Uponor upgrades district Heating network at South Kilburn residential site

The multi-residential properties Swift House and George House in South Kilburn, London, were in need of new pipes to connect the buildings to the district heating system that supplied the two site’s 300 apartments with hot water.
This upgrade was required as the existing pipes were leaking, making the heating system both inefficient and ineffective. As well as supplying the new pipes that would fix the leaking, Uponor also played a pivotal role in devising an installation process which would significantly minimise disruption to the residents.

Datos del proyecto

South Kilburn, London, United Kingdom
Vivienda en altura
Ecoflex, Sistema Multicapa
Finalización: 2021

Involucración Uponor

Resolved leaking district heating network with the use of Ecoflex Thermo; 300 metres of Uponor’s Ecoflex Thermo pipes were used to create the temporary connection and then a further 283 metres of piping was installed in the underground trenches where the previous pipes lay.
The insulation and design of Ecoflex Thermo minimised heat and energy losses, making it highly efficient system which reduced energy wastage and minimised heating costs.
Minimised disruption to the site’s residents while swapping out the old pipes for the new. The results was that no residence was cut off from the heating network for any longer than 12 hours.

Uponor upgrades district heating network at South Kilburn residential site

300 metres of Uponor’s Ecoflex Thermo pipes were used to create the temporary connection and then a further 283 metres of piping was installed in the underground trenches where the previous pipes lay. These new pipes connected the district heating network to the ground floor communal areas, service areas and to the building’s main risers. Uponor’s multi-layer composite pipes (MLC) were used to connect the risers, also supplied by Uponor, to the heat interface units (HIU) that were already installed in the apartments.

A representative from Bouygues UK, said: "We replaced the existing pipes with the Uponor specified products, as these are proven to be much more durable and therefore would be able to maintain a reliable, effective long-term supply of heating and hot water. We were particularly impressed with how robust the pipes were, which would help to avoid future leaks below ground.

It was important to complete this project as safely and quickly as possible to meet the client’s requirements. To achieve this, not only would the quick, easy-to-install nature of Uponor’s solutions be a benefit, but Uponor worked on a strategy that would drastically reduce the amount of time the heating and hot water would be turned off for residents.
This strategy involved firstly installing a temporary above-ground network of pipes and then connecting them to parts of the above ground network which did not require replacement. Once the temporary pipes were connected to maintain heating and hot water, the redundant underground pipes were then dug out and replaced with the new Uponor pipework."

In addition to the robust, reliable nature of Uponor’s pipes, they can also be easily cut-to-length, helping to simplify and speed up the refurbishment project further. The modular connection on Uponor’s risers also helped to streamline the work, as this made it easy to connect and change the pipes.

Uponor coordinated the work so that it could be done quickly and efficiently despite the tight working spaces. This efficiency was essential in order to get the new main line from the plant room operational as soon as soon as possible after the old line had been turned off. The result was that no residence was cut off from the heating network for any longer than 12 hours.

Despite careful planning to ensure that all materials were onsite and ready when required, Uponor’s logistical abilities were tested by the fact that phase two of the project took place during the first COVID-19 lockdown. Despite this, thanks to its robust supply chain, the team was able to ensure the reliable delivery of materials throughout the project. The team also conducted strict risk assessments and developed new onsite operating procedures to ensure that the project could continue to be delivered in a COVID-secure manner.

Benefit
The flexibility of Ecoflex Thermo means that it can be used to connect a decentralised plant room or energy centre to a building without joints, as the pipe can be laid over bumps or around obstacles which for alternative systems would require multiple connections. This design advantage makes the system much more reliable as it eliminates weak points where leaks can occur.
The insulation and design of Ecoflex Thermo minimises heat and energy losses, making it a highly efficient system which reduces energy wastage and minimises heating costs.

Uponor’s design services and logistical support ensured that the project ran smoothly and provided peace of mind in the long term reliability of the site’s heating network.

  “We’ve worked previously with Uponor and knew that they were up to the task. The Uponor team performed site surveys and looked at the situation well in advance in order to come up with a plan that would solve the site’s issues. Throughout the project, Uponor provided ongoing help and support to address the health and safety, and logistical issues associated with carrying out pipework replacement work while ensuring very minimal disruption of services to residents.”
A representative from Bouygues UK

Información del proyecto

Información del proyecto

País
United Kingdom
Finalización
2021
Tipo de proyecto
Reforma
Tipo de edificio
Vivienda en altura

Colaboradores

Colaboradores
Main Contractor:
Bouygues UK

Developer:
L&Q Group

Get more information on our products

Proyectos similares

hi! Cañaveral

hi! Cañaveral

hi! Cañaveral es una promoción VPPB excepcional con Climatización Invisible por suelo radiante Uponor.

AEDAS Homes Qian, Majadahonda

AEDAS Homes Qian, Majadahonda

Qian es una promoción de obra nueva que AEDAS Homes ofrece en Majadahonda. Un proyecto de ecoliving situado en una parcela de 32.500 m² en el que se ha desarrollado una propuesta arquitectónica de 210 viviendas de primer nivel diseñadas por el Estudio de Arquitectura Lamela.
Skyhouse

Skyhouse

Witness the premium customer experience during this hands-on support as this Austin Texas apartment complex converts...
Uponor participates in construction of Maarjamõisa Medical Campus

Uponor participates in construction of Maarjamõisa Medical Campus

2022 sees the completion of Maarjamõisa Medical Campus managed by Tartu University Hospital. The largest centre of its kind in Estonia, the Campus concentrates active medical care in one compact system. Uponor Estonia is participating as advisor, and as supplier of potable and heating water systems in the second construction phase currently under way.
Underfloor cooling adds value to new construction

