Technopolis Innova 2 in Jyväskylä, Finland is heated by energy piles, Jyväskylä, Finland

Technopolis Innova 2 in Jyväskylä, Finland is heated by energy piles

Technopolis Innova, an office building located in the centre of Jyväskylä, Finland, underwent an expansion in 2011 when a second building was constructed with a gross floor area of 10,000 square metres. The six-storey Technopolis Innova 2 building was constructed on the shore of Lake Jyväsjärvi in spring 2012.

Faktai

Jyväskylä, Finland
Biurų pastatai
Žemės energija
Komplektacija: 2012

Uponor dalyvavimas

2.3km of collection pipes and 38 energy piles

Innova 2 is the first site in Finland to use energy piles, which exploit geothermal energy and were developed in collaboration between Uponor and Ruukki. The steel energy piles are driven or drilled into the ground and they provide the building with both a steady foundation and a large amount of useable energy.

Challenging ground conditions put to good use

Nowadays, it is increasingly common that buildings need to be constructed on ground that provides poor support, so piles are required in any event. This was the case for Innova 2, as the ground in Lutakko, in the centre of Jyväskylä, is relatively soft and the groundwater is at a depth of only 1.5m.

The steel piles that are used for the foundations act as both a supporting structure and an energy solution. The energy piles exploit free geothermal energy from beneath the building. They are particularly suited for use in commercial and office buildings such as Innova 2 where there is a significant need for heating and cooling.

The heating system uses the energy that is stored in the earth, while the low temperature of the ground is used for cooling. In the summer, the cooling system outputs excess heat, which is directed back into the ground, ensuring that the temperature level of the ground remains sufficient for energy generation.

Good results from the pilot site

Ruukki supplied the site with a total of 181 piles, of which 38 were energy piles. The piles were approximately 30 metres in length and they were sunk into Uponor's PE-Xa U collection circuits using ground weights. The collection circuits were then connected to manifolds that were installed into the floor.

The pile and the manifold are connected by an insulated pipe, which minimises heat loss. The trunk lines from the manifolds are led into the heat distribution room via insulated pipes.

"Considering that this was the first site on which energy piles from Ruukki and Uponor were installed, everything went very well. The installation sequence was optimised. It was possible to install the heat collection pipes on top of the base slabs in the final phase. This facilitated circulation on the construction site," says Jyrki Kesti, Technology Director from Ruukki.

A lifecycle-efficient solution

Using energy piles improves the energy efficiency of the building and reduces the carbon footprint. Environmental efficiency has also been proven to increase occupancy rates. Innova 2 was 100% let before it was finished.

The amount of energy that Technopolis Innova 2 can obtain from energy piles has fulfilled expectations. In some respects, it has surpassed expectations.

"We have obtained very good results on this site. The output of the energy piles has been better than forecast," Kesti says.
The six-storey Technopolis Innova 2 building was constructed on the shore of the lake.

Technopolis Innova 2 in Jyväskylä, Finland is heated by energy piles

innova2_1

Projekto informacija

Projekto informacija

Adresas
Lutakonaukio 7, 40100 Jyväskylä, Finland
Šalis
Finland
Komplektacija
2012
Projekto tipas
Naujas pastatas
Pastato tipas
Biurų pastatai

Partneriai

Partneriai
Ruukki Construction

Panašūs projektai

Magnum verslo centras

Magnum verslo centras

MAGNUM – naujas ir vienas iš didžiausių ir moderniausių verslo centrų Kaune.

MAGNUM siekia pozityvių pokyčių, inovatyvios darbo kultūros ir tvaraus atsakingumo. Šiais pokyčiais siekiama įkvėpti ne tik verslo centro rezidentus, bet ir visą, taip sparčiai ir kokybiškai besiplečiantį ir tobulėjantį Kauno miestą.

Bayer Qingdao ECB Lighthouse

Bayer Qingdao ECB Lighthouse

ECB Lighthouse, which serves as the administration building of a Bayer MaterialScience plant in Qingdao, is the first building in China of the Bayer Eco Commercial Building (ECB) Program.
Day-care centre to be built with energy piles

Day-care centre to be built with energy piles

As requested by the City of Vantaa, the Vaaralanpuisto day-care centre has been planned based on the "nearly 0 energy days" concept. Construction work for the day-care centre began in late summer 2016, and the project will be completed in July 2017. Project costs are estimated at EUR 5.4 million, and the day-care centre will accommodate about 130 children. Among the various energy production options available for the site, the City of Vantaa chose the energy pile and solar thermal collector system jointly developed by Uponor and Ruukki.
Auron

Auron

The Uponor Contec ON concrete surface activation heats and cools the AURON office building complex in Munich.
Energy Efficiency Center

Energy Efficiency Center

The foyer, information centre and conference room at the Energy Efficiency Centre in Würzburg uses the Uponor Klett line for energy-efficient radiant heating and cooling.
Brain Box Berlin

Brain Box Berlin

Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.

