Wooden living, Vienna, Austria
Holzwohnen Vienna
The "Holzwohnen Wien" project is an example of sustainable densification in urban areas: The Holzbau Mach office is replacing the existing building on its own company premises with a high-quality residential building with 21 rental apartments - and its own office on the ground floor of the building. The new building in the 14th district is being constructed in solid wood. With "Holzwohnen" the focus is on ecological living and a feel-good climate, accordingly Felix Mach, planner of the project and managing director of Mach Holzbau, also relies on energy-efficient surface temperature control, which also ensures special living comfort: It heats in winter and cools in summer. The builder also relies on quality for the drinking water installation.
Projektová fakta
Uponor participace
-
Surface temperature control with Uponor Tacker wet construction system
-
Hygienic drinking water installation on the floors
-
Convenient installation of the distribution and riser lines
- 1,400 m2 underfloor heating Tacker wet construction system
- Uni Pipe PLUScomposite pipe
- S-Press PLUSFittings up to dimension 32
- MLCPipes, press fitting system Uponor RS
CO2 in view
Wood as a building material makes green building much easier, it has a neutral CO2 balance compared to other building materials: One ton of CO2 is bound in every cubic meter of wood. With solid wood construction, i.e. building with multi-layer solid wood panels glued at right angles to one another, large quantities quickly accumulate - around 600 m³ of solid cross laminated timber were used for the new building. "Holzwohnen" thus stores 600 tons of CO2, which roughly corresponds to the pollutant emissions of ten cars over a period of 37 years.
"Throughout the planning, the focus was on building sustainably and enabling ecological living," explains Mach. Accordingly, geothermal energy was chosen as the energy source for heat generation in this project in combination with a heat pump. "This heating technology is particularly efficient when the temperature level only needs to be increased slightly, i.e. the flow temperature of the heating system is low," explains Mach. “That is the case with panel heating. This is one of the reasons why we decided to use Uponor surface temperature control for the entire 1,400 square meters."
Well tempered in every season
For the planner and builder, the "Holzwohnen Wien" project not only focused on ecological living, apartments with a feel-good climate should also be created. "The underfloor heating ensures even heat - there is no cold feet. The best prerequisites for feeling really good at home," emphasizes Mach. In summer, the system provides pleasant cooling in the same way. With the decision to use geothermal energy, the client has also created the basis for pleasant room temperatures on hot summer days: The comparatively cold earth temperature is then used for cooling.
"Simple" convinced the experts during assembly
When deciding on the Uponor Tacker wet construction system for underfloor heating, the ease of installation also played a major role. All components are precisely matched to each other, so the system can be installed quickly, easily and – thanks to the right tool – ergonomically. And all components are designed for maximum safety and reliable operation.
For the drinking water installation on the individual floors, the installation company Bernhardt Gebäudetechnik used Uni Pipe PLUS and the associated S-Press PLUS fittings up to dimension 32.Uni Pipe PLUS is characterized by the innovative SACP Technology (Seamless Aluminum Composite Pipe) - it is the world's first multi-layer composite pipe with a seamless extruded aluminum layer. The innovative tubes enable bending radii that are up to 40 percent tighter than conventional composite tubes, so that changes in direction through tube bends can be easily implemented during assembly. That means: Fewer fittings and less assembly time. S-Press PLUSFittings are particularly robust and, thanks to appropriate color coding, make assembly easier.
Thanks to the modular press fittings Uponor RS, the distribution and riser lines used made of composite pipe can also be installed particularly conveniently - thanks to pre-pressing on the workbench. On site, the pre-assembled composite pipe sections could then simply be inserted into the fittings and locked without tools. Stressful work with heavy pressing tools in tight corners or in an overhead position was therefore not necessary.
Projektové informace
Projektové informace
Partneři
Make wooden construction
www.mach-holzbau.at
www.massivholzbau.wien
Execution of building services:
Fa. Bernhardt Building Technology GmbH, Biedermannsdorf
Podobné projekty
Národní technická knihovna
Rekonstrukce rozvodů tepla a teplé vody s cirulací na sídlišti v Zákupech
Jinonický dvůr, 2. etapa
Avalon Bay
Tellico Village
Skyhouse
Episcopal Homes
Summerland Apartments
Aurora Micro Apartments
Fairway Village
Quail Hollow
Loring Park Tower
DeChantal apartments
Shanghai sheshan yard developed by Lujin company is a high-grade hardcover residential area with a total area of 42000 square meters, 540 apartments.
