Caso de estudio

De hotel histórico a apartamentos de lujo con Uponor Combi Port B 1000 , Burgos, Spain

Antiguo Hotel España (Burgos)

El edificio, que albergaba el antiguo Hotel España, está dentro del Plan Especial de Protección del Centro Histórico de la ciudad de Burgos. Su transformación ha respetado la fachada y cumple las normativas más exigentes, tanto en parámetros de calidad como de eficiencia energética. El nuevo inmueble acoge ahora 16 viviendas de lujo tras una fachada que ha rejuvenecido hasta recuperar la estética que tuvo en 1938.

El proyecto ha sido liderado por el estudio MBG Ingeniería Y Arquitectura y la instaladora de las soluciones de Uponor ha sido CIMESA: Climatización Invisible por suelo radiante y distribución de ACS a través de la estación Uponor Combi Port B 1000, regulación inalámbrica de temperatura a través de Smatrix Wave Pulse, Fontanería Sistema Q&E y autofijación Uponor Klett.
 

Datos del proyecto

Burgos, Spain
Vivienda en altura
Superficie: 1.620,00 m2 Calefactados
Climatización Invisible, Control engineering, Sistema PEX-a
Finalización: 2021
Número de pisos: 16 Viviendas

Involucración Uponor

Uponor Klett Autofijación NEOROL G 25-2mm: 1.620 m2
Uponor Klett comfort pipe PLUS Autofijación 16x2.0: 11.360 ml
Fontanería Sistema Q&E, Tubería de polietileno reticulado (PEX-a), Accesorios Q&E
Estación producción ACS y Calefacción Uponor Combi Port B1000 UFH: 16 Unidades
Unidades Comfort Port Premontadas Kamo: 16 Unidades
Regulación Inalámbrica Smatrix Wave Pulse, modelo X-265,comunicación bidireccional y actuadores electrotérmicos (24 V). Módulo de ampliación M-262
Uponor Smatrix Wave termostato digital Prog. + HR T-168: 61 Unidades
Climatización Invisible. Q&E, Combi Port B 1000, Regulación Inalámbrica Smatrix Wave Pulse y Autofijación Uponor Klett

Un proyecto complicado y diferencial a nivel arquitectónico en el que las instalaciones han sido clave para obtener la calificación energética A. “Desde un principio el objetivo era obtener la calificación energética más alta, y se ha conseguido a partir de unas instalaciones de gran rendimiento que además favorecen ampliamente el confort de los propietarios”, afirma Eduardo Esteban Rodriguez, Director de Castellana de Instalaciones Mecanicas (CIMESA). Esta compañía inició su actividad en la década de los años 80 y ha dedicado más de cuarenta años al estudio, ejecución y mantenimiento de instalaciones industriales, domésticas, colectivas e individuales desde la innovación y la calidad. 

Buscamos las mejores opciones para realizar instalaciones eficientes, innovadoras y respetuosas con el medio ambiente. Para este proyecto diseñamos todas las instalaciones del edificio desde la sala de calderas  al sistema de aerotermia o la fontanería, y en base a lo que nos aportaba Uponor no dudamos en contar con ellos”, comenta Eduardo Esteban.

Imagen que contiene interior, tabla, cuarto, hecho de madera

Descripción generada automáticamente

El confort entendido como un todo, en lo que se ve y también en lo que solo se siente 

Quizá una de las grandes diferenciaciones del proyecto son las 16 estaciones de Uponor Combi Port B 1000 ubicadas en cada una de las viviendas. Según Eduardo Esteban, “este sistema permite unificar e individualizar la calefacción y la refrigeración y la distribución de ACS, con todos los beneficios de un sistema colectivo. Cada uno de los propietarios tienen la posibilidad de utilizar la energía como necesite, con el añadido de contar con la mayor garantía y el mejor servicio técnico”. 

La estación de intercambio térmico suministra a una unidad residencial agua caliente y calefacción. El agua potable se calienta según se requiera mediante un intercambiador de placas de acero inoxidable, utilizando los principios de contraflujo. La energía se suministra calentando agua con una temperatura de flujo de al menos 55ºC a través de la línea de suministro de agua caliente. La temperatura del agua potable es controlada por una válvula de control proporcional. La válvula PM prioriza el uso de ACS, derivando el paso de la energía del primario al intercambiador para la producción de ACS. Al finalizar la demanda de ACS, se corta el flujo de energía al intercambiador, mejorando el rendimiento energético.