 

First Uponor Comfort Panel project in Hungary

First Uponor Comfort Panel project in Hungary

An office building, where proper comfort is provided for doing your job The commercial buildings provide more or less limited space as the workplace for people. Therefore cooling the air is an important factor in maintaining their comfort during their stay. In order to keep the daily work undisturbed, the system used should be installed easily, should be efficient economically, and should be hygienic.
Immeuble Delta Green

Immeuble Delta Green

La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.

Standard Bank

Standard Bank

Uponor PE-Xa pipe used for refurbishment of chilled water pipelines in the head office of South Africa's Standard Bank located in Johannesburg.
Posco Green building

Posco Green building

POSCO Green Building located on the Yonsei University International Campus in Songdo,  has been equipped with radiant underfloor heating and cooling and Comfort panels from Uponor.
Agder fengsel in Norway

Agder fengsel in Norway

Statsbygg har fått i oppdrag av Justisdepartementet å bygge nytt fengsel i Agder, med avdelinger i Mandal og på Froland. Uponor fikk i oppdrag med å levere gulvvarme til begge fengslene, ca 100 000 meter med rør. Det er lagt gulvvarme i alle  rom på begge prosjektene. Uponor har også levert tappevann; Mandal fengsel med nye PPM fordelere, Froland fengsel messingfordelere. Uponor har også levert noe Ecoflex rør til prosjektene.
The New Deichmanske Library - Bjørvika, Oslo

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.
Rivergate

Rivergate

The RIVERGATE office building in Vienna, Austria, was certified as a Green Building by the EU andrelies on the efficient Contec ON concrete surface activation.
Berger Logistik

Berger Logistik

Berger Logistik transports goods by land, sea and air around the globe. The company was founded in 1961 by Johann Berger and is based in Wörgl, in the Tyrol region of Austria. 
Sunesis school scheme: Sacred Heart Primary School, West Midlands

Sunesis school scheme: Sacred Heart Primary School, West Midlands

Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.

New office in Västerås with a focus on modern and environmentally friendly solutions

New office in Västerås with a focus on modern and environmentally friendly solutions

The plumbing company Mälardalens Rör in Västerås moved from their premises that they had been in since the end of the 80s. In November 2021, the first test trench was taken and at the turn of the year 2022/2023 they moved into the new office on a plot of land they have owned for a long time. We visited and spoke with the owners Robert Lind and Veronica Lange to hear more about the project.
HAMK's zero-energy hall uses energy piles

HAMK's zero-energy hall uses energy piles

Construction of Finland's first virtually zero-energy hall was completed in May 2015. The hall was built for the Thin Sheet Centre research unit of the Häme University of Applied Sciences (HAMK) and it draws its energy primarily from energy piles and solar panels.
Institut les Mines Telecoms Saclay

Institut les Mines Telecoms Saclay

Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.

Poslovni centar Adris grupe

Poslovni centar Adris grupe

Arhitektonski projekt poslovnog centra Adris u Jagićevoj ulici 33. u Zagrebu, spoj je klasičnog i modernog. Gradnja poslovnog centra započeta je 2011., a završena 2015. kada se u nju smještaju zaposlenici Adris grupe i Croatia osiguranja. 
City Hall

City Hall

The challenge began in 2021 when the building was completely redesigned to cut energy waste. Uponor Ecomate was installed to gain actionable insights into heating, cooling and power usage and improve the Town Hall's energy consumption and carbon footprint.
Edificio de oficias en calle Tutor

Edificio de oficias en calle Tutor

The building located at Calle Tutor 16 (Madrid), owned by Arquia Inmuebles, has undergone a complete renovation and modernization, being partially demolished with the façade stabilized. A project designed by Tuñón y Albornoz Arquitectos and executed by SANJOSE Constructora, where the integration of Uponor's Invisible Air Conditioning in the Matrics raised technical floor developed by company Subway Systems.
Ilmalanlinna, Helsinki

Ilmalanlinna, Helsinki

Due to the interest rates of the floor structures, underfloor heating at Uponor's new head office required a solution that would raise the floor surface as little as possible. A functional result was achieved with an unusual implementation, low-structure underfloor heating plates, which are mainly used in renovations of detached houses, and which increase the floor height by only 15 millimetres.