Modernization of Heviz Thermal Lake and Saint Andrew Hospital, Heviz, Hungary
Modernization of Heviz Thermal Lake and Saint Andrew Hospital
Projekta fakti
Uponor iesaiste
The development of the area has been started at the of the 18th century, and it has gained its current facade through continuous constructions and renovations. The building complex by the Thermal Lake incorporates the Hospital for Rheumatic Diseases and a hotel. The heating and hot water production is provided by central boiler-houses. The produced energy was conducted to the buildings via steel pipe-lines installed into existing individual trenches. This existing network became worn-out throughout the years and turned outdated. Thus at the end of 2014, the system went through modernization within a serious energetics investment. This modernization utilized the UPONOR Ecoflex flexible pipe system in a length of 1000 metres.
Local heat distribution for any solution
It became clear even in the planning phase that the construction can only be carried out with plastic pipe-lines, because of the crossing of numerous existing utility conduits. The UPONOR Ecoflex can be installed with an exceptionally small bending radius, which enables the implementation of tight corners. This has been proven during the construction. The installation was much more flexible, simple and faster.
One aim of the investment was to make the operation of the system more economic and energy-efficient, thus the condensing boiler were augmented with a heat pump. The operation cost are further decreased by the multi-layer PEX-based insulation inside the UPONOR pre-insulated pipe system, that can slip on one another (making bending easier). Along with flexibility and handleability, the other reason was that the quality of the insulation does not change significantly during time. The insulation is coated by a ribbed HDPE cylinder that provides mechanical protection for the system. 25 to 110 mm diameter UPONOR pipe-lines were used during the construction, which were cut to length and delivered in coil form. Both the heating and the water supply pipes were replaced during the modernization.
The construciton of the pipe-line was finished in December 2014, thus in most of the winter the new, modern and efficient pipe system was used. By the end of the construction, the original idea was implemented: an easily installable, energy-efficient system was created for everybody's contentment.
Projekta informācija
Projekta informācija
Partneri
Installer
Z-Pannon Zrt (Zalaegerszeg)
Līdzīgi projekti
Primary school Kundl
Maksimir stadium, Zagreb
NK Zagreb's Training camp ZAGREBello
1. FC Brno, Football stadium
Boost to energy efficiency
Icerink in "Városliget"
Thermal Bath in Egerszalók
Refrigeration technology at the city icerink of Pápa
Ice-rink in Pesterzsébet
Kecskemét icerink – Go-kart Hotel
Blue Lagoon, Iceland
"Žalgirio" Arena
Žalgirio Arena has been given a BREEAM In-Use certificate – the first for an existing sports venue in the world.
Stavanger Concert Hall
Tap water installation for a new hockey stadium in Bratislava
The venue of the 75th IIHF World Ice Hockey Championship, which were held in spring 2011, utilised Uponor’s solution for tap water installation.
Turf conditioning at NK Maribor stadium in Slovenia
The Ágora Building, Valencia
Stades de Bienne
The Stades de Bienne gives Biel a brand-new, versatile meeting point for sport, culture, business, eating and shopping and is attracting visitors from all over the region. Due to open in 2015, Uponor AG Schweiz has contributed to this project by providing thermoactive building component systems (TABS).
Addenbrookes Hospital
Ashville Sports Centre, Harrogate
Once completed, the sports centre will boast a significantly enlarged gymnasium, a studio, 9 changing facilities, a reception/café area and new staff offi ces. The swimming
pool will also be redecorated and receive much needed maintenance.