Case study

Radisson Blu, Bloomington, MN, USA

Miles of pipe, weeks of labor savings

From south of the Twin Cities, you can see the Radisson Blu Mall of America® on the horizon. This stunning, 570,000-square-foot, 13-story hotel in Bloomington, Minn., is the first hotel to be connected to the Mall of America — the second largest mall in the world.

Since its groundbreaking in May 2011, the structure has accumulated more than 1.2 million pounds of structural steel and 24,000 cubic yards of concrete in addition to 23,000 feet (nearly 4½ miles) of Uponor AquaPEX® crosslinked polyethylene (PEX-a) pipe for the plumbing system.

Project facts

Bloomington, MN, USA
Hospitality
Completion: 2012

Uponor Involvement

Project highlights

  • LEED® Certified
  • 570,000 square feet
  • 13 stories
  • Uponor PEX in 11 occupied floors (3rd-13th floors)
  • 50 units per floor

Products Used

  • 23,637 ft. of ½"-2" Uponor AquaPEX®
  • ½"-2" ProPEX® fittings
  • Engineered polymer (EP) fittings, multi-port tees
  • Lead-free brass drop ear elbows and copper adapters

Using large-dimension Uponor PEX to prefab risers leads to greater installation efficiencies

Dean Corrigan of FourMation Sales in Rogers, Minn., was the first to bring the concept of Uponor PEX for plumbing to the massive structure. In the winter of 2011, Corrigan was approached by Joe Williams of Ferguson in Roseville, Minn., about the grand hotel project and was eager to jump in with both feet.

“Joe put me in touch with the project manager and I pitched Uponor PEX for both the risers and the distribution piping,” says Corrigan.

Corrigan and his counterpart at FourMation, Kevin Barta, started working on the details of the project immediately and found that the project required having the product files in the Building-Data/TSI database.

“I immediately brought in Mike Rivers and Chris Bertsch of Uponor and literally within two weeks, Uponor had their product into the Building-Data/TSI database,” he says.

When the product landed at the contractor’s shop, Corrigan was there to help show the contractors how to make 2" ProPEX connections to pre-fab the risers.

Bob Wolf, project manager on the Radisson Blu Mall of America project with Metropolitan Mechanical Contractors (MMC) of Eden Prairie, Minn., was on the project from the beginning and found the plumbing installation with Uponor’s PEX to be very efficient with labor savings.

“I started installing PEX in small retail applications several years ago and I really like how the flexible tubing makes it faster to install because we don’t need as many fittings,” he says. “The Radisson Blu Mall of America project has been my first experience using large-dimension PEX in riser applications and I really like the additional labor savings it provides.”

According to Wolf, the time savings using PEX for the risers and the unit piping saved his crews about two to three days per floor. On a 13-story project with 50 units per floor, that adds up to almost a month of installation time savings!

“We started out with a three-man crew which took three days to complete each floor,” he says. “Installing copper would have been double that time.”

MMC prefabbed the risers and installed them during the cast iron installation. Then, the crew went in each floor and hooked up the unit piping for all 50 units on each of the 11 occupied floors (3rd-13th floors).

“When you’re talking about 50 units on one floor, you can whip through it pretty fast with PEX and the multi-port tees,” says Chris Dent, assistant project manager with MMC. “The multi-port tees also help save time by reducing the number of fittings required.”

Angie Shingledecker, a journeyman plumber with MMC, says she prefers the ProPEX expansion system for fittings compared to others she has used in the past. “I’ve been installing PEX for about eight years and I don’t like crimp fittings,” she says. “I like the ProPEX expansion fittings much better.”

The Radisson Blu Mall of America project has been my first experience using large-dimension PEX in riser applications and I really like the additional labor savings it provides.

Radisson Blu

Uponor PEX plumbing installation at the Radisson Blu hotel in Minneapolis, MN featuring multiport tee

Project information

Project information

Country
USA
Completion
2012
Project Type
New building
Building Type
Hospitality

Similar projects

Cavalier Hotel

Cavalier Hotel

See how a century-old luxury hotel receives a major renovation that includes an Uponor PEX plumbing system...
Zugspitz Resort, Ehrenwald

Zugspitz Resort, Ehrenwald

Das Zugspitz Resort am Fuß des Wettersteingebirges setzt in den Bereichen Fußbodenheizung und Kühldecke auf die Produkte und das Know-how von Uponor
Hotel Bellevue

Hotel Bellevue

Uponor has delivered a solution for underfloor heating and cooling to Superior City Hotel Bellevue ****. The hotel provides spacious and modern rooms and suites which meet all of the guests needs. One of them is a comfortable room temperature throughout the year. 

Villages Nature (R) Paris

Villages Nature (R) Paris

Villages Nature (R) Paris is a new european vacation destination and a major innovation in family-friendly sustainable tourisme, designed entirely around the quest for harmony between Man and Nature.

Heiligenhafen Pier 2

Heiligenhafen Pier 2

Uponor Ecoflex Supra Plus provides frost-free drinking water and waste water transportation at Heiligenhafen Pier all year round.
aquaTurm Radolfzell

aquaTurm Radolfzell

The former water tower in Radolfzell was converted into the zero-energy design hotel aquaTurm, with the Klett and Smatrix Base solutions from Upanor being used for heating and cooling.

Panorama 2962 Zugspitze

Panorama 2962 Zugspitze

At nearly 3,000 meters above sea level, Uponor ensures cosy temperatures and clean drinking water in Germany's highest mountaintop restaurant.
Al-Kalaa Hotel

Al-Kalaa Hotel

Uponor provides the world's largest hotel and shopping mall complex in Mecca, Saudi Arabia, with Uponor mulit layer composite pipe systems for the bathrooms.
Hotel Mediterraneo - Sauna

Hotel Mediterraneo - Sauna

Located in Amantea, a lovely village on the coast od Calabria, founded in the 600s, the Hotel offers modern rooms and all the best comforts.
Leonardo Hotel, Bristol, UK

Leonardo Hotel, Bristol, UK

Uponor provides water solutions for Leonardo Hotels’ new 200-bed Bristol resort

The Jurys Inn Group has utilised a variety of high-end heating and plumbing solutions from Uponor, the total solutions provider of systems for the safe transportation of water around a building, for a new 200-bed, Leonardo Hotels branded facility in the heart of Bristol

Located in Temple Way at the gateway to Bristol’s Temple Quarter business district, close to the main train station and within walking distance of the city centre, the new hotel will become a popular destination for tourists and business travellers alike when it opens in early 2021.

To ensure that the hotel’s users would be provided with a hygienic water supply and a highly reliable heating system, the project’s M&E contractor Totus Engineering worked closely with Uponor on the building’s plumbing and water network.
H-Tower in Kiev

H-Tower in Kiev

H-Tower, the luxury residential complex in the centre of Kiev, Ukraine is scheduled to open for business during spring 2012.
Wilshire Grand

Wilshire Grand

An Uponor radiant cooling system keeps the integrity of the world’s largest concrete pour for the tallest building west of the...
Hospital Østfold Kalnes

Hospital Østfold Kalnes

Kalnes, Sarpsborg, 27.02.2014

Uponor is proud to deliver flexible tapwatersystem, underfloor heating and snow and ice melting system to the new hospital Kalnes.
Frank Myhrer, Sales Manager Østfold

Read more about the project on this site Byggeindustrien.no