Atsaukums: Uponor atsauc Fluvia T sajaukšanas mezglu Push-23-B-W (preces Nr. 1078304) | Vairāk
Uponor Latvia
Ganību dambis 7a, Rīga, LV-1045
Apskatīt gadījumu

Modernization of Heviz Thermal Lake and Saint Andrew Hospital, Heviz, Hungary

Modernization of Heviz Thermal Lake and Saint Andrew Hospital

Projekta fakti

Heviz, Hungary
Sporta objekts
Rūpnieciski izolēti cauruļvadi
Pabeigt: 2015

Uponor iesaiste

15 000 m2

The development of the area has been started at the of the 18th century, and it has gained its current facade through continuous constructions and renovations. The building complex by the Thermal Lake incorporates the Hospital for Rheumatic Diseases and a hotel. The heating and hot water production is provided by central boiler-houses. The produced energy was conducted to the buildings via steel pipe-lines installed into existing individual trenches. This existing network became worn-out throughout the years and turned outdated. Thus at the end of 2014, the system went through modernization within a serious energetics investment. This modernization utilized the UPONOR Ecoflex flexible pipe system in a length of 1000 metres.

Local heat distribution for any solution

It became clear even in the planning phase that the construction can only be carried out with plastic pipe-lines, because of the crossing of numerous existing utility conduits. The UPONOR Ecoflex can be installed with an exceptionally small bending radius, which enables the implementation of tight corners. This has been proven during the construction. The installation was much more flexible, simple and faster.

One aim of the investment was to make the operation of the system more economic and energy-efficient, thus the condensing boiler were augmented with a heat pump. The operation cost are further decreased by the multi-layer PEX-based insulation inside the UPONOR pre-insulated pipe system, that can slip on one another (making bending easier). Along with flexibility and handleability, the other reason was that the quality of the insulation does not change significantly during time. The insulation is coated by a ribbed HDPE cylinder that provides mechanical protection for the system. 25 to 110 mm diameter UPONOR pipe-lines were used during the construction, which were cut to length and delivered in coil form. Both the heating and the water supply pipes were replaced during the modernization.

The construciton of the pipe-line was finished in December 2014, thus in most of the winter the new, modern and efficient pipe system was used. By the end of the construction, the original idea was implemented: an easily installable, energy-efficient system was created for everybody's contentment.

Projekta informācija

Projekta informācija

Adrese
8380 Hévíz, Dr. Schullhof V. sétány 1.
Valsts
Hungary
Pabeigt
2015
Projekta veids
Renovācija
Ēkas tips
Sporta objekts

Partneri

Partneri

Installer
Z-Pannon Zrt (Zalaegerszeg)

Līdzīgi projekti

Boost to energy efficiency

Boost to energy efficiency

PowerPark's indoor karting hall became a functional and comfortable multipurpose hall when concrete replaced the asphalt floor and an energy-efficient and cost-effective Uponor Quattro floor heating system was installed underneath.
Icerink in "Városliget"

Icerink in "Városliget"

The history of the skating-rink The skating-rink of the Városliget, which was opened in 1926, was the second skating-rink (after Vienna) in Europe. In WWII it suffered a bomb hit, and in the 1950's it was only repaired temporarily. The latest large-scale renovation was carried out in 1986, when the modified power-house and condenser plant were installed, and the new, third layer of pipes was laid on the rink. After some small and large engineering modifications (1999 to 2001) – since the engineering system was outdated and spoiled – Municipality of Budapest called for a tender for comprehensive architectural and engineering reconstruction of the Skating-rink of Városliget.
Thermal Bath in Egerszalók

Thermal Bath in Egerszalók

The real sight of Egerszalók is the thermal well springing in the Southern part of the village, and the travertine hill created by the running water, which became known as the "salt-hill" over the years.
Ice-rink in Pesterzsébet

Ice-rink in Pesterzsébet

The facility is located in district XX. of Budapest, at Zodony street 1., in the area near the Gubacsi bridge and the Helsinki road, in the vicinity of the Gubacsi residential block and the Mediterrán subdivision.
Stavanger Concert Hall

Stavanger Concert Hall

The new concert hall is an outstanding building and a new benchmark. Uponor has been involved for the underfloor heating and plumbing system as well as snow melting system for outdoor areas.
Stades de Bienne

Stades de Bienne

 

The Stades de Bienne gives Biel a brand-new, versatile meeting point for sport, culture, business, eating and shopping and is attracting visitors from all over the region. Due to open in 2015, Uponor AG Schweiz has contributed to this project by providing thermoactive building component systems (TABS).

Addenbrookes Hospital

Addenbrookes Hospital

Addenbrook hospital was one of the first provincial voluntary hospitals in UK and is currently undergoing a renovation program to replace all the service pipework.
Ashville Sports Centre, Harrogate

Ashville Sports Centre, Harrogate

As part of a £3million project, Ashville Sports Centre will be redeveloped by September 2017.
Once completed, the sports centre will boast a significantly enlarged gymnasium, a studio, 9 changing facilities, a reception/café area and new staff offi ces. The swimming
pool will also be redecorated and receive much needed maintenance.
CEF headquarters, Durham

CEF headquarters, Durham

When national electrical wholesaler company, City Electrical Factors (CEF), decided to invest in construction of a new 3,500m2 headquarters to provide a more contemporary, fit for purpose and environmentally efficient office environment, the resulting design from architect Faulkner Brown was a very conceptual, fair faced concrete building.
Dudley College, Dudley

Dudley College, Dudley

 The Advance II project is part of a transformation programme at Dudley College and the fifth new teaching facility to be constructed as part of the ‘Dudley Learning Quarter’ campus development.
Manchester Metropolitan University, Manchester

Manchester Metropolitan University, Manchester

The innovative building, incorporates three individual towers and two atria and  boasts not only world-class teaching and learning facilities for students, staff and businesses, but also catering and leisure areas for all students, and conference venues which will draw companies and industry associations from across Europe and beyond.
Mooreland Care Home

Mooreland Care Home

Uponor Ltd provided the complete solution to Mooreland Care Home's heating and plumbing needs, offering complete flexibility and also a quality installation.
Toyota Park

Toyota Park

See how our turf-conditioning application using Wirsbo hePEX™ provided a chilly mid-western soccer stadium with...
Sieben Welten

Sieben Welten

Experience Asia, Africa, Andalusia, Mexico, Arabia, India and Japan – Uponor supports the energy use concept of the ‘Sieben Welten Therme & Spa Resort’.