Iz kataloga izdelkov napolnite košarico BIM

546 Najdeni rezultati
FELSAN Factory
Industrijski objekt

FELSAN Factory

Uponor Invisible Climate in a factory in Albacete

Fujy
Enodružinska hiša

Fujy

Fujy-Natural Architecture

BESEL Head offices in Madrid
Poslovni objekt

BESEL Head offices in Madrid

Uponor has installed 2,000 m² of Invisible Climate

Tap water installation for a new hockey stadium in Bratislava
Športni objekti (notranji/zunanji)

Tap water installation for a new hockey stadium in Bratislava

The venue of the 75th IIHF World Ice Hockey Championship, which were held in spring 2011, utilised Uponor’s solution for tap water installation.

 

Dolce Vita
Trgovina - komerciala

Dolce Vita

Uponor technology to cool one of Europe’s largest shopping centres

Javni objekti

Airport in Rzeszów

The International Rzeszów-Jasionka Airport is situated in the Podkarpacie Province – one of the most beautiful regions of Poland.

Media Centrum
Poslovni objekt

Media Centrum

Stadion Tychy
Športni objekti (notranji/zunanji)

Stadion Tychy

Hospital in Rzeszów
Javni objekti

Hospital in Rzeszów

Provincial Hospital in Rzeszów. Medical rescue dept.

Elementary school in Poznan
Javni objekti

Elementary school in Poznan

This is the first school built from scratch after 1989 in Poznan. The construction of this modern educational center started in 2009 and was completed in 2011.

Church in Hajnówka
Javni objekti

Church in Hajnówka

Catholic parish church dedicated to St. Cyryl and Metody in Hajnówka.

The New Deichmanske Library - Bjørvika, Oslo
Poslovni objekt

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.