Aizpildiet BIM iepirkumu grozu no produktu kataloga

550 Atrastie rezultāti
City Hall
Biroja ēka

City Hall

The challenge began in 2021 when the building was completely redesigned to cut energy waste. Uponor Ecomate was installed to gain actionable insights into heating, cooling and power usage and improve the Town Hall's energy consumption and carbon footprint.

Uponor pressure pipe system Profuse in Borås town
Publiskās ēkas

Uponor pressure pipe system Profuse in Borås town

Better water flow in Frufällan

Fish farming with the smallest possible footprint
Rūpnieciskais īpašums

Fish farming with the smallest possible footprint

Andfjord Salmon AS, a Norwegian fish farming company, has the ambition to create a sustainable, environmentally and fish-friendly onshore facility – with the smallest possible footprint. This patented facility combines the best from both traditional ocean net-pens and land-based salmon farming. The intake and outfall lines are built with highly durable Weholite PE pipes and panels with a 100-year life span.

Construction of the N-S road in the area of mining damage
Transports un loģistika

Construction of the N-S road in the area of mining damage

Problem-free operation in areas with mining damage in the Upper Silesia Industrial District thanks to the Uponor Infra pipe systems and retention tanks.
 
Renovation of the sewage collector
Publiskās ēkas

Renovation of the sewage collector

In 2021, a renovation of a corroded sewage collector was carried out in Swarzewo using a tight-fitting method.

Renovation of the railway culvert
Transports un loģistika

Renovation of the railway culvert

Uponor Infra Sp. z o.o. supplied Weholite PEHD DN3000 SN8 with pipes for the renovation of a railway culvert.

Retention tanks for the railway station
Transports un loģistika

Retention tanks for the railway station

The modernisation of the Warsaw West railway station is the largest construction project currently underway in the Polish capital.

Renovation of a water supply system in an area with mining damage
Publiskās ēkas

Renovation of a water supply system in an area with mining damage

In 2020, the water main between the reservoirs and the Paprocany pumping station in Tychy was upgraded with PE-HD pressure pipes by Uponor Infra.

Battery of retention tanks
Publiskās ēkas

Battery of retention tanks

In Mielec, modern storm water and snowmelt retention systems have been built, which will solve the problems with periodical flooding of streets and buildings in the city centre.

Emergency pipeline on a pontoon bridge
Publiskās ēkas

Emergency pipeline on a pontoon bridge

In 2020, Uponor did an outstanding job of installing an emergency pipeline on a pontoon bridge after an underground GRP sewage collector failed in Warsaw, the capital of Poland. 

Storm water of the railway station
Transports un loģistika

Storm water of the railway station

The specificity of constructing a storm water system as part of railway projects is that it must be resistant to, among other things, dynamic loads from the passing trains. In the case of the station in Konin, an important element of the storm water system is the retention tanks

Quick installation in the Konotopa channel
Publiskās ēkas

Quick installation in the Konotopa channel

The renovation of the Konotopa channel is one of the most interesting hydro projects recently completed in Warsaw, Poland.