Drinking water passing through contaminated area in Thisted, Thisted, Denmark
Drinking water passing through contaminated area in Thisted
Citizens’ safety was key when a Danish water utility sought to protect the municipality's drinking water from toxic chemicals at a former industrial site with busy traffic. By choosing Uponor Barrier PLUS pipes, the utility company now has a fully plastic barrier pipe system with an expected lifespan of more than 100 years.
When planning a new main water pipeline in Thisted, northern Denmark, utility company Thisted Vand faced a major challenge. The area had a pollution degree rating of 2, indicating a serious risk of toxins getting into the water carried by the new pipes. The company was concerned because toxins from contaminated soil or other risk areas can penetrate standard polyethylene water pipes. This would, of course, present a serious risk to public drinking water.
Projektfakta
Uponors roll
A long-term solution once and for all
Thisted Vand has been a customer of Uponor Infra for many years and was already familiar with Uponor Barrier PLUS piping, a pressure pipe system developed specifically for running drinking water through contaminated soil areas.
Jacob Bertelsen, Manager responsible for drinking water, outlines some of the reasons why the company opted for the Barrier PLUS pipe system.
“The main thing for us was that the pipeline should be able to prevent toxic chemicals, bad taste and odours from getting into the drinking water for many years to come,” he says.
The area’s pollution degree rating of 2 dates back to a time when there was a gasworks on the site –aromatic substances can still be traced to that source. Later on it was home to a wood business that impregnated wooden posts, releasing chlorinated solvents that can still be detected in the soil.
But there were also design and construction factors.
“The area where the water pipeline was to be laid had fairly busy traffic, including some heavy vehicles. Therefore, it was vital to establish a sustainable long-term solution once and for all, one that would not cause too many traffic disruptions in the construction phase,” says Bertelsen.
100% plastic – 100% safe
Product Manager Karsten Højlund of Uponor Infra is all too familiar with the reasons behind the contamination concerns.
“For many years, Danish water companies have been asking for pressure pipes with a totally secure plastic barrier inside the barrier layer, as they want to install a solution that’s 100 per cent safe. Like Thisted Vand, others have also expressed concern about the chlorinated solvents in the soil: corrosion can occur when substances like trichloroethylene (TCE) in the soil come into contact with an aluminium barrier.”
With the Barrier PLUS system, Thisted Vand now has a fully plastic barrier pipe system, which also includes PE Barrier Wraps for wrapping the pipes. This eliminates issues related to the potentially harmful effects of TCE.
“The company can rest fully assured that the plastic barrier layer in Barrier PLUS will protect the municipality’s drinking water against contamination from chemicals, crude oils and pesticides in the soil, as well as external environmental factors,” says Karsten Højlund.
Projektinformation
Projektinformation
Samarbete
Barrier PLUS barrier pipes: Uponor Infra A/S
Liknande projekt
Storsatsning vid Skånes universitetssjukhus i Malmö
Testinstallation av infrakulvert med stor potential
Starkt, säkert och flexibelt
Innovativt - Pålitligt - och installerad på 11 dagar
Uponor markavloppssystem Ultra Rib 2 i Kungälv
Säkert och Hållbart
Infrakulvert Vallastaden
Fokus på framtida hållbarhet
Weholite installerat i Valdemarsvik
Uponor Vault renar dagvatten
ProFuse installerat i Borås Stad
Första installationen av Ultra Rib 2 Blue
Dagvattenmagasin i Järvastaden
Plastic ensures condensation-free ventilation at new hospital and research facility
Pump structure secures stormwater system’s long life
Intake pipeline for seawater in Copenhagen Harbour
Butt welding by night of 900 mm pipes ensures stable operation of a district cooling solution in Copenhagen Harbour.
TV-Tower, Estonia
PE pressure sewer system from Harjavalta to the city of Pori
New Uponor IQ –Storm water system - Sustainability and Quality in Road Infrastructure
Ultra Double replace concrete pipe line in Raahe
ProFuse pressure pipe line provides drinking water to cottage owners in islands near by Uusikaupunki
Environmental friendly heating and storm water systems in new Launonen day-care centre
New water pipeline
Now that’s truly FAST
Handling storm water in a smart way
Secure tunnel trunk lines
Life is grand for graylings in the pure waters of Ounasjoki River
Europe’s largest ever plastic culvert goes to Norway
Don’t count on luck to protect you from flooding
Clean drinking water for 17,000 scouts
Iisalmen Vesi renovated a trunk line by relining
To rebuild an office building located in the heart of Amsterdam into 150 appartments in a relatively short time is definitely a big challenge.
Weholite limits overflows and pollution in London
Fighting against an ecological disaster in a world-record time
Rapid action was critical when a sewage collector broke in Warsaw, Poland, causing a massive waste spill into the Vistula River. Uponor Infra’s crew worked 24 hours a day in order to stop the pollution of the river. A temporary pipeline was produced, delivered and connected in just eight days.
Sewage pipelines to sewage treatment plant - HDD method
Collectors for sewage treatment plant
Renovation of reinforced concrete sewer - relining method
Sewage retention chanel
Renovation of cast iron water supply pipeline - swagelining
Thanks to swagelining technology, it was possible to carry out most of the water line modernisation works in the centre of the city of Łódź, in a built-up area, along traffic lanes with heavy traffic of motor vehicles and trams.
Sea outlet - discharge of stream water into the Gdańsk Bay part 2
Renovation of damaged stoneware collector – cracking/short relining
Sewage separation system
Construction of storm water collectors in Nowe Polkowice is one of the stages of a big investment concerning the drainage of the district.
Sea outlet of treated wastewater
A sea outlet of treated wastewater was initiated in Swarzewo. It is yet another of the many environmentally friendly projects that have recently been carried out in Poland where PE pipes were used.
Hybrid solutions for storm water management
City of Lahti is building new neighborhood called Ranta-Kartano. While they were constructing basic infrastucture the city saw the possibilty to reserve some ground space for storm water management. Now there is a test running for different kind of storm water management. Uponor is involved with new type of storm water filter.
An easy and reliable storm water solution
Flow measurement reveals leaks in the water supply network
Fire wastewater safely recovered
Water treatment plant
Quick installation in the Konotopa channel
Super-sized cooling
Weholite tanks have multiple uses
Water supply in very demanding terrain in Norway
A smart retention system for an anti-flooding solution
September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.