Menu
Uponor Oficinas Centrales
Avda. Leonardo da Vinci 15-17-19
Parque Empresarial La Carpetania 28906 Getafe (Madrid)
Caso de estudio

National Technical Library, Praha 6, Czech Republic

National Technical Library

Datos del proyecto

Praha 6, Czech Republic
Vivienda en altura
Climatización Invisible
Finalización: 2009

Involucración Uponor

14000

The unique technical solution

CONTEC - Concrete core activation BKT

When building NTL Prague became MEP engineering solution from design offices PBA Prague unique not only in the scale of the Czech Republic. BKT system installed for the first time in two-way prestressed concrete, which place a extreme emphasis on the coordination of the construction, because all the pipes to be laid by hand, not a standard modular design. Total installed without a few 50 km pipeline to the total area exceeding 10,000 square meters.


NTL - Underfloor Heating


Equally unique technical solution for the construction has underfloor heating, which was first installed in the Czech Republic with a special layer of asphalt walkway. Due to the thermal insulation structure has been supplied for floor heating system must be chosen tacker system fixation.
 

National Technical Library

0001889

Información del proyecto

Información del proyecto

Dirección
Technická 6
País
Czech Republic
Finalización
2009
Tipo de proyecto
Obra nueva
Tipo de edificio
Vivienda en altura

Proyectos similares

hi! Cañaveral

hi! Cañaveral

hi! Cañaveral es una promoción VPPB excepcional con Climatización Invisible por suelo radiante Uponor.

AEDAS Homes Qian, Majadahonda

AEDAS Homes Qian, Majadahonda

Qian es una promoción de obra nueva que AEDAS Homes ofrece en Majadahonda. Un proyecto de ecoliving situado en una parcela de 32.500 m² en el que se ha desarrollado una propuesta arquitectónica de 210 viviendas de primer nivel diseñadas por el Estudio de Arquitectura Lamela.
Skyhouse

Skyhouse

Witness the premium customer experience during this hands-on support as this Austin Texas apartment complex converts...
Uponor participates in construction of Maarjamõisa Medical Campus

Uponor participates in construction of Maarjamõisa Medical Campus

2022 sees the completion of Maarjamõisa Medical Campus managed by Tartu University Hospital. The largest centre of its kind in Estonia, the Campus concentrates active medical care in one compact system. Uponor Estonia is participating as advisor, and as supplier of potable and heating water systems in the second construction phase currently under way.
Underfloor cooling adds value to new construction

Underfloor cooling adds value to new construction

Postitalo, the former post office building in downtown Tampere, got a new look in 2017 when it was renovated into new commercial premises and a block of flats was built on top. The heat distribution system of choice was Uponor's underfloor heating and cooling system, which was installed in all flats.
Stylish rock home was renovated with practical viewpoint

Stylish rock home was renovated with practical viewpoint

Sipe Santapukki's appartment in the small multi story building that was built in 1930's was renovated thoroughly. Practicality, intimacy and energy efficient were the starting point for the renovation. Uponor's underfloor heating system and Drain gully system was chosen for the renovation.
A housing company Petreliuksenrinne

A housing company Petreliuksenrinne

The Petreliuksenrinne housing company controls a group of residential buildings that were constructed in 1969. The company manages 124 flats, which were subject to an overhaul of their water supply and sewerage systems. The floor drains, bathrooms, electricity distribution and antenna systems were also overhauled.
New apartment building

New apartment building

Two blocks of rental flats were completed at Sokeritehtaantie 15 in Kirkonummi in summer 2015. The new sites were realised with Uponor's R2i elements.
Apartment building Varsta Oy

Apartment building Varsta Oy

Line renovations in blocks of flats can be conducted significantly faster and more easily. The Uponor R2I cassette makes for a problem-free renovation. Thanks to advanced prefabrication, the project period is shorter and the risks are lower. The As Oy Varsta company in Turku is the first R2I pilot site. The site will be completed to an expedited schedule.
Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

