ReferenceDistortion tanks for the new hospital park, Rikshospitalet,
Distortion tanks for the new hospital park, Rikshospitalet,
Oslo,
Norway
Two pcs. Weholite drainage tanks for stormwater management
We delivered two retention basins with capacities of 149 m³ and 236 m³ to the new hospital park at Rikshospitalet. This solution is designed to manage stormwater in the area. The contractor for the project is Consto Anlegg AS.
Location
Oslo, Norway
Dokončení
2024
Typ budovy
Hospitals
Product systems
Dešťová voda
Comprehensive digestion solution with large capacity
Retention is a key component of stormwater management. The purpose of a retention basin is to delay and control runoff, so that stormwater is gradually released into the sewer system or natural waterways.
For the project at Rikshospitalet, we supplied two basins consisting of several long sections—one 149 m³ basin with two sections of 24 m each, and one 236 m³ basin with two sections of 25 m each. Both basins have an internal diameter of 2000 mm.
This solution is designed to contribute to effective stormwater management in the area.
Plastic retention tanks offer a number of advantages
With Weholite, we manufacture retention tanks that offer a number of advantages—including during installation—which is why our solution was chosen for the project at Rikshospitalet:
Their low weight makes the basins easy to handle
We supply long lengths without joints—which reduces installation time
Another advantage of the PE material is that it is resistant to external influences. Our solution has a design life of at least 100 years.
For the project at Rikshospitalet, we supplied two basins consisting of several long sections—one 149 m³ basin with two sections of 24 m each, and one 236 m³ basin with two sections of 25 m each. Both basins have an internal diameter of 2000 mm.
This solution is designed to contribute to effective stormwater management in the area.
Plastic retention tanks offer a number of advantages
With Weholite, we manufacture retention tanks that offer a number of advantages—including during installation—which is why our solution was chosen for the project at Rikshospitalet:
Their low weight makes the basins easy to handle
We supply long lengths without joints—which reduces installation time
Another advantage of the PE material is that it is resistant to external influences. Our solution has a design life of at least 100 years.