Industrimark

Jäähdytysvesiputki hallitusti merenpohjaan

Hangon edustalla laskettiin huhtikuussa mereen Weholite Marine -putki – kooltaan ID/OD 1 000/1 125 mm – tuomaan jäähdytysvettä 22 metrin syvyydestä.
Industrimark

Patourakka vie rakentajat veden alle

Fortum kunnostaa Tainionkosken vesivoimalaitoksen säännöstelypadon lähivuosina. Ennen kuin miljoonien eurojen ja useiden vuosien jättiurakka päästään aloittamaan, on padon eteen rakennettava varasulkurakenteet.
Industrimark

Record-breaking pipes in Keljonlahti

Construction of the pipe network for cooling water at the Keljonlahti power plant began in December 2008. 3,000/3,300 mm Weholite pipes were selected for the network. The combined length of the entire intake and discharge pipe network for cooling water is 1,714 metres.

Industrimark

A durable and reliable solution for wastewater

The Weholite tanks, with an inner diameter of three metres, delivered to the Riihimäki wastewater treatment in Southern Finland will ensure that the plant keeps running, even during emergencies.

Industrimark

Record-breaking intake cooling system in the Philippines

New challenges are where the Project Services Department at Uponor Infra feels most comfortable and can demonstrate its
continuously developing expertise. The aim on this occasion was to provide a seawater intake cooling system – a pipeline, intake structure and chlorination line – for the 420MW extension of the Pagbilao Coal Fired Power Plant on Luzon Island in the Philippines.
Industrimark

Fish farming with the smallest possible footprint

Andfjord Salmon AS, a Norwegian fish farming company, has the ambition to create a sustainable, environmentally and fish-friendly onshore facility – with the smallest possible footprint. This patented facility combines the best from both traditional ocean net-pens and land-based salmon farming. The intake and outfall lines are built with highly durable Weholite PE pipes and panels with a 100-year life span.

Industrimark

Drainage system for heat and power station

Slotted drainage VipLiner module made by Uponor Infra has been chosen to build a drainage system for heat and power station of Gdynia.

Industrimark

Construction of raw water pipelines for the power plant

One of Europe’s largest power plants is being built in Kozienice in central Poland. Uponor Infra pipes and manholes were used when building the raw water line.

Industrimark

Brown coal mine drainage systems

Uponor Infra has been delivering for the last dozen or so years the PEHD systems for surface drainage of brown coal mine