Тематическое исследование

LEO 250, München, Germany

LEO 250

Факты:

München, Germany
Многоэтажные дома
Лучистое отопление и охлаждение
завершение: 2013

Участие Uponor

9000
193 condominiums are currently being constructed on 250 Leopoldstrasse in Munich-Schwabing, projected to be completed by mid-2013. The apartments are located in a sought-after area and offer a great view of the Munich skyline. Planned by KLAUS Wohnbau, the buildings convince prospective buyers through both their exterior and interior qualities. All of the condominiums have already been sold before completion.


Uponor’s heating systems have been used for 20 years


The project owners build and sell around 150-170 luxury apartments in Munich and Augsburg every year. For over 20 years now, floor heating has been a permanent design feature. Volker Grosshauser, General Manager and CTO at KLAUS Wohnbau GmbH, emphasises: "We prefer to rely on the expertise of a market leader, which is why we have been opting for Uponor's radiant heating systems for the last twenty years. What's important to us, apart from the quality and reliability of the products, is that Uponor supplies us with harmonised system components. Their excellent technical support is another big plus. With Uponor on board, we can install systems that are perfectly matched to our planning requirements."


The Uponor self-attaching floor heating system is quickly installed and easily modified. The fast installation concept speeds up the individual construction stages considerably, and any required follow-up work can commence immediately. For LEO 250, this meant that the apartments could be shown to potential buyers very early on.


Flexibility at a glance


The housing estate impresses with daring building geometries: Based on rectangular floor plans, the architects included a number of arching interior and exterior walls in their designs. This was also a good reason to opt for the flexible Uponor self-attaching floor heating system, as it easily accommodates a wide variety of room geometries.


The piping system chosen for the apartments consists of PE-Xa RED self-attaching polyethylene pipes (16 x 1.8 mm). These pipes are both flexible and sturdy, which makes them very easy to install. Additionally, they have excellent creep strength and are resilient against stress cracks. PE-Xa piping is shipped from the factory spiral-wrapped in self-attaching tape. Uponor's self-attaching insulation boards are fully covered with adhesive film. The insulation boards ship rolled or folded and in a range of thicknesses.


Fast installation which convinces


Installing the heating pipes is fast and cost-efficient as it requires no installation or fastening tools. The insulation boards are simply laid out and fastened together at the edges with adhesive film. Next, the pipes are rolled off and pressed against the insulation boards – by foot and requiring very little pressure. The self-attaching tape on the pipes locks together with the adhesive film on the boards, instantly fastening the pipes. As was the case with LEO 250, the Uponor self-attaching system can therefore be installed quickly by a single person. This cuts down on assembly time and accordingly also on costs.


During the project's first stage of construction, aquatherm GmbH from Aschheim/Germany installed a total of 5,967 m² of Uponor self-attaching boards and piping in the initial 75 building sites. "The fast installation method totally convinced us. We were able to lay the pipes easily and without requiring any additional tools," says Wolfgang März, Managing Director for aquatherm GmbH.


Uponor’s solutions for “green” buildings – comfort included


The LEO 250 housing estate is being built according to Germany's discerning KfW 70 Energy Efficiency House standard. As well as through energy-efficient radiant heating and insulation, LEO 250 further reduces its energy costs through using

LEO 250

gallery_uponor_leo_1_desktop

Информация о проекте

Информация о проекте

Адрес
Leopoldstraße 250
Страна
Germany
завершение
2013
Тип проекта
Новое здание
Тип здания
Многоэтажные дома
Линейки продукции
Uponor Klett

Партнеры

Партнеры

architect
KLAUS Wohnbau
Niederlassung München Nymphenburger Straße 15
80335 Munich
GERMANY

Подобные проекты

A housing company in Turku saved time and money using Uponor's Cefo pipe overhaul

The Petreliuksenrinne housing company controls a group of residential buildings that were constructed in 1969. The company manages 124 flats, which were subject to an overhaul of their water supply and sewerage systems. The floor drains, bathrooms, electricity distribution and antenna systems were also overhauled.

A line renovation was carried out in a block of flats in Turku using Uponor's R2I elements

Line renovations in blocks of flats can be conducted significantly faster and more easily. The Uponor R2I cassette makes for a problem-free renovation. Thanks to advanced prefabrication, the project period is shorter and the risks are lower. The As Oy Varsta company in Turku is the first R2I pilot site. The site will be completed to an expedited schedule.
Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

An 8-storey apartment is rising in a former bank district in Lahti. The target will contain 265 apartments and is designed by A1 Arkkitehdit Oy and will be built by Nuorisosäätiö. There are 256 rental apartments reserved for students on floors 2-7. Uponor R2I blocks will be installed in all of the student-apartments in connection with bathroom and kitchen elements. Aleksi 5 is the first new destination in which R2I blocks are being delivered and in which sound-absorbing Decibel drains are used.
Ewha Campus Complex

Ewha Campus Complex

Ewha Womans University had planned the underground campus, which is a global trend for space creation, in order to solve the problem that the available space on the ground was insufficient despite the increase in the space demand in the campus, in accordance with the Ewha Womans University Development Plan in the 21st century.

George Street

George Street

Uponor products set the standard for off-site construction projects by providing a quick to install, cost-effective and high performance plumbing system for the safe delivery of domestic water services for the world’s tallest modular apartment building.