Llenar la cesta de la compra BIM desde el catálogo de productosLlenar la cesta de la compra BIM desde el catálogo de productos

577 Resultados encontrados
Loft Apartments Praha Bubeneč
Vivienda en altura

Loft Apartments Praha Bubeneč

Thermally Activated Building Systems (TABS) as Uponor Contec.

Concrete core activation ČSOB Prague
Edificio de oficinas

Concrete core activation ČSOB Prague

Heating and cooling using in the office building.

1. FC Brno, Football stadium
Centros deportivos (interior/exterior)

1. FC Brno, Football stadium

Optimal conditions all year round - without ice and snow.

Gaylord Pacific Resort & Convention Center
Hoteles

Gaylord Pacific Resort & Convention Center

An 18-story resort and convention center in Chula Vista, CA, needed a streamlined HVAC piping solution that promoted timely installation. Control Air Enterprises selected a prefabricated Uponor PEX piping solution for the chilled water and hot-water risers to the guest room fan coils. Uponor Prefabrication Services added simplicity for additional labor savings on the project.
 
Allo Alcantara Lisbon Offices
Edificio de oficinas

Allo Alcantara Lisbon Offices

The new business center in the Portuguese capital for sustainability, technology, and people's well-being. 

Trident Park Malta TABS installation for sustainable cooling
Edificio de oficinas

Trident Park Malta TABS installation for sustainable cooling

TABS installation in the maritime Mediterranean climate of Malta at Trident Park provides energy-efficient comfort indoor climate. 

Uponor Iberia headquarters and logistics hub - Móstoles Madrid
Edificio de oficinas

Uponor Iberia headquarters and logistics hub - Móstoles Madrid

This building complex is an exceptional reference on how sustainability and energy efficiency can be included into modern commercial and industrial building project

AquaDjurs takes the next step in efficient stormwater management
Edificio público

AquaDjurs takes the next step in efficient stormwater management

The water and wastewater utility AquaDjurs is introducing a new solution to ensure effective treatment of stormwater. The solution is expected to significantly reduce installation and operational costs while improving the treatment performance of runoff.
 
 
Drake Plastics Manufacturing Facility
Edificio industrial

Drake Plastics Manufacturing Facility

An existing structure with plans to become an industrial manufacturing facility needed a reliable plumbing solution that would integrate with the building’s current system and be fast to install. Graves Mechanical chose Uponor hybrid products with innovative, one-step transitions for faster, easier installs along with the benefit of onsite support.

 Waterline
Vivienda en altura

Waterline

A mixed-use, commercial and residential supertall skyscraper in Austin – the tallest building in Texas – needed a sustainable heating and cooling solution for a hotel lobby with soaring ceilings as well as a durable, corrosion-resistant domestic water system that could last for decades.
 
22.5-meter long fire water tanks at Kollen Kindergarten
Escuelas / Universidades

22.5-meter long fire water tanks at Kollen Kindergarten

Uponor Infra delivered two 2200 mm Weholite fire water tanks to Kollen Nature Kindergarten.

Reservoir tank for unordinary village of Tuuri
Edificio público

Reservoir tank for unordinary village of Tuuri

In an ordinary village with less than 1,000 residents, a reservoir tank would normally be unnecessary, but Tuuri in Southern Ostrobothnia in Western Finland is not an ordinary village. The village tourist attraction draws visitors up to six million visitors annually. This needs special solution for potable water delivery.