Ajuste individual de la temperatura de confort

Otra singularidad que se suma a la experiencia única de vivir en estas viviendas es la solución de regulación y control inalámbrica para la Climatización Invisible, “es un proyecto que pone al propietario en el centro de todas las decisiones, como demuestra la elección de este sistema que permite controlar y decidir qué temperatura quiere que haya en su vivienda desde cualquier lugar y en cualquier momento del año, independientemente de la temperatura exterior”, concluye Eduardo Esteban. 

Un letrero azul con letras blancas en un edificio

Descripción generada automáticamente con confianza media

El sistema de control para suelo radiante de Uponor ofrece la posibilidad de crear zonas de confort ambiental según las preferencias individuales y controlar de manera remota la instalación (calefacción) mediante la aplicación Smatrix Wave Pulse.

El tándem CIMESA y Uponor, ha colaborado en el diseño, ejecución y la puesta en marcha de las soluciones de la compañía en este proyecto.

La experiencia de la instalación de la estación Uponor Combi Port B 1000 ha sido muy grata, nos ha permitido simplificar el proceso y la mano de obra ofreciendo al propietario el mayor rendimiento posible. Así, las ventajas de trabajar con estos sistemas llegan a cada una de las partes”. Eduardo Esteban Rodriguez, Director de Castellana de Instalaciones Mecanicas (CIMESA).

Información del proyecto

Información del proyecto

Dirección
Paseo del Espolón nº32. Burgos
País
Spain
Finalización
2021
Tipo de proyecto
Reforma
Tipo de edificio
Vivienda en altura
Soluciones
Q&E, Uponor Smatrix Wave Pulse, Uponor Smatrix Wave PLUS, Smatrix Wave, Aqua Pipe

Colaboradores

Colaboradores
Redactor y dirección de obra: MBG Ingeniería y Arquitectura S.L.
Arquitecto: D. Ignacio Camarero Julian
Arquitecto Técnico: D. Jose Manuel Mendez Pozo
Ingeniería: Castellana de Instalaciones Mecánicas S.L. (CIMESA)
Instaladora: Castellana de Instalaciones Mecánicas S.L. (CIMESA)
Promotor: S4 Camara Prima S.L.
Constructor: ParqueNorte Infraestructuras S.L.U.

Proyectos similares

hi! Cañaveral

hi! Cañaveral

hi! Cañaveral es una promoción VPPB excepcional con Climatización Invisible por suelo radiante Uponor.

AEDAS Homes Qian, Majadahonda

AEDAS Homes Qian, Majadahonda

Qian es una promoción de obra nueva que AEDAS Homes ofrece en Majadahonda. Un proyecto de ecoliving situado en una parcela de 32.500 m² en el que se ha desarrollado una propuesta arquitectónica de 210 viviendas de primer nivel diseñadas por el Estudio de Arquitectura Lamela.
Skyhouse

Skyhouse

Witness the premium customer experience during this hands-on support as this Austin Texas apartment complex converts...
Uponor participates in construction of Maarjamõisa Medical Campus

Uponor participates in construction of Maarjamõisa Medical Campus

2022 sees the completion of Maarjamõisa Medical Campus managed by Tartu University Hospital. The largest centre of its kind in Estonia, the Campus concentrates active medical care in one compact system. Uponor Estonia is participating as advisor, and as supplier of potable and heating water systems in the second construction phase currently under way.
Underfloor cooling adds value to new construction

Underfloor cooling adds value to new construction

Postitalo, the former post office building in downtown Tampere, got a new look in 2017 when it was renovated into new commercial premises and a block of flats was built on top. The heat distribution system of choice was Uponor's underfloor heating and cooling system, which was installed in all flats.
Stylish rock home was renovated with practical viewpoint

Stylish rock home was renovated with practical viewpoint

Sipe Santapukki's appartment in the small multi story building that was built in 1930's was renovated thoroughly. Practicality, intimacy and energy efficient were the starting point for the renovation. Uponor's underfloor heating system and Drain gully system was chosen for the renovation.
A housing company Petreliuksenrinne

A housing company Petreliuksenrinne

The Petreliuksenrinne housing company controls a group of residential buildings that were constructed in 1969. The company manages 124 flats, which were subject to an overhaul of their water supply and sewerage systems. The floor drains, bathrooms, electricity distribution and antenna systems were also overhauled.
New apartment building

New apartment building

Two blocks of rental flats were completed at Sokeritehtaantie 15 in Kirkonummi in summer 2015. The new sites were realised with Uponor's R2i elements.
Apartment building Varsta Oy

