Füllen Sie den BIM Warenkorb aus dem Produktkatalog
Unsere Kundenservice-E-Mail-Adresse hat sich geändert. - Überblick

Referenzübersicht

395 Ergebnisse
Industriegebäude

In place in a couple of days

The waste water channel for the pulp line of the mill, which was renovated in 2017, was commissioned in the 1960s. Now there were fear that it would collapse. The new solution was Weholite.

Bürogebäude

HAMK's zero-energy hall uses energy piles

Construction of Finland's first virtually zero-energy hall was completed in May 2015. The hall was built for the Thin Sheet Centre research unit of the Häme University of Applied Sciences (HAMK) and it draws its energy primarily from energy piles and solar panels.

Einfamilienhaus

Getting rid of indoor radon

Uponor's radon system was installed in a detached house in Ilomantsi, completed in 1987. Previously, the radon values in the house were 1,188 becquerels. After installing the system, the radon values dropped to 83.

Mehrfamilienhaus

Feeling comfortable and relaxed in loft apartments

The old factory building gets a new life as loft apartment building. Skanska Oy renovated the building into 23 different size and type of apartments.

Mehrfamilienhaus

Durability and quality are crucial in the award-winning wooden apartment block

All solutions in the Puukuokka block, which was completed in Jyväskylä, have strived for sustainability, quality and coziness. Living comfort and energy efficiency are also ensured by radiant underfloor heating system installed in each of the block’s 186 homes.

Bürogebäude

Day-care centre to be built with energy piles

As requested by the City of Vantaa, the Vaaralanpuisto day-care centre has been planned based on the "nearly 0 energy days" concept. Construction work for the day-care centre began in late summer 2016, and the project will be completed in July 2017. Project costs are estimated at EUR 5.4 million, and the day-care centre will accommodate about 130 children. Among the various energy production options available for the site, the City of Vantaa chose the energy pile and solar thermal collector system jointly developed by Uponor and Ruukki.

Mehrfamilienhaus

Cost-effective and space-saving prefabricated module Reno Port ensures succesful renovation

Housing company Hottonia located in Olari, Espoo, had a successful renovation that was finished in September 2018. Everything went according to time schedule and the result was excellent. The renovation was carried out with prefabricated solution Reno Port cassette.

Sportanlagen

Boost to energy efficiency

PowerPark's indoor karting hall became a functional and comfortable multipurpose hall when concrete replaced the asphalt floor and an energy-efficient and cost-effective Uponor Quattro floor heating system was installed underneath.

Mehrfamilienhaus

Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

An 8-storey apartment is rising in a former bank district in Lahti. The target will contain 265 apartments and is designed by A1 Arkkitehdit Oy and will be built by Nuorisosäätiö. There are 256 rental apartments reserved for students on floors 2-7. Uponor R2I blocks will be installed in all of the student-apartments in connection with bathroom and kitchen elements. Aleksi 5 is the first new destination in which R2I blocks are being delivered and in which sound-absorbing Decibel drains are used.

Mehrfamilienhaus

A tested and researched underfloor heating solution keeps footsteps in control

Jyväskylän Holvi is a new apartment building with 43 apartments right in the heart of Jyväskylä. Uponor Tacker underfloor heating system and Uponor Smatrix Base room control system were installed in each apartment.

Uponor Referenzmagazin

Uponor Referenzmagazin

Smart. Connected. Innovation. Innovative Referenzen rund um die Welt, gesammelt in einem Dokument! Stöbern Sie jetzt durch die Uponor Referenzen!

PDF 5 MB