An 8-storey apartment is rising in a former bank district in Lahti. The target will contain 265 apartments and is designed by A1 Arkkitehdit Oy and will be built by Nuorisosäätiö. There are 256 rental apartments reserved for students on floors 2-7. Uponor R2I blocks will be installed in all of the student-apartments in connection with bathroom and kitchen elements. Aleksi 5 is the first new destination in which R2I blocks are being delivered and in which sound-absorbing Decibel drains are used.
LEO 250

LEO 250

"LEO 250" brings together sophisticated architecture and superb energy efficiency. Construction time was speed up due to the use of an Uponor systems.
Next stop: comfort

Next stop: comfort

For the conversion of the historic building, the planners relied on decentralized apartment stations from KaMo and floor heating and cooling from Uponor.
Sampo Ltd multistorey building renovation

Sampo Ltd multistorey building renovation

Sampo plc has chosen the Uponor technical wall as the solution for the renovation of the damp areas in several blocks of rental flats. The project is expected to run from March 2015 to February 2017. There are a total of 150 flats at the sites.
Ewha Campus Complex

Ewha Campus Complex

Ewha Womans University had planned the underground campus, which is a global trend for space creation, in order to solve the problem that the available space on the ground was insufficient despite the increase in the space demand in the campus, in accordance with the Ewha Womans University Development Plan in the 21st century.

Avalon Bay

Avalon Bay

Six new apartment buildings, originally designed for CPVC, become a PEX project and include an Uponor Logic...
Tellico Village

Tellico Village

A recurring problem with pinhole-sized pipe leaks in copper required plumbing repair and repiping. Learn why the...
Aurora Micro Apartments

Aurora Micro Apartments

Learn why contractors chose to install an Uponor AquaPEX® plumbing system for these apartments based on product reliability and ease of installation...
Quail Hollow

Quail Hollow

See how a condominium complex replaces their leaking steel-pipe district energy system with Uponor’s Ecoflex pre-...
Multi-family homes

Multi-family homes

Heat interface units provide a high level of warmth and comfort as well as optimum drinking water hygiene in three multi-family homes.
Norman House Residential Development, Derby

Norman House Residential Development, Derby

To help address the housing shortage in Derby, an office block (Norman House) has been converted into 134apartments. As part of the conversion, electric heating, mains cold water distribution systems and hot water cylinders were installed in each room.

Episcopal Homes

Episcopal Homes

Uponor PEX saves time and labor on this multi-resident Midwest Senior Living home job in Burnsville, Minnesota...
George Street

George Street

Uponor products set the standard for off-site construction projects by providing a quick to install, cost-effective and high performance plumbing system for the safe delivery of domestic water services for the world’s tallest modular apartment building.
Sluseholmen

Sluseholmen

The Uponor project ’Sluseholmen’ has served as inspiration for developing a brand new and advantageous plumbing solution.
As a result, Uponor now offers a new, optimized and well structured, compact and easy to use prefab basic unit with flexible connectivity options for managing water and heating in varying types of housing.
From now on, Uponor provides the construction market with these prefab shaft units, primarily intended for modern floor building and terraced houses.
 
Brusaporto apartments

Brusaporto apartments

Two apartment buildings in Brusaporto, Italy, offer a high level of living comfort after renovation – also thanks to the Uponor Minitec underfloor heating system. With its low installation height, it is ideally suited for retrofitting.
Refurbishment of a prefabricated building

Refurbishment of a prefabricated building

During the renovation of a prefabricated building in Zwickau, Robinienweg, a low installation height stood in contrast to the desire for more energy efficiency and comfort through underfloor heating. The solution: a slimline combination of Minitec underfloor heating from Uponor and N 440 leveling screed from Knauf.
Applewood Pointe

Applewood Pointe

Developed by Uponor, this new solution takes the guesswork and freelancing out of piping installations. Each kit, which includes all the needed ProPEX® fittings, adapters, valves, and rings, is delivered to the job site — one kit per room or apartment — along with a material list and an isometric layout for the installer to follow, helping to minimize mistakes and maximize efficiency.
Infinity Forest Residence

Infinity Forest Residence

Accessible and surrounded by nature, the site is surrounded by fresh mountain air, generous sun, surrounded by rich forest and park vegetation.
 The key words are the basis of the philosophy for the construction of Infinity Forest Residence: practicality, efficiency, spaciousness, freedom and healthy living.