A smart retention system for an anti-flooding solution
September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.
A raw water system for the new power unit
To ensure failure-free operation of a raw water system, a polyethylene-made pipeline (PEHD) with a length of approximately 9 km was installed (in mining damage conditions), of which 3 km uses the trenchless technique – relining.
An optimal solution for a Polish power plant
WehoSlurry polyethylene pipes with an additional, internal slurry layer, provided an optimum solution for hydrotransporting ash to the Bełchatów Power Plant’s disposal site.
Fighting against an ecological disaster in a world-record time
Rapid action was critical when a sewage collector broke in Warsaw, Poland, causing a massive waste spill into the Vistula River. Uponor Infra’s crew worked 24 hours a day in order to stop the pollution of the river. A temporary pipeline was produced, delivered and connected in just eight days.
Johnson Residence
Justin Johnson and his wife, Jessica, had been planning their “forever home” for five years when they decided in late 2019 that they were finally ready to begin construction...
Sustainable sewer pipeline with Ultra Rib 2 Blue
The Ultra Rib 2 Blue pipes were first launched in Sweden – this year, the pipes have already been installed at several locations. In Finland, a pilot installation was carried out in early autumn in the Jalkaranta district of Lahti, a few kilometres from the city centre.
Weholite yields savings and smoother implementation
New dry land fish farm which will produce 3,200 tonnes of rainbow trout annually is being build in Eckerö in the Åland Islands. Uponor Infra has provided design assistance and delivers the pipes and is responsible for their installation and welding.
Water treatment plant
Water company Ylä-Savon Vesi Oy needed a solution to improve the water quality in water supply process. The solution was an aeration tank made of Weholite.
Urban runoff under control – quickly and easily
Nastola's plans initially featured a pipeline but this was replaced with a runoff tunnel. Thanks to the quick and easy installation, the time originally set aside for the project could be halved.