Underfloor cooling adds value to new construction

Postitalo, the former post office building in downtown Tampere, got a new look in 2017 when it was renovated into new commercial premises and a block of flats was built on top. The heat distribution system of choice was Uponor's underfloor heating and cooling system, which was installed in all flats.
Stylish rock home was renovated with practical viewpoint

Stylish rock home was renovated with practical viewpoint

Sipe Santapukki's appartment in the small multi story building that was built in 1930's was renovated thoroughly. Practicality, intimacy and energy efficient were the starting point for the renovation. Uponor's underfloor heating system and Drain gully system was chosen for the renovation.
A housing company Petreliuksenrinne

A housing company Petreliuksenrinne

The Petreliuksenrinne housing company controls a group of residential buildings that were constructed in 1969. The company manages 124 flats, which were subject to an overhaul of their water supply and sewerage systems. The floor drains, bathrooms, electricity distribution and antenna systems were also overhauled.
New apartment building

New apartment building

Two blocks of rental flats were completed at Sokeritehtaantie 15 in Kirkonummi in summer 2015. The new sites were realised with Uponor's R2i elements.
Apartment building Varsta Oy

Apartment building Varsta Oy

Line renovations in blocks of flats can be conducted significantly faster and more easily. The Uponor R2I cassette makes for a problem-free renovation. Thanks to advanced prefabrication, the project period is shorter and the risks are lower. The As Oy Varsta company in Turku is the first R2I pilot site. The site will be completed to an expedited schedule.
Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

An 8-storey apartment is rising in a former bank district in Lahti. The target will contain 265 apartments and is designed by A1 Arkkitehdit Oy and will be built by Nuorisosäätiö. There are 256 rental apartments reserved for students on floors 2-7. Uponor R2I blocks will be installed in all of the student-apartments in connection with bathroom and kitchen elements. Aleksi 5 is the first new destination in which R2I blocks are being delivered and in which sound-absorbing Decibel drains are used.
LEO 250

LEO 250

"LEO 250" brings together sophisticated architecture and superb energy efficiency. Construction time was speed up due to the use of an Uponor systems.
Next stop: comfort

Next stop: comfort

For the conversion of the historic building, the planners relied on decentralized apartment stations from KaMo and floor heating and cooling from Uponor.
Sampo Ltd multistorey building renovation

Sampo Ltd multistorey building renovation

Sampo plc has chosen the Uponor technical wall as the solution for the renovation of the damp areas in several blocks of rental flats. The project is expected to run from March 2015 to February 2017. There are a total of 150 flats at the sites.
Ewha Campus Complex

Ewha Campus Complex

Ewha Womans University had planned the underground campus, which is a global trend for space creation, in order to solve the problem that the available space on the ground was insufficient despite the increase in the space demand in the campus, in accordance with the Ewha Womans University Development Plan in the 21st century.

Avalon Bay

Avalon Bay

Six new apartment buildings, originally designed for CPVC, become a PEX project and include an Uponor Logic...
Tellico Village

Tellico Village

A recurring problem with pinhole-sized pipe leaks in copper required plumbing repair and repiping. Learn why the...
Aurora Micro Apartments

Aurora Micro Apartments

Learn why contractors chose to install an Uponor AquaPEX® plumbing system for these apartments based on product reliability and ease of installation...
Quail Hollow

Quail Hollow

See how a condominium complex replaces their leaking steel-pipe district energy system with Uponor’s Ecoflex pre-...
Multi-family homes

Multi-family homes

Heat interface units provide a high level of warmth and comfort as well as optimum drinking water hygiene in three multi-family homes.
Norman House Residential Development, Derby

Norman House Residential Development, Derby

To help address the housing shortage in Derby, an office block (Norman House) has been converted into 134apartments. As part of the conversion, electric heating, mains cold water distribution systems and hot water cylinders were installed in each room.

Episcopal Homes

Episcopal Homes

Uponor PEX saves time and labor on this multi-resident Midwest Senior Living home job in Burnsville, Minnesota...
George Street

George Street

Uponor products set the standard for off-site construction projects by providing a quick to install, cost-effective and high performance plumbing system for the safe delivery of domestic water services for the world’s tallest modular apartment building.
Sluseholmen

Sluseholmen

The Uponor project ’Sluseholmen’ has served as inspiration for developing a brand new and advantageous plumbing solution.
As a result, Uponor now offers a new, optimized and well structured, compact and easy to use prefab basic unit with flexible connectivity options for managing water and heating in varying types of housing.
From now on, Uponor provides the construction market with these prefab shaft units, primarily intended for modern floor building and terraced houses.
 
Brusaporto apartments

Brusaporto apartments

Two apartment buildings in Brusaporto, Italy, offer a high level of living comfort after renovation – also thanks to the Uponor Minitec underfloor heating system. With its low installation height, it is ideally suited for retrofitting.
Refurbishment of a prefabricated building

Refurbishment of a prefabricated building

During the renovation of a prefabricated building in Zwickau, Robinienweg, a low installation height stood in contrast to the desire for more energy efficiency and comfort through underfloor heating. The solution: a slimline combination of Minitec underfloor heating from Uponor and N 440 leveling screed from Knauf.
Applewood Pointe

Applewood Pointe

Developed by Uponor, this new solution takes the guesswork and freelancing out of piping installations. Each kit, which includes all the needed ProPEX® fittings, adapters, valves, and rings, is delivered to the job site — one kit per room or apartment — along with a material list and an isometric layout for the installer to follow, helping to minimize mistakes and maximize efficiency.
Infinity Forest Residence

Infinity Forest Residence

Accessible and surrounded by nature, the site is surrounded by fresh mountain air, generous sun, surrounded by rich forest and park vegetation.
 The key words are the basis of the philosophy for the construction of Infinity Forest Residence: practicality, efficiency, spaciousness, freedom and healthy living.