New water pipeline, Mikkeli, Finland
Safe, fast and easy
Durable Uponor Barrier PLUS pipes ensure safe main water supply and quick, easy installation in the old Graan industrial area in Mikkeli, where numerous new apartment buildings will be built in the next few years.
Projektfakta
Uponors roll
800 metres of Uponor PE pressure pipes with a diameter of 225 mm
It was formerly used by the wood industry – a steam-powered sawmill was established there back in 1890. In 1938–1986, a plywood mill and wooden house factory operated next to the sawmill. However, the company went bankrupt and the buildings were demolished in the 1990s.
Decades of industrial activity have left their mark on the site – for this reason, soil remediation has now been carried out. “Soil studies found substances such as petroleum hydrocarbons and heavy metals. During the remediation work, thousands of cubic metres of contaminated soil were removed and replaced with clean new soil,” says Petri Pynnönen, Supervisor at Talpa Oy, which is currently carrying out a contract to install a new water main that will serve around 2,000 residents.
Slightly less than 200 metres of the kilometre-long pipe runs through the remediated area. Even though the soil is now clean, the developer, the Mikkeli Water Utility, wanted to be absolutely sure that the water main would be safe. Uponor Barrier PLUS pipes with a diameter of 225mm will be used for the section of the water main that passes through the previously contaminated area. The rest of the main will be built using ordinary Uponor PE water pipes.
Pynnönen says that the first apartment buildings were erected on this peninsula in the 1990s. “The plastic pipes available back then did not provide protection against pollutants, so the water lines were made using cast iron pipes.”
Easy to handle, quick to install
Talpa wanted to use plastic pipes for the project – and, after hearing about the new Uponor Barrier PLUS pipes, decided to choose them. “This is our first project in which we’re using Barrier PLUS pipes,” says Pynnönen.
They proved to be very easy to handle and install. “The pipes are light and flexible, thanks to which they are easy and fast to install. Their flexibility also means that small changes in direction can be implemented safely.”
He also praises the speed and ease of installing wraps around the pipe seams. There are just under 20 seams on the 200-metre section of pipe. “The work is going very smoothly – it only takes about 10 minutes to wrap each seam. Once the plastic wrap has been installed around the protective jacket of the pipe, a shrink sleeve is heated over it to seal it tight. The wraps and shrinks are pre-dimensioned for the pipe, so there is no need to measure or cut them to fit.
The pipes are light and flexible, thanks to which they are easy and fast to install. Their flexibility also means that small changes in direction can be implemented safely.
Projektinformation
Projektinformation
Samarbete
Installer: Maanrakennus Talpa Oy
Liknande projekt
Storsatsning vid Skånes universitetssjukhus i Malmö
Testinstallation av infrakulvert med stor potential
Starkt, säkert och flexibelt
Innovativt - Pålitligt - och installerad på 11 dagar
Uponor markavloppssystem Ultra Rib 2 i Kungälv
Säkert och Hållbart
Infrakulvert Vallastaden
Fokus på framtida hållbarhet
Weholite installerat i Valdemarsvik
Uponor Vault renar dagvatten
ProFuse installerat i Borås Stad
Första installationen av Ultra Rib 2 Blue
Dagvattenmagasin i Järvastaden
Plastic ensures condensation-free ventilation at new hospital and research facility
Pump structure secures stormwater system’s long life
Drinking water passing through contaminated area in Thisted
Intake pipeline for seawater in Copenhagen Harbour
Butt welding by night of 900 mm pipes ensures stable operation of a district cooling solution in Copenhagen Harbour.
TV-Tower, Estonia
PE pressure sewer system from Harjavalta to the city of Pori
New Uponor IQ –Storm water system - Sustainability and Quality in Road Infrastructure
Ultra Double replace concrete pipe line in Raahe
ProFuse pressure pipe line provides drinking water to cottage owners in islands near by Uusikaupunki
Environmental friendly heating and storm water systems in new Launonen day-care centre
Now that’s truly FAST
Handling storm water in a smart way
Secure tunnel trunk lines
Life is grand for graylings in the pure waters of Ounasjoki River
Europe’s largest ever plastic culvert goes to Norway
Don’t count on luck to protect you from flooding
Clean drinking water for 17,000 scouts
Iisalmen Vesi renovated a trunk line by relining
To rebuild an office building located in the heart of Amsterdam into 150 appartments in a relatively short time is definitely a big challenge.
Weholite limits overflows and pollution in London
Fighting against an ecological disaster in a world-record time
Rapid action was critical when a sewage collector broke in Warsaw, Poland, causing a massive waste spill into the Vistula River. Uponor Infra’s crew worked 24 hours a day in order to stop the pollution of the river. A temporary pipeline was produced, delivered and connected in just eight days.
Sewage pipelines to sewage treatment plant - HDD method
Collectors for sewage treatment plant
Renovation of reinforced concrete sewer - relining method
Sewage retention chanel
Renovation of cast iron water supply pipeline - swagelining
Thanks to swagelining technology, it was possible to carry out most of the water line modernisation works in the centre of the city of Łódź, in a built-up area, along traffic lanes with heavy traffic of motor vehicles and trams.
Sea outlet - discharge of stream water into the Gdańsk Bay part 2
Renovation of damaged stoneware collector – cracking/short relining
Sewage separation system
Construction of storm water collectors in Nowe Polkowice is one of the stages of a big investment concerning the drainage of the district.
Sea outlet of treated wastewater
A sea outlet of treated wastewater was initiated in Swarzewo. It is yet another of the many environmentally friendly projects that have recently been carried out in Poland where PE pipes were used.
Hybrid solutions for storm water management
City of Lahti is building new neighborhood called Ranta-Kartano. While they were constructing basic infrastucture the city saw the possibilty to reserve some ground space for storm water management. Now there is a test running for different kind of storm water management. Uponor is involved with new type of storm water filter.
An easy and reliable storm water solution
Flow measurement reveals leaks in the water supply network
Fire wastewater safely recovered
Water treatment plant
Quick installation in the Konotopa channel
Super-sized cooling
Weholite tanks have multiple uses
Water supply in very demanding terrain in Norway
A smart retention system for an anti-flooding solution
September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.