Uponor Prefabricated PEX Water Risers
Increase Labor Productivity and Improve Quality Control
Offsite Construction Helps Projects Align with Budgets and Schedules

Maximum Quality Assurance
Trained in-house professionals build Uponor Prefabricated PEX Water Risers using established quality control procedures. The prefabrication team are experts in tool usage, visual material inspections, tolerance checks, and batch inspections of finished goods.
- Boosts productivity by reducing field connections up to 75%
- Simplifies installation and minimizes jobsite material handling
- Mitigates risk with improved installation quality and consistency
- Increases sustainability and profitability by reducing jobsite waste with precut piping and packaging disposal
Prefabricated PEX Water Risers Drive Installation Efficiencies for Hotel Project
The Gaylord Pacific Resort and Convention Center in Chula Vista, CA, needed a streamlined HVAC piping solution that promoted timely installation. On past projects, the contractor encountered efficiency challenges due to the number of riser connections. By leveraging Uponor Prefabrication Services to assemble 4,867 risers offsite and transport them to the resort for installation, the contractor saved significant time and labor.
If you can't see the content below, you most likely didn't accept our Marketing cookies. You can change the cookie settings any time by clicking the tab in the footer.


