Fyld BIM-indkøbskurven fra produktkataloget

549 Resultater fundet
Sewage retention chanel
Kommunalt byggeri

Sewage retention chanel

The construction of an innovative retention sewage canal in Rzeszów in southern Poland was recently completed using Weholite piping and manholes.

Renovation of reinforced concrete sewer - relining method
Kommunalt byggeri

Renovation of reinforced concrete sewer - relining method

Renovation of 1.5-kilometer section of reinforced concrete sewer was carried out in 2013 in Chełm.

Collectors for sewage treatment plant
Kommunalt byggeri

Collectors for sewage treatment plant

Nineteen kilometres of polyethylene pipes with diameters of 1000 mm and 1400 mm connected the southern area of Warsaw with "Południe" sewage treatment plant and the Vistula.

Potable water tanks and fire water tank
Land- & skovbrug

Potable water tanks and fire water tank

Since 2013 a battery of Weho tanks has helped to provide drinking water for the guests of the East European Congress and Sports Centre Arłamów in southeast Poland.

Sewage pipelines to sewage treatment plant - HDD method
Kommunalt byggeri

Sewage pipelines to sewage treatment plant - HDD method

In 2007 in Szczecin, a series of record-breaking in the European scale number of crossings of a high dimension PEHD pipeline under a water obstacle made with a horizontal drilling method was completed in Szczecin.

Retention systems for the S3 expressway
Transportanlæg

Retention systems for the S3 expressway

As part of the project “Construction of the second roadway of the S3 expressway along the Sulechów – Nowa Sól section – the second and third section” Uponor Infra provided pipes, sewer manholes and detention tanks.  
 
A smart retention system for an anti-flooding solution
Kommunalt byggeri

A smart retention system for an anti-flooding solution

September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.

 

A raw water system for the new power unit
Industri

A raw water system for the new power unit

To ensure failure-free operation of a raw water system, a polyethylene-made pipeline (PEHD) with a length of approximately 9 km was installed (in mining damage conditions), of which 3 km uses the trenchless technique – relining.

An optimal solution for a Polish power plant
Industri

An optimal solution for a Polish power plant

WehoSlurry polyethylene pipes with an additional, internal slurry layer, provided an optimum solution for hydrotransporting ash to the Bełchatów Power Plant’s disposal site.

Fighting against an ecological disaster in a world-record time
Kommunalt byggeri

Fighting against an ecological disaster in a world-record time

Rapid action was critical when a sewage collector broke in Warsaw, Poland, causing a massive waste spill into the Vistula River. Uponor Infra’s crew worked 24 hours a day in order to stop the pollution of the river. A temporary pipeline was produced, delivered and connected in just eight days.

Johnson Residence
Enfamiliehus

Johnson Residence

Justin Johnson and his wife, Jessica, had been planning their “forever home” for five years when they decided in late 2019 that they were finally ready to begin construction...

Sustainable sewer pipeline with Ultra Rib 2 Blue
Kommunalt byggeri

Sustainable sewer pipeline with Ultra Rib 2 Blue

The Ultra Rib 2 Blue pipes were first launched in Sweden – this year, the pipes have already been installed at several locations. In Finland, a pilot installation was carried out in early autumn in the Jalkaranta district of Lahti, a few kilometres from the city centre.