland to use close to surface ground energy technology (2010). Construction commenced in April 2010 and the development should be complete by April/May 2012. The general contractor is Bauengineering.com AG from Chur, while the project was developed by Swissbuilding Concept AG from St. Gallen, with Lippuner-EMT from Grabs acting as fitters and Chur-based Giubbini, ETH SIA AG providing special architectural services.

Uponor provides site services
The entire train station project is based on an ingenious building automation concept involving the environmentally friendly use of ground energy. In order to ensure long-term sustainability, the client and planner have focused particular attention on the choice of high-quality system solutions. Uponor was chosen as partners for ground energy technology. Hans Jörg Schwarz, CEO of Uponor AG, acted as consultant on behalf of Uponor.

Thermo-active piles used
The client decided to use close to surface ground energy technology, involving thermo-active piles. Approx. 38,000 m of Uponor PE-Xa pipes were used to harvest the ground energy. The thermo-active piles have already been installed on site and the foundations will then be excavated. Not only do heavy concrete components make suitable supporting elements, but can also be used effectively to store heat. Foundation piles can be used for this purpose. Each concrete surface can be designed with this in mind. The heat exchangers can only be installed while the building is under construction.

Effective and efficient use of heat
The economic benefits mainly derive from the fact that it is only necessary to use components that would have been necessary for structural engineering purposes in any case. This means that there is no need for additional drilling or installation work for ground energy collectors or probes. Close to surface ground energy technology uses the energy stored in the topmost layers of the soil to a depth of up to 400 m or in the groundwater. The temperatures of 8 to 12 degrees that apply here can be used in a variety of ways and can provide warmth and cold in order to heat and cool the building. This is an ideal solution for the design of the Bahnhofpark complex in Sargans.

Bahnhofpark, Sargans

bahnhofpark_sargans_1

Информация о проекте

Информация о проекте

Адрес
7320 Sargans
Страна
Switzerland
Веб-сайт
http://www.sargans.ch/portal/
завершение
2012
Тип проекта
Новое здание
Тип здания
Офисные здания

Партнеры

Партнеры
Architect:
Giubbini Architekten ETH SIA AG, Bahnhofplatz 7 CH-7001 Chur, Switzerland

Commercial Builders:
Bauengineering.com AG, Ringstrasse 34 CH-7004 Chur, Switzerland

Installer:
Lippuner-EMT/Engineering, Werdenstrasse 84+86 CH-9472 Grabs, Switzerland

Designer:
Swissbuilding Concept AG, Schuppisstrasse 7 CH-9016 St. Gallen, Switzerland

Подобные проекты

Gazoil Plaza

Gazoil Plaza

"Газойл Плаза" расположена на юго-западе Москвы в непосредственной близости от штаб - квартир ОАО "Газпром" и ЗАО "Газпромбанк".
Day-care centre to be built with energy piles

Day-care centre to be built with energy piles

As requested by the City of Vantaa, the Vaaralanpuisto day-care centre has been planned based on the "nearly 0 energy days" concept. Construction work for the day-care centre began in late summer 2016, and the project will be completed in July 2017. Project costs are estimated at EUR 5.4 million, and the day-care centre will accommodate about 130 children. Among the various energy production options available for the site, the City of Vantaa chose the energy pile and solar thermal collector system jointly developed by Uponor and Ruukki.
Brain Box Berlin

Brain Box Berlin

Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.

 

First Uponor Comfort Panel project in Hungary

First Uponor Comfort Panel project in Hungary

An office building, where proper comfort is provided for doing your job The commercial buildings provide more or less limited space as the workplace for people. Therefore cooling the air is an important factor in maintaining their comfort during their stay. In order to keep the daily work undisturbed, the system used should be installed easily, should be efficient economically, and should be hygienic.
Immeuble Delta Green

Immeuble Delta Green

La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.

Agder fengsel in Norway

Agder fengsel in Norway

Statsbygg har fått i oppdrag av Justisdepartementet å bygge nytt fengsel i Agder, med avdelinger i Mandal og på Froland. Uponor fikk i oppdrag med å levere gulvvarme til begge fengslene, ca 100 000 meter med rør. Det er lagt gulvvarme i alle  rom på begge prosjektene. Uponor har også levert tappevann; Mandal fengsel med nye PPM fordelere, Froland fengsel messingfordelere. Uponor har også levert noe Ecoflex rør til prosjektene.
The New Deichmanske Library - Bjørvika, Oslo

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.
Sunesis school scheme: Sacred Heart Primary School, West Midlands

Sunesis school scheme: Sacred Heart Primary School, West Midlands

Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.

Rivergate

Rivergate

The RIVERGATE office building in Vienna, Austria, was certified as a Green Building by the EU andrelies on the efficient Contec ON concrete surface activation.
Berger Logistik

Berger Logistik

Berger Logistik transports goods by land, sea and air around the globe. The company was founded in 1961 by Johann Berger and is based in Wörgl, in the Tyrol region of Austria. 
Institut les Mines Telecoms Saclay

Institut les Mines Telecoms Saclay

Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.

Poslovni centar Adris grupe

Poslovni centar Adris grupe

Arhitektonski projekt poslovnog centra Adris u Jagićevoj ulici 33. u Zagrebu, spoj je klasičnog i modernog. Gradnja poslovnog centra započeta je 2011., a završena 2015. kada se u nju smještaju zaposlenici Adris grupe i Croatia osiguranja. 
City Hall

City Hall

The challenge began in 2021 when the building was completely redesigned to cut energy waste. Uponor EEaaS was installed to gain actionable insights into heating, cooling and power usage and improve the Town Hall's energy consumption and carbon footprint.
Magnum Business center

Magnum Business center

MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.

MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.