Shanghai sheshan yard developed by Lujin company is a high-grade hardcover residential area, which is located in Shanghai,songjiang district, with a total area of 42000 square meters, 540 apartments.
Uponor participates in construction of Maarjamõisa Medical Campus
Cost-effective and space-saving prefabricated module Reno Port ensures succesful renovation
Feeling comfortable and relaxed in loft apartments
The joint renovation project in Maunula – cost savings through co-operation
Underfloor cooling adds value to new construction
A tested and researched underfloor heating solution keeps footsteps in control
Decibel soil and waste system were installed in the new appartments in former prison Kakola.
Stylish rock home was renovated with practical viewpoint
Durability and quality are crucial in the award-winning wooden apartment block
A housing company Petreliuksenrinne
Sampo Ltd multistorey building renovation
The luxury flats by the Töölönlahti bay remain at the ideal temperature thanks to underfloor heating and cooling
The service flue solution speeded up the construction of a block of flats in Lahti
New apartment building
Apartment building Varsta Oy
Aleksanterinkatu 5 in Lahti will be completed with R2I blocks
LEO 250
Multi-family home
Next stop: comfort
Grand Tower
Multi-family homes
PankeBogen residential development in Bernau
New campus for the International School of Kuala Lumpur (ISKL)
Ewha Campus Complex
Ewha Womans University had planned the underground campus, which is a global trend for space creation, in order to solve the problem that the available space on the ground was insufficient despite the increase in the space demand in the campus, in accordance with the Ewha Womans University Development Plan in the 21st century.
Mapo Oil Storage facility, South Korea
The industrial heritage "Mapo Oil storage facility" converted into a comprehensive cultural park with Uponor Radiant Heating and Cooling system.
Residential building Legato
Harmony in the rhythm of the city.
YIT Green City is a city oasis in Purvciems district
Riverstone Residence
"Beržų Terasos" (Birch Terraces)
"Beržų Terasos" (Birch Terraces) - nature surrounded 10,600 m2 sized multi storey apartment buildings in Vilnius Antakalnis district.
De Vries van Heijst public garden student housing complex
Distribution system for a reference building in the center of Bratislava
Tap water system in Uppsala, Sweden with plastic manifolds and new pipe dimensions
Uponor Decibel suppresses sound from the waste water in Gothenburg
Heating and tap water solutions
Perfect for property owners
South Kilburn residential site
The Mercian Broad
Norman House Residential Development, Derby
To help address the housing shortage in Derby, an office block (Norman House) has been converted into 134apartments. As part of the conversion, electric heating, mains cold water distribution systems and hot water cylinders were installed in each room.
Omniturm Frankfurt
George Street
Sluseholmen
As a result, Uponor now offers a new, optimized and well structured, compact and easy to use prefab basic unit with flexible connectivity options for managing water and heating in varying types of housing.
From now on, Uponor provides the construction market with these prefab shaft units, primarily intended for modern floor building and terraced houses.
Brusaporto apartments
Edificio La Luz Residencial Toscana
A new standard of comfort in Burgos.
Can Domenge
Can Domenge Residential Complex (Mallorca)
Uponor Klett and Uponor Smatrix in the most sustainable promotion of Las Rozas
Residencial Escalonia I, II and III. Las Rozas (Madrid), Spain
Applewood Pointe
Pušų Terasos (Pine Terraces)
hi! Cañaveral
hi! Cañaveral es una promoción VPPB excepcional con Climatización Invisible por suelo radiante Uponor.
First high-rise residential building in Spain with Leed Gold certification
Living at Walkstrom, Erfurt
Allensbach, Dübelhölzle
Building area Dörnerbusch
Sustainable concept for heating and drinking water installation
Refurbishment of a prefabricated building
Modernization with Knauf and Uponor
Infinity Forest Residence
The key words are the basis of the philosophy for the construction of Infinity Forest Residence: practicality, efficiency, spaciousness, freedom and healthy living.