Füllen Sie den BIM Warenkorb aus dem Produktkatalog

Referenzübersicht

77 Ergebnisse
Bürogebäude

Progenergia Thermotechnical Engineering Office

As part of the extension work on the premises in Caronno Pertusella (Varese), Studio Termotecnico Progenergia opted for the Uponor Tecto radiant heating system to heat and cool the events hall.

Bürogebäude

Greenspace PCTG

Maximaler Komfort für ein Netto-Null-Bürogebäude

Bürogebäude

The Leon-Service Plus Office

Uponor systems were selected to provide water supply, heating, and cooling for the office, making it possible to eliminate radiator heating in the building.

Bürogebäude

Ericusspitze Spiegelhaus

Der neue Konzernhauptsitz der Spiegel-Gruppe liegt auf der Ericusspitze. Die Betonkernaktivierung Contec von Uponor sorgt für angenehme Temperierung.

Bürogebäude

Edificio de oficias en calle Tutor

The building located at Calle Tutor 16 (Madrid), owned by Arquia Inmuebles, has undergone a complete renovation and modernization, being partially demolished with the façade stabilized. A project designed by Tuñón y Albornoz Arquitectos and executed by SANJOSE Constructora, where the integration of Uponor's Invisible Air Conditioning in the Matrics raised technical floor developed by company Subway Systems.

Bürogebäude

Uponor System Protects First Responders

Customer Challenge
Deliver an efficient, sustainable snow and ice melting solution that keeps pace with a demanding construction schedule.
 
Bürogebäude

Immeuble Delta Green

La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.

Bürogebäude

Nathan, Zevenaar

The technical heart of Nathan Zevenaar

Bürogebäude

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.

Bürogebäude

Standard Bank

Uponor PE-Xa pipe used for refurbishment of chilled water pipelines in the head office of South Africa's Standard Bank located in Johannesburg.

Uponor Referenzmagazin

Uponor Referenzmagazin

Smart. Connected. Innovation. Innovative Referenzen rund um die Welt, gesammelt in einem Dokument! Stöbern Sie jetzt durch die Uponor Referenzen!

PDF 5 MB