Apartment building Varsta Oy

Line renovations in blocks of flats can be conducted significantly faster and more easily. The Uponor R2I cassette makes for a problem-free renovation. Thanks to advanced prefabrication, the project period is shorter and the risks are lower. The As Oy Varsta company in Turku is the first R2I pilot site. The site will be completed to an expedited schedule.
Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

An 8-storey apartment is rising in a former bank district in Lahti. The target will contain 265 apartments and is designed by A1 Arkkitehdit Oy and will be built by Nuorisosäätiö. There are 256 rental apartments reserved for students on floors 2-7. Uponor R2I blocks will be installed in all of the student-apartments in connection with bathroom and kitchen elements. Aleksi 5 is the first new destination in which R2I blocks are being delivered and in which sound-absorbing Decibel drains are used.
LEO 250

LEO 250

"LEO 250" brings together sophisticated architecture and superb energy efficiency. Construction time was speed up due to the use of an Uponor systems.
Next stop: comfort

Next stop: comfort

For the conversion of the historic building, the planners relied on decentralized apartment stations from KaMo and floor heating and cooling from Uponor.
Sampo Ltd multistorey building renovation

Sampo Ltd multistorey building renovation

Sampo plc has chosen the Uponor technical wall as the solution for the renovation of the damp areas in several blocks of rental flats. The project is expected to run from March 2015 to February 2017. There are a total of 150 flats at the sites.
Ewha Campus Complex

Ewha Campus Complex

Ewha Womans University had planned the underground campus, which is a global trend for space creation, in order to solve the problem that the available space on the ground was insufficient despite the increase in the space demand in the campus, in accordance with the Ewha Womans University Development Plan in the 21st century.

Avalon Bay

Avalon Bay

Six new apartment buildings, originally designed for CPVC, become a PEX project and include an Uponor Logic...
Tellico Village

Tellico Village

A recurring problem with pinhole-sized pipe leaks in copper required plumbing repair and repiping. Learn why the...
Aurora Micro Apartments

Aurora Micro Apartments

Learn why contractors chose to install an Uponor AquaPEX® plumbing system for these apartments based on product reliability and ease of installation...
Quail Hollow

Quail Hollow

See how a condominium complex replaces their leaking steel-pipe district energy system with Uponor’s Ecoflex pre-...
Multi-family homes

Multi-family homes

Heat interface units provide a high level of warmth and comfort as well as optimum drinking water hygiene in three multi-family homes.
Norman House Residential Development, Derby

Norman House Residential Development, Derby

To help address the housing shortage in Derby, an office block (Norman House) has been converted into 134apartments. As part of the conversion, electric heating, mains cold water distribution systems and hot water cylinders were installed in each room.

Episcopal Homes

Episcopal Homes

Uponor PEX saves time and labor on this multi-resident Midwest Senior Living home job in Burnsville, Minnesota...
George Street

George Street

Uponor products set the standard for off-site construction projects by providing a quick to install, cost-effective and high performance plumbing system for the safe delivery of domestic water services for the world’s tallest modular apartment building.
Sluseholmen

Sluseholmen

The Uponor project ’Sluseholmen’ has served as inspiration for developing a brand new and advantageous plumbing solution.
As a result, Uponor now offers a new, optimized and well structured, compact and easy to use prefab basic unit with flexible connectivity options for managing water and heating in varying types of housing.
From now on, Uponor provides the construction market with these prefab shaft units, primarily intended for modern floor building and terraced houses.
 
Brusaporto apartments

Brusaporto apartments

Two apartment buildings in Brusaporto, Italy, offer a high level of living comfort after renovation – also thanks to the Uponor Minitec underfloor heating system. With its low installation height, it is ideally suited for retrofitting.
Refurbishment of a prefabricated building

Refurbishment of a prefabricated building

During the renovation of a prefabricated building in Zwickau, Robinienweg, a low installation height stood in contrast to the desire for more energy efficiency and comfort through underfloor heating. The solution: a slimline combination of Minitec underfloor heating from Uponor and N 440 leveling screed from Knauf.
Applewood Pointe

Applewood Pointe

Developed by Uponor, this new solution takes the guesswork and freelancing out of piping installations. Each kit, which includes all the needed ProPEX® fittings, adapters, valves, and rings, is delivered to the job site — one kit per room or apartment — along with a material list and an isometric layout for the installer to follow, helping to minimize mistakes and maximize efficiency.
Infinity Forest Residence

Infinity Forest Residence

Accessible and surrounded by nature, the site is surrounded by fresh mountain air, generous sun, surrounded by rich forest and park vegetation.
 The key words are the basis of the philosophy for the construction of Infinity Forest Residence: practicality, efficiency, spaciousness, freedom and